PROGRAM OF WORK Name of Office: SGOD-EFS

PROGRAM OF WORKS
PROJECT TITLE: ______________________________
SCOPE OF WORKS: _____________________
SCHOOL : ________________________________________
LOCATION : _________________________
SOURCE OF FUND:____________________________
DATE :______________________

I.D.
DESCRIPTION UNIT QTY UNIT COST
NO

I TOTAL MATERIALS COST


II TOTAL LABOR COST
III EQUIPMENT COST
IV TOTAL PROJECT COST

Prepared by: Verified from SOB & APP

Property Costudian/ Physical Facilities Coordinator Senior Bookkeep

Checked & Reviewed

QM-Page 1 of 1
Division Engineer-III

Noted Approved:

Distict Supervisor School Principa

Concurred By:

Schools Division Superi

QM-Page 1 of 1
Document Code: SDO-SGOD-QF-SCHOOL FACILITIES-SPF-025

Name of Office: SGOD-EFS

RAM OF WORKS

GRAND TOTAL

Senior Bookkeeper

QM-Page 1 of 1
School Principal

Schools Division Superintendent

QM-Page 1 of 1
Republic of the Philippines Document Code: SDO-SGOD-QF-SCHOOL FACIL
Department of Eduction Revision: 00
Region III-Central Luzon
SCHOOLS DIVISION OF NUEVA ECIJA
Brgy. Rizal, Santa Rosa, Nueva Ecija Effectivity date: 07- -2019
PROGRAM OF WORK Name of Office: SGOD-EFS

PROGRAM OF WORKS
PROJECT TITLE: REPAIR OF COMFORT ROOMS KINDER,GRADE 1 AND 2
SCOPE OF WORKS: (7 DAYS) Finished the drainage sytem of comfort rooms of kinder to grade 2, Replace the dilapilated door of Kinder's Comfort Room
SCHOOL : MAGSALISI EAST ELEMENTARY
LOCATION : SITIO POULTRY,MAGSALISI,JAEN, NUEVA ECIJA
SOURCE OF FUND: MOOE
DATE : JULY 25, 2019

I.D.
DESCRIPTION UNIT QTY UNIT COST
NO

1 CBH#4 PC 100 9.00


2 Advance Cement Bag 6 240.00
3 PVC Orange Pipe Pc 4 530.00
4 Elbow #4 PC 4 105.00
5 2x3x12 Good Lumber pc 2 270.00
6 CWN # 10 kg 0.5 80.00
7 CWN # 1 kg 0.5 80.00
8 CWN #2 kg 0.5 80.00
9 CWN #3 kg 0.5 80.00
10 Bisagra 3x7 pc 3 40.00
11 2x2x8 Good pc 1 480.00
I TOTAL MATERIALS COST
II TOTAL LABOR COST
III EQUIPMENT COST
IV TOTAL PROJECT COST

Prepared by: Verified from SOB & APP:

RON ABNIR A. DE BELEN MILLIE ROSE GAS


Property Costudian/ Physical Facilities Coordinator Administrative Assista

Checked & Reviewed: Approved:

ENGR. ENER C. FUERTEZ


Division Engineer-III ETHEL CZARINE P. D
Teacher III/TIC

QM-Page 1 of 1
Noted:

NOEMI C. SAGCAL
District Supervisor

QM-Page 1 of 1
Document Code: SDO-SGOD-QF-SCHOOL FACILITIES-SPF-025

Name of Office: SGOD-EFS

RAM OF WORKS
ADE 1 AND 2
oms of kinder to grade 2, Replace the dilapilated door of Kinder's Comfort Room

GRAND TOTAL

900.00
1,440.00
2,120.00
420.00
540.00
40.00
40.00
40.00
40.00
120.00
480.00
6,180.00
2,163.00

8,343.00

MILLIE ROSE GASPAR


Administrative Assistant

ETHEL CZARINE P. DIZON


Teacher III/TIC

QM-Page 1 of 1
QM-Page 1 of 1
Republic of the Philippines Document Code: SDO-SGOD-QF-SCHOOL FACIL
Department of Eduction Revision: 00
Region III-Central Luzon
SCHOOLS DIVISION OF NUEVA ECIJA
Brgy. Rizal, Santa Rosa, Nueva Ecija Effectivity date: 07- -2019
PROGRAM OF WORK Name of Office: SGOD-EFS

PROGRAM OF WORKS
PROJECT TITLE: REPAINTING OF CLASSROOMS' ROOF KINDER-GRADE 6
SCOPE OF WORKS: (10 DAYS) REPAINTED CLASSROOM ROOF
SCHOOL : MAGSALISI EAST ELEMENTARY
LOCATION : SITIO POULTRY,MAGSALISI,JAEN, NUEVA ECIJA
SOURCE OF FUND: MOOE
DATE : JULY 25, 2019

I.D.
DESCRIPTION UNIT QTY UNIT COST
NO

1 PAINT BAGUIO GREEN TIN 3 2,580.00


2 PAINT WHITE LITERS 4 160.00
3 ROLLER PC 1 80.00
4 PAINT BRUSH #3 PC 3 50.00

I TOTAL MATERIALS COST


II TOTAL LABOR COST
III EQUIPMENT COST
IV TOTAL PROJECT COST

Prepared by: Verified from SOB & APP:

RON ABNIR A. DE BELEN MILLIE ROSE GAS


Property Costudian/ Physical Facilities Coordinator Administrative Assista

Checked & Reviewed: Approved:

ENGR. ENER C. FUERTEZ


Division Engineer-III ETHEL CZARINE P. D
Teacher III/TIC

QM-Page 1 of 1
Noted:

NOEMI C. SAGCAL
District Supervisor

QM-Page 1 of 1
Document Code: SDO-SGOD-QF-SCHOOL FACILITIES-SPF-025

Name of Office: SGOD-EFS

RAM OF WORKS
DER-GRADE 6

GRAND TOTAL

7,740.00
640.00
80.00
150.00

8,610.00
3,013.50

11,623.50

MILLIE ROSE GASPAR