ACTIVITY DESIGN
Name of
Renovation of Gulayan sa Paaralan
Activity

Theme Enhancing Fully functional Gulayan sa Paaralan

Venue La Castellana National High School

Inclusive November 2020


Dates

In 2018 the Department of Education(DepEd) issued a memorandum no. 95 which calls for the
maintenance of GPP in elementary and secondary schools where vegetable production and
consumption among students are encouraged for better health and nutrition. The memorandum
is set to campaign and establish an integrated garden within the school premise to rally the
students, the families, school officials and the community in where the school is located the
importance and benefits of eating vegetables. In addition to this, its goal is to promote
knowledge to all the students on how to cultivate, grow and maintain vegetables; may it be in
school or in their individual homes. Promoting the nutritional value of consuming vegetables is
an added benefit.
Background
The La Castellana National High School - Technological and Livelihood Education Department
will spearhead the "Gulayan sa Paaralan" Project. The TLE department will monitor and manage
the school-based vegetable garden. The "Gulayan sa Paaralan" is a mini garden that will be
focused on cultivating, planting herbs, vegetables, fruits and spices in any space available within
the school backyard. The "Gulayan sa Paaralan" will be in any form of garden patches, pots,
vertical walls and trellises using only recycled materials such us; empty bottles, cans, basins,
trays, empty sacks, used tires and other recyclable materials to conserve and protect our
environment.

1. Have a fully functional Gulayan sa Paaralan.


Objectives 2. Be a generating source of income of the department.
3. Improve and increase vegetable production and consumption.

1. Project Proposal of Gulayan sa Paaralan


2. Accomplishment Report of the activity
Outputs
3. Project Work Plan and Budget Matrix
4. Functioonal Gulayan sa Paaralan

1. Weeklong activity that will only be joined by all TLE teachers


2. TLE teachers are responsible for their adopted area At Gulayan sa Paaralan
Methodology
3. Agricultural Arts Teachers are assigned to maintain the Gulayan sa Paaralan

Participants TLE Teachers

Program of Day and Time Contest/Activity Coordinator/Point Persons


Activities November 4--6,2020 Planning for the Renovation of Gulayan Agricultural Arts Teachers
sa Paaralan
September 10-13, 2020 Preparing for the renovation of Gulayan Agricultural Arts Teachers
sa Paaralan
November 16-27, 2020 Gulayan Plan Layout (Adopt a area) Antonie Berja and members
Area 1 Entrance and Fences Dante Patricio and Jerson Arivalo
Area 2 Garden plot for vegetables Alvin Apongan and members
Area 3 Garden plot for herbs and ornamental Nanette Ambahan and Agri teachers
plants

1
ACTIVITY DESIGN
Area 4 Compose Area and Mobile plants Home Ecomonics Teachers
Area 5 Trellises Industrial Arts and ICT Teahers
Area 6 Malunggay Area Home Ecomonics Teachers
Area 7 Water supply Alejandro Timbad and members

Budgetary
Requirements Republic of the Philippines
Department of Education
DIVISION OF NEGROS OCCIDENTAL
LA CASTELLANA NATIONAL HIGH SCHOOL
PROGRAM OF WORKS (POW)

Name of Project: FENCING OF GULAYAN


Location; LA CASTELLANA NATIONAL HIGH SCHOOL
FUND SOURCE:
Scope of work:

METAL WORKS
MASONRY WORKS

MATERIALS:
UNIT
TOTAL UNIT
QUANTITY UNIT MATERIAL DESCRIPTION   COST in
COST in Php
Php
MASONRY WORKS
25 6,
25 BAGS PORTLAND CEMENT @
0.00 250.00
70 3,
5 Cu.M SAND @
0.00 500.00
79 1,
2 Cu.M GRAVEL @
0.00 580.00
4
8 PCS 1"X2"X6' R/L @
5.00 360.00
11 2,
25 LENGTH DEFORMED BAR 9 MM @
0.00 750.00
1 5,
390 PCS HOLLOWBLOCKS @
3.00 070.00
8
4 KILOS GI WIRE # 16 @
5.00 340.00
8
2 ROLL 1MM NYLON STRING @
0.00 160.00
35
1 SHEET ORDINARY PLYWOOD 1/4 X 4 X 8 @
0.00 350.00
20,
SUB-TOTAL A:
360.00
METAL WORKS
1,20 10,
9 LENGTH GI PIPE S. 40 X 1 1/2" Ø @
0.00 800.00
75 6,
9 LENGTH GI PIPE S. 40 X 3/4" Ø @
0.00 750.00
17
3 KG E6013 ELECTRODE X 1/8 @
0.00 510.00
1,50 16,
11 ROLL CYCLONE WIRE 6' @
0.00 500.00
34,
SUBTOTAL B:
560.00

2
ACTIVITY DESIGN
OTHER MATERIALS NEEDED AFTER CONSTRUCTION
75
1 GAL METAL PRIMER GRAY @
0.00 750.00
6
4 PCS ROLLER PAINT @
0.00 240.00
5
2 PCS PAINT PAN @
0.00 100.00
1,
SUBTOTAL C:
090.00

SUMMARY :
Total Material Cost in Php ( SUB-
TOTAL A+B+C): 56,010.00
Labor Cost:
MASONRY @ 35% 7,126.00
METAL WORKS @ 40% 13,824.00
1,
@
EXCAVATION PAKYAW 200.00
22,150.00

Total Project Cost in Php


(Materials + Labor)
78,160.00

Name of Project: GARDEN PLOT


Location: LA CASTELLANA NATIONAL HIGH SCHOOL
FUND SOURCE:
Scope of work:

METAL WORKS
MASONRY WORKS

MATERIALS:
UNIT COST in TOTAL UNIT COST
QUANTITY UNIT MATERIAL DESCRIPTION  
Php in Php
MASONRY WORKS
9,000.0
36 BAGS PORTLAND CEMENT @ 250.00
0
3,500.0
5 Cu.M SAND @ 700.00
0
3,520.0
32 LENGTH DEFORMED BAR 9 MM @ 110.00
0
4,992.0
384 PCS HOLLOWBLOCKS @ 13.00
0
170.0
2 KILOS GI WIRE # 16 @ 85.00
0
21,182.0
SUB-TOTAL A:
0

SUMMARY :
Total Material Cost in Php 21,182.00
Labor Cost:
MASONRY @ 35% 7,413.70
1,200.0
@
EXCAVATION PAKYAW 0
8,613.70

Total Project Cost in Php


29,795.70
(Materials + Labor)

3
Prepared by:

LILY CATHYLENE B. ESTORIA


TLE Coordinator

Signed:

JAVEN S. SIOSAN
TLE Department Head

Approved:

MA. TRESSA G. ELBANBUENA


Principal III