Republic of the Philippines

Department of Education
Region VII, Central Visayas
Division of Bohol
DISTRICT OF VALENCIA
Valencia

PROGRAM OF WORK

Project Title: SCHOOL MINOR REPAIR OF THE DAMAGES FROM TYPHOON


Component REPAIR IF SCHOOL OFFICE
Physical Target: SCHOOL REPAIR
Name of School: OMJON ELEMENTARY SCHOOL
Brgy./Mun./Province: OMJON VALENCIA BOHOL
Total Project Cost:
Modality of
Implementation:
Project Duration: 2 WEEKS
Equipment Needed:
Technical Personnel:
Scope of % of Unit Total Fund Source
Item No. Qty. Unit
Work Total Price Amount DepEd PTA LGU NGO

I MATERIALS 29,375.00 29,375.00


PANDAY 3,000.00 3,000.00

VII
Sub-total

Breakdown of Cost Estimates BC/PTA NGO TOTAL AMOUNT


A. Direct Cost
1. Materials 29,735.00
2. Labor (Manual) 3,000.00
Sub-Total
Grand Total 32,375.00

Prepared by:

ROSARIO A. GALORPORT EdD ZED KENNITH MOLINA TIRSO EGAM


HT/Principal Industrial Arts Teacher PTA President
Republic of the Philippines
Department of Education
Region VII, Central Visayas
Division of Bohol
DISTRICT OF VALENCIA
Valencia

BILL OF MATERIALS AND COST ESTIMATES

Project : REPAIR OF SCHOOL LIBRARY


School : OMJON ELEMENTARY SCHOOL
Location : OMJON VALENCIA, BOHOL
Component : OMJON ELEMENTARY SCHOOL
Project Cost : 22,872.00
I. Materials Cost

Item Qty. Unit Particular Unit Total DEPED MLGU BC/PTA NGO
No. cost Cost
1 1 KG FINISHING NAIL 95.00 95.00 95.00
2 16 PCS LATIS 1X1 270.00 4320.00 4320.00
3 18 PCS MOULDING 250.00 4500.00 4500.00
4 2 SACK SKIMCOAT 575.00 1150.00 1150.00
5
6
7
8
9
10
11
Sub-Total 10,065.00 10,065.00
Eng'g Supervision -
contingencies/Labor
Sub-Total
GRAND TOTAL 10,065.00
Prepared by:

ZED KENNETH MOLINA ROSARIO A. GALORPORT


I.A Teacher HT-I

TIRSO IGAM
PTA President
Republic of the Philippines
Department of Education
Region VII, Central Visayas
Division of Bohol
DISTRICT OF VALENCIA
Valencia

BILL OF MATERIALS AND COST ESTIMATES

Name of Project REPAIR OF SCHOOL LIGHTNING


Location of Project OMJON ELEMENTARY SCHOOL
Estimated Cost of Project 9,492.30
Scope of Work REPAIR OF SCHOOL LIGHTNING
Source of Funds :DepEd

UNIT
ITEM DESCRIPTION QTY. UNIT TOTAL
COST
1 PDX WIRE 25
2 WHITE PAINT 4
3 METAL PRIMER 1
4 CHOCO BRPOWN 1
5 CREAM 1
6 THALO GREEN 3
7 RAW SIENNA 1
8 LAMP BLACK 1
9 PAINT THINNER 10
10 PAINT BRUSH 5
11 PAINT BRUSH 3
12 PAINT ROLLER 10
13 MESH TAPE 2
14 CYLINDER HASH 1
15 FIREFLY BULB 5
16 RUGBY 6
17 FIREFLY FEDCRW 3
18 ROYU 1
19 JUNCTION BOX 1
20 ROYU REDSW1 1
21 OMNI P3-EU 2

TOTAL COST OF MATERIALS

Prepared by:

ENRIQUE BALITE
PTA President

Recommending Approval:

SERGIA S. PALACA
Central School Principal
Republic of the Philippines
Department of Education
Region VII, Central Visayas
Division of Bohol
DISTRICT OF VALENCIA
Valencia

PROGRAM OF WORK

Date: JANUARY 28,2023

Project Title: REPAIR OF SCHOOL LIBRARY


Component REPAIR OF SCHOOL LIBRARY
Physical Target: SCHOOL LIBRARY
Name of School: OMJON ELEMENTARY SCHOOL
Brgy./Mun./Province: OMJON VALENCIA, BOHOL
Total Project Cost: 22,872.00
Modality of
Implementation:
Project Duration: 2 DAYS
Equipment Needed:
Technical Personnel:
Scope of % of Unit Total Fund Source
Item No. Qty. Unit
Work Total Price Amount DepEd PTA LGU NGO

I SCHOOL LIBRARY 100% 10,065.00 10,065.00


II
III
IV
V
VI
VII
Sub-total

Breakdown of Cost Estimates BC/PTA NGO TOTAL AMOUNT


A. Direct Cost
1. Materials 10,065.00
2. Labor (Manual)
Sub-Total
Grand Total 10,065.00

Prepared by:

ROSARIO A. GALORPORT EdD ZED KENNETH MOLINA EDUARDO GAMAYON


HT/Principal Industrial Arts Teacher PTA President
Republic of the Philippines
Department of Education
Region VII, Central Visayas
Division of Bohol
DISTRICT OF VALENCIA
Valencia

BILL OF MATERIALS AND COST ESTIMATES

Project : REPAIR OF SCHOOL GATE


School : OMJON ELEMENTARY SCHOOL
Location : Omjon, Valencia, Bohol
Component : REPAIR OF SCHOOL GATE
Project Cost : 21,470.00
I. Materials Cost

Item Unit Total


Qty. Unit Particular DepEd MLGU BC/PTA NGO
No. cost Cost
1 2 PCS SQUARE TUBE 1 X 1.5 900.00 1800.00 1800.00

2 3 PCS FLAT BAR 1/8 X 1 255.00 765.00 765.00

3 6 PCS ROUND TUBE #2 S-40 2065.00 12390.00 12390.00

4 2 PCS STEEL PLATE 2500.00 5000.00 5000.00

5 1 GAL METAL PRIMER 540.00 540.00 540.00

6 3 BOT THINNER 75.00 225.00 225.00

7 1 PCS ROUND TUBE ½ 750.00 750.00 750.00


8
9
10
11

Sub-Total 21,470.00
Eng'g Supervision -
contingencies/Labor -
Sub-Total
GRAND TOTAL 21,470.00
Prepared by:

ZED KENNETH A. MOLINA TIRSO EGAM


I.A Teacher PTA President

ROSARIO A. GALORPORT EdD


HT-I