Name of
Renovation of Gulayan sa Paaralan
Activity
In 2018 the Department of Education(DepEd) issued a memorandum no. 95 which calls for the
maintenance of GPP in elementary and secondary schools where vegetable production and
consumption among students are encouraged for better health and nutrition. The memorandum
is set to campaign and establish an integrated garden within the school premise to rally the
students, the families, school officials and the community in where the school is located the
importance and benefits of eating vegetables. In addition to this, its goal is to promote
knowledge to all the students on how to cultivate, grow and maintain vegetables; may it be in
school or in their individual homes. Promoting the nutritional value of consuming vegetables is
an added benefit.
Background
The La Castellana National High School - Technological and Livelihood Education Department
will spearhead the "Gulayan sa Paaralan" Project. The TLE department will monitor and manage
the school-based vegetable garden. The "Gulayan sa Paaralan" is a mini garden that will be
focused on cultivating, planting herbs, vegetables, fruits and spices in any space available within
the school backyard. The "Gulayan sa Paaralan" will be in any form of garden patches, pots,
vertical walls and trellises using only recycled materials such us; empty bottles, cans, basins,
trays, empty sacks, used tires and other recyclable materials to conserve and protect our
environment.
1
ACTIVITY DESIGN
Area 4 Compose Area and Mobile plants Home Ecomonics Teachers
Area 5 Trellises Industrial Arts and ICT Teahers
Area 6 Malunggay Area Home Ecomonics Teachers
Area 7 Water supply Alejandro Timbad and members
Budgetary
Requirements Republic of the Philippines
Department of Education
DIVISION OF NEGROS OCCIDENTAL
LA CASTELLANA NATIONAL HIGH SCHOOL
PROGRAM OF WORKS (POW)
METAL WORKS
MASONRY WORKS
MATERIALS:
UNIT
TOTAL UNIT
QUANTITY UNIT MATERIAL DESCRIPTION COST in
COST in Php
Php
MASONRY WORKS
25 6,
25 BAGS PORTLAND CEMENT @
0.00 250.00
70 3,
5 Cu.M SAND @
0.00 500.00
79 1,
2 Cu.M GRAVEL @
0.00 580.00
4
8 PCS 1"X2"X6' R/L @
5.00 360.00
11 2,
25 LENGTH DEFORMED BAR 9 MM @
0.00 750.00
1 5,
390 PCS HOLLOWBLOCKS @
3.00 070.00
8
4 KILOS GI WIRE # 16 @
5.00 340.00
8
2 ROLL 1MM NYLON STRING @
0.00 160.00
35
1 SHEET ORDINARY PLYWOOD 1/4 X 4 X 8 @
0.00 350.00
20,
SUB-TOTAL A:
360.00
METAL WORKS
1,20 10,
9 LENGTH GI PIPE S. 40 X 1 1/2" Ø @
0.00 800.00
75 6,
9 LENGTH GI PIPE S. 40 X 3/4" Ø @
0.00 750.00
17
3 KG E6013 ELECTRODE X 1/8 @
0.00 510.00
1,50 16,
11 ROLL CYCLONE WIRE 6' @
0.00 500.00
34,
SUBTOTAL B:
560.00
2
ACTIVITY DESIGN
OTHER MATERIALS NEEDED AFTER CONSTRUCTION
75
1 GAL METAL PRIMER GRAY @
0.00 750.00
6
4 PCS ROLLER PAINT @
0.00 240.00
5
2 PCS PAINT PAN @
0.00 100.00
1,
SUBTOTAL C:
090.00
SUMMARY :
Total Material Cost in Php ( SUB-
TOTAL A+B+C): 56,010.00
Labor Cost:
MASONRY @ 35% 7,126.00
METAL WORKS @ 40% 13,824.00
1,
@
EXCAVATION PAKYAW 200.00
22,150.00
METAL WORKS
MASONRY WORKS
MATERIALS:
UNIT COST in TOTAL UNIT COST
QUANTITY UNIT MATERIAL DESCRIPTION
Php in Php
MASONRY WORKS
9,000.0
36 BAGS PORTLAND CEMENT @ 250.00
0
3,500.0
5 Cu.M SAND @ 700.00
0
3,520.0
32 LENGTH DEFORMED BAR 9 MM @ 110.00
0
4,992.0
384 PCS HOLLOWBLOCKS @ 13.00
0
170.0
2 KILOS GI WIRE # 16 @ 85.00
0
21,182.0
SUB-TOTAL A:
0
SUMMARY :
Total Material Cost in Php 21,182.00
Labor Cost:
MASONRY @ 35% 7,413.70
1,200.0
@
EXCAVATION PAKYAW 0
8,613.70
3
Prepared by:
Signed:
JAVEN S. SIOSAN
TLE Department Head
Approved: