10 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-010 MICROTUNNELLING BORING PROCEDURE FOR MONSOON DRAIN AT KP -0+250 ASH R1/FINAL
11 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-011 MICROTUNNELLING PROCEDURE FOR MPK ROAD CROSSING KP -0 + 850 ASH R1/FINAL
12 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-012 TNB TRANSMISSION LINE CROSSING BY OPEN CUT METHOD NFM R1/FINAL
13 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-013 LPT HIGHWAY INTERCHANGE CROSSING PROCEDURE BY OPEN CUT METHOD ASH R0/FINAL
14 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-014 PROCEDURE FOR HOLIDAY TEST AND REPAIR COATING MRO R1/FINAL
16 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-016 MICROTUNNELLING PROCEDURE FOR JALAN BUKIT ANAK DARA CROSSING KP 30 + 505 R0/FINAL
17 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-017 MICROTUNNELLING PROCEDURE FOR JALAN BUKIT ANAK TERUNA DALAM CROSSING KP ASH R1/FINAL
23 + 945
22 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-022 MICROTUNNELLING PROCEDURE FOR ANAK SUNGAI KERTIH CROSSING KP 12 + 357 NFM R1/FINAL
23 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-023 MICROTUNNELLING PROCEDURE FOR ANAK SUNGAI KEMASIK CROSSING KP 19 + 115 NFM R1/FINAL
26 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-026 MICROTUNNELLING PROCEDURE FOR JALAN IBOK CROSSING KP 19 + 407 NFM R1/FINAL
27 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-027 MICROTUNNELLING PROCEDURE FOR JALAN RANGGON CROSSING KP 4 + 050 ASH R0/FINAL
28 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-028 ROAD CROSSING (OVEMBSEAD BRIDGE) PROCEDURE BY OPEN CUT METHOD NFM R0/FINAL
30 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-030 MICROTUNNELLING PROCEDURE FOR EXISTING RAILWAY CROSSING KP 0+120 NFM R0/FINAL
HORIZONTAL DIRECTIONAL DRILLING (HDD) PROCEDURE FOR SUNGAI KERTEH AND ECRL
31 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-031 NFM R1/FINAL
CROSSING
32 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-032 LIFTING PLAN AND CALCULATION FOR TLB AND TIE-IN FOR NON-CRITICAL AREA MIK R0/FINAL
33 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-033 PIPELINE SECTIONAL PRE-CLEANING VIA PIGGING SPECIFIC PROCEDURE FOR KP 24+000 MHS/FMH R0/FINAL
TO KP 31+620
PIPELINE HYDROTESTING, DEWATERING AND DRYING SPECIFIC PROCEDURES FOR
34 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-034 MHS/FMH R0/FINAL
KP12+782 TO KP12+920 (MLL103 STATION)
35 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-035 PIPELINE HYDROTEST PROCEDURE FROM KP31+650 (M1 STATION) TO KP12+950 MHS/FMH R0/FINAL
36 GRAPHITE-CON-MMSJV-KTHRO-PLF-PRC-036 PIPELINE HYDROTEST PROCEDURE FROM KP0+000 (B2 STATION) TO KP12+800 MHS/FMH R0/FINAL
38 GRAPHITE-CON-MMSJV-KTHRO-PLF-WPS-001 LIST & PROPOSED WELDING PROCEDURE SPECIFICATION (PWPS) – PIPELINE SAFI R0/FINAL
41 GRAPHITE-CON-MMSJV-KTHRO-PLF-WPS-004 WELDING PROCEDURE SPECIFICATION PIPELINE (WPS-PGU1-12-01 & WPS-PGU1-12-01- SAFI/SMC R0/FINAL
R)
WELDING PROCEDURE SPECIFICATION PIPELINE (WPS-PGU1-16-01 & WPS-PGU1-16-01-
42 GRAPHITE-CON-MMSJV-KTHRO-PLF-WPS-005 SAFI/SMC R0/FINAL
R)
WELDING PROCEDURE SPECIFICATION PIPELINE (WPS-PGU1-0.5-01 & WPS-PGU1-0.5-
43 GRAPHITE-CON-MMSJV-KTHRO-PLF-WPS-006 SAFI/SMC R0/FINAL
01-R)
44 GRAPHITE-CON-MMSJV-KTHRO-PLF-WPS-007 WELDING PROCEDURE SPECIFICATION PIPELINE (WPS-PGU1-2-01 & WPS-PGU1-2-01-R) SAFI/SMC R0/FINAL
45 GRAPHITE-CON-MMSJV-KTHRO-PLF-WPS-008 WELDING PROCEDURE SPECIFICATION PIPELINE (WPS-PGU1-4-01 & WPS-PGU1-4-01-R) SAFI/SMC R0/FINAL
46 GRAPHITE-CON-MMSJV-KTHRO-PLF-WPS-009 WELDING PROCEDURE SPECIFICATION PIPELINE (WPS-PGU1-8-01 & WPS-PGU1-8-01-R) SAFI/SMC R0/FINAL
13 GRAPHITE-CON-MMSJV-KTHRO-PIP-PRC-009 PROCEDURE FOR NDT (ULTRASONIC TESTING THICKNESS GAUGING) - STATION YGK R0/FINAL
20 GRAPHITE-CON-MMSJV-KTHRO-PIP-PRC-016 PROCEDURE FOR COMMISSIONING AND RECOMMISSIONING WORKS FOR MC 1 FMH/YGK R0/FINAL
30 GRAPHITE-CON-MMSJV-KTHRO-PIP-WPS-001 LIST & PROPOSED WELDING PROCEDURE SPECIFICATION (PWPS) – PIPING MR0/SAFI R1/FINAL
31 GRAPHITE-CON-MMSJV-KTHRO-PIP-WPS-002 LIST & WELDING PROCEDURE SPECIFICATION (WPS) – NPS 18 INCH SMC R0/FINAL
2.1.2 CIVIL AND STRUCTURE
1 GRAPHITE-CON-MMSJV-KTHRO-CVS-PRC-001 PROCEDURE FOR HIT INJECTION SYSTEM FOR REBAR YGK R0/FINAL
2 GRAPHITE-CON-MMSJV-KTHRO-CVS-PRC-002 PRE-CONSTRUCTION AND CONSTRUCTION SURVEY PROCEDURE AWI/YGK R1/FINAL
3 GRAPHITE-CON-MMSJV-KTHRO-CVS-PRC-003 PROCEDURE FOR SITE PREPARATION AND EARTHWORK YGK R2/FINAL
4 GRAPHITE-CON-MMSJV-KTHRO-CVS-PRC-004 PROCEDURE FOR PILING WORKS YGK R1/FINAL
5 GRAPHITE-CON-MMSJV-KTHRO-CVS-PRC-005 PROCEDURE FOR CONCRETING AND GROUTING WORKS YGK R1/FINAL
6 GRAPHITE-CON-MMSJV-KTHRO-CVS-PRC-006 PROCEDURE FOR BUILDING ARCHITECTURE WORKS YGK R1/FINAL
7 GRAPHITE-CON-MMSJV-KTHRO-CVS-PRC-007 PROCEDURE FOR STEEL STRUCTURE FABRICATION AND ERECTION WORKS YGK R3/FINAL
14 GRAPHITE-CON-MMSJV-KTHRO-CVS-PRC-014 NDT MAGNETIC PARTICAL INSPECTION (MPI) FOR STRUCTURE WORKS SAFI R0/FINAL
4 GRAPHITE-CON-MMSJV-KTHRO-CP-PRC-004 PROCEDURE FOR RELOCATION WORKS OF EXISTING ICCP SYSTEM AT B2 STATION EESB R1/FINAL
5 GRAPHITE-CON-MMSJV-KTHRO-CP-PRC-005 PROCEDURE FOR INSTALLATION OF AC MITIGATION SYSTEM EESB RB/CODE 2 RESUBMITTED ON 5/9/22 (TRM-1774) - PENDING PGB
2.1.5 INSTRUMENTATION
1 GRAPHITE-CON-MMSJV-KTHRO-INC-PRC-001 FACTORY ACCEPTANCE TEST (FAT) PROCEDURE FOR PLC UCSB/YGK R0/FINAL
2 GRAPHITE-CON-MMSJV-KTHRO-INC-PRC-002 SITE ACCEPTANCE TEST (SAT) PROCEDURE FOR PLC (B2 STATION) UCSB/YGK R0/FINAL
3 GRAPHITE-CON-MMSJV-KTHRO-INC-PRC-003 SCADA CIST PROCEDURE YGK R0/FINAL
4 GRAPHITE-CON-MMSJV-KTHRO-INC-PRC-004 SITE ACCEPTANCE TEST (SAT) PROCEDURE FOR PLC (MLL 103 STATION) UCSB/YGK R0/FINAL
5 GRAPHITE-CON-MMSJV-KTHRO-INC-PRC-005 SITE ACCEPTANCE TEST (SAT) PROCEDURE FOR PLC (M1 STATION) UCSB/YGK R0/FINAL
6 GRAPHITE-CON-MMSJV-KTHRO-INC-PRC-006 SITE ACCEPTANCE TEST - GAS OVER HYDRAULIC ACTUATOR (GPO) MNF/YGK R0/FINAL
7 GRAPHITE-CON-MMSJV-KTHRO-INC-PRC-007 SITE ACCEPTANCE TEST (SAT) PROCEDURE FOR PRESSURE SAFETY VALVE YGK R0/FINAL
2.1.6 ELCTRICAL
1 GRAPHITE-CON-MMSJV-KTHRO-ELE-PRC-001 FACTORY ACCEPTANCE TEST (FAT) PROCEDURE FOR DC UPS YGK R0/FINAL
2 GRAPHITE-CON-MMSJV-KTHRO-ELE-PRC-002 SITE ACCEPTANCE TEST (SAT) PROCEDURE FOR DC UPS AND VRLA BATTERIES YGK R0/FINAL