Professional Documents
Culture Documents
BRIGADA ESKWELA
RESOURCE MOBILIZATION FORM
Instruction: Using the completed BE Form 01: Physical Facilities Needs Assessment as basis, summarize the resources (materials and manpower)
needed and list down the potential source or partners to be tapped. Add additional sheet if needed. The Status and Remarks columns should be updated
regularly to determine progress in acquiring resources needed.
Key
Strategies/Plan of
Materials Needed Quantity Persons/Organization to Person Responsible Status Remarks
Action
be Tapped
Salandrado 10w 1 load LGU Donation School Head/ School Accomplished
10mm x 20 12 pu LGU Physical Facilities
9 mm x 20 32 LGU Coordinator
Tie wire 2 kls LGU
Portland Cement 7 bgs LGU
Cu nail #2 2 kls LGU
Cu nail #3 1 kl LGU
Cu nail #4 1 kl LGU
Diesel LGU
Pad lock 1pc LGU
Push valve 2 pcs LGU
Cement 20 bgs LGU
CHB #4 490 pcs LGU
Construction materials LGU
Assorted nails 6 kls LGU
Cement 15 bgs LGU
Cement 20 bgs LGU
Sahara 4 packs LGU
Construction LGU
materials/supplies
PVC pipe 2” 2 pcs LGU
Construction materials LGU
Plumbing materials LGU
Construction materials LGU
Diesel LGU
PVC Pipe 2” 2 pcs
G.1 Plug 3/4 2 pcs
Construction/Electrical
materials
Plumbing materials
Plumbing materials
assorted
PPR materials 3 pcs
Electrical materials
Toks #6 4 boxes
Cement nad electrical 10 bgs
supplies
Electrical materials
(assorted)
Cement 10 bgs
CWN
Diesel
Construction and
Electrical materials
1 load S2
sand/solignum/baby roller
PE adaptor ½ 1 pc
Coupler 1/2 1 pc
G.I Elbow
P.E pipe 3/4
P.E adaptor
Nipple
Labor Key
Strategies/Plan of
Skills/Volunteers Quantity Persons/Organization to Person Responsible Status Remarks
Action
Needed be Tapped
Prepared by: Noted:
___________________________________________ _______________________________________________