PROJECT PROPOSAL

I. PROJECT DESCRIPTION

 Project Title : RENOVATION OF PROPOSED


DRRM CENTER / OFFICE
 Project Proponent/s : Zaldy A. Tabugoca, MM
Secondary School Principal l
 Project Beneficiary : San Fernando NHS (Students & Personnel)
 Location of Beneficiaries : Brgy. San Fernando, Basey, Samar
 Date of Implementation/Duration : March 27, 2017 / 3 Days
 Budget Requirement : Php10,070.00

II. RATIONALE

Disasters, natural or human-induced hit our place every now and then. This usually
results in tremendous destruction both to life and property. The occurrence of disasters has
become a major factor affecting our economic development and social stability.

The San Fernando National High School is a newly established school in Samar Division
specifically in Barangay San Fernando, Basey, Samar. The school is situated in a very low-
lying area that is 1.75 meters below the national highway and about 400 meters away from the
shoreline. The school is a flood-prone area.

The school is prone to various hazards such as flooding, typhoon, storm surge, health
threat (Schistosomiasis), road traffic accident (RTA), earthquake and fire. If no preparation will
be made, in the event that such eventualities occur, then, lives and properties are at stake.

With the foregoing, there is really a need to have a School Disaster Risk Reduction &
Management Center/Office which will be responsible for the dissemination of information and
giving of updates on various hazards that are prone to happen in the school. Moreover,
SDRRMC/O will serve as repository of all medical kits, supplies and equipment which can be
accessed easily in order to give immediate response to emergencies.

A room that measures 2.5m by 4.1m and situated in the Gabaldon Building of San
Fernando National High School is being proposed to be renovated for the School Disaster Risk
Reduction & Management Center/Office.
IlI. OBJECTIVES

Specifically, this project aims to:

1. Provide a center / office for the School Disaster Risk Reduction & Management;
2. Serve as repository of all medical kits, supplies, materials and equipment;
3. Serve as mini-library on Disaster Risk Reduction and Climate Change.

V. BUDGETARY REQUIREMENTS

Quantity Unit Description of Articles Unit Price Amount


2 pcs 2” x 2” x 12’ Good Lumber 120.00 240.00
2 pcs 1” x 2” x 12’ Good Lumber 60.00 120.00
6 pcs Marine Plywood 500.00 3,000.00
2 pcs Plyboard 1,300.00 2,600.00
2 gal Enamel Paint 680.00 1,360.00
1 kg Ordinary Nail – 4” 70.00 70.00
½ kg Ordinary Nail – 2” 70.00 35.00
½ kg Ordinary Nail – 1” 70.00 35.00
2 pcs Paint Brush 45.00 90.00
1 pc Roller Brush 70.00 70.00
Labor (3 days)
Carpenter@500/day 2,250.00
Helper@250/day
Fare & Handling 200.00
Grand Total 10,070.00

VI. ATTACHMENT

 Pictorials of the Proposed DRRM Center / Office

Prepared by:

ZALDY A. TABUGOCA, MM
Secondary School Principal l