You are on page 1of 6

Republic of the Philippines

Department of Education
Region V
SCHOOLS DIVISION OFFICE OF CAMARINES SUR

SCHOOL: Bikol High School for the Arts and Culture

ADDRESS: BRBDP Building, San Jose, Pili, Camarines Sur

DISTRICT: Pili West

1. TITLE: 2. SCHEDULE OF IMPLEMENTATION 3. PROPONENT:

Repair of School
Facilities Q2 June 06-10, 2022
Bikol High School for the
Arts and Culture

4. PROJECT LOCATION: BRBDP Building, San Jose, Pili, Camarines Sur

5. GOALS/OBJECTIVES: to repair the ceiling one portion of dilapidated room of BHSAC that is
regularly being flooded during rainy days and install electrical wiring and lights.

6. IMPLEMENTING UNIT/OFFICE: Office of the School Head

7. OVERVIEW/RATIONALE:

Safe and conducive learning environments are essential to reaching students’, teachers’, and the
school’s potential. In connection with this, repair of ceiling one portion of dilapidated classroom and
installation of electrical wiring are needed to realize this potential.

8. ACTIVITIES/STRATEGIES: (sequentially arranged activities/process/time frame/ person


responsible)

Submission of Proposal for Approval – May 16, 2022

Canvassing of Materials – May 19, 2021

Procurement of Materials – June 01, 2021

Repair and Construction – June 06-10 , 2021

9. BENEFICIARIES: Students, Parents, Faculty, and Staff

10. SOURCE OF FUND: School’s MOOE

11. BUDGET ARY REQUIREMENTS (please refer to the attached specifications per item)
Republic of the Philippines
Department of Education
Region V
SCHOOLS DIVISION OFFICE OF CAMARINES SUR
Quarter Title of the Project Amount of Labor Total
Materials (Material x
(Budget/1.3) 30%)

Q2 Repair of Ceiling and


Electrical Wiring of 1
Classroom

GRAND TOTAL

12. REPORTING AND EVALUATION:

13. ENCLOSURES:

Pre-pictures

Project Locator Map

New Project Design

Annual Procurement Plan

Prepared by: Recommending Approval:

ROCHELLE G. RABEJE PEDRO J. PELONIO, PhD

School Head Chief, SGOD

Approved:

SUEÑO S. LUZADA, JR., PhD

Assistant School Division Superintendent


Republic of the Philippines
Department of Education
Region V
SCHOOLS DIVISION OFFICE OF CAMARINES SUR

PRE-PICTURES
Republic of the Philippines
Department of Education
Region V
SCHOOLS DIVISION OFFICE OF CAMARINES SUR

PROJECT LOCATOR MAP


Republic of the Philippines
Department of Education
Region V
SCHOOLS DIVISION OFFICE OF CAMARINES SUR
NEW PROJECT DESIGN
CEILING AND ELECTRICAL REPAIR
Republic of the Philippines
Department of Education
Region V
SCHOOLS DIVISION OFFICE OF CAMARINES SUR

DESCRIPTION/ SPECIFICATION OF ITEM/ARTICLE


ITEM DESCRIPTION/ QUANTITY UNIT COST TOTAL
SPECIFICATION
(size, color, material
used, capacity, features,
thickness, height, weight,
length, diameter, other
specific details)

Coco Lumber 2x6x12 ft 30 360 PHP 10,800.00


Marine Plywood 1/4 size thickness 27 400 PHP 10,800.00
Nail 1 1/2 inches 5 160 PHP 800.00
Nail 3" inches 5 136 PHP 680.00
PDX Wire PDX Electrical Wire Type
NM - 14/2 Size: 2.6 mm² x
2C, 60°C 600V 4 2300 PHP 9,200.00
Flexi Hose 1/2 inch 50 meters 1 799 PHP 799.00
E14 Candelabra Socket
Celing Receptacle 3A 250V 6 43 PHP 258.00
Light Bulb LED Lite G95 Globe
Lamp E27 Base 12 Watts
(Daylight) - LLG95E27-
12W-DL 8 300 PHP 2,400.00
Electrical Tape 16-Meter
Electrical Tape (Black) 4 35 PHP 140.00
PVC Junction Box
Cover 7 29 PHP 203.00
Surface Type PVC
Junction Box 7 29 PHP 203.00
2 pcs. 1-Way Illuminated
Light switch
Switch in Classic Plate 3 240 PHP 720.00
2 pcs Convenience Outlet
& Universal Outlet in
Outlet Classic Plate 3 230 PHP 690.00
Sub Total PHP 37,693.00

Direct Cost PHP 49,000.00


Labor Cost PHP 11,307.00
Total Material Cost PHP 37,693.00

Prepared by: Approved:

NORIEL P. EJES ROCHELLE G. RABEJE


Physical Facilities Coordinator School Head

You might also like