CLEAN FUEL PROJECT
PREVENTIVE MAINTENANCE INSPECTION CHECK LIST FOR DISTRIBUTION BOARD
DB SERIAL NO: ____________________ MAIN BREAKER: _______ AMPS, 1P, 250V
FOR THE MONTH OF______________ 2015 MONTHLY: _______________________
LOCATION: _______________ CONTRACT NO: CFP/EPC/0054-MAB1
SN DESCRIPTION MONTHLY DB STATUS REMARKS
GOOD
Physical check of the distribution board conditions,
1
door, gasket, etc. BAD
NORMAL
2 Check the temperature of DB components ABNORMAL
GOOD
3 Check wires connection for tightness BAD
GOOD
Check Switching mechanism of each incoming and
4
outgoing MCB BAD
LOAD BALANCING
REQUIRED
Check Ampere reading @ peak LOAD BALANCING NOT-
5 REQUIRED
load R = AMPS, Y = AMPS, B =
AMPS, N = AMPS
VOLTAGE ACCEPTABLE
VOLTAGE NOT ACCEPTABE
RN = VOLTS
YN = VOLTS
BN = VOLTS
6 Check Voltage reading @ peak load RY = VOLTS
YB = VOLTS
RB = VOLTS
GOOD
Check ELCB operation by pressing the test push BAD
7
button
INSPECTOR NAME: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ SIGNATURE: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
DESIGNATION: ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐