The document is a tender submission for the construction of a community sports pavilion that includes:
1) A schedule of prices with line items for various project elements and their estimated costs.
2) Options for cost savings or additions with their estimated impacts.
3) A section for provisional cost sums.
4) A request to provide hourly labor charge out rates for various roles.
The document is a tender submission for the construction of a community sports pavilion that includes:
1) A schedule of prices with line items for various project elements and their estimated costs.
2) Options for cost savings or additions with their estimated impacts.
3) A section for provisional cost sums.
4) A request to provide hourly labor charge out rates for various roles.
The document is a tender submission for the construction of a community sports pavilion that includes:
1) A schedule of prices with line items for various project elements and their estimated costs.
2) Options for cost savings or additions with their estimated impacts.
3) A section for provisional cost sums.
4) A request to provide hourly labor charge out rates for various roles.
CT6953 Construction of Powelltown Community Sports Pavilion
Schedule 2 - Schedule of Prices
Part A - Tender Cost Breakdown
1. Please complete all cells highlighted yellow.
2. Please add rows as required.
Item ELEMENTAL SUMMARY - Description Total Price
(ex. GST) 1 Preliminaries $0.00 2 Demolition $0.00 3 Earthworks $0.00 4 Piling $0.00 5 Concrete slabs $0.00 6 Waterproofing / Tanking $0.00 7 Masonry $0.00 8 Structural Steel $0.00 9 Roofing and Roof Plumbing $0.00 10 External Wall Cladding $0.00 11 Windows, Louvres and Screens $0.00 12 Internal Windows and Screens $0.00 13 Carpentry $0.00 14 Doors and Door Frames $0.00 15 Partitioning System $0.00 16 Hardware $0.00 17 Roller shutters $0.00 18 Signage (Statutory) $0.00 19 Metalwork $0.00 20 Internal Timber Lining System $0.00 21 Plastering and Suspended Ceilings $0.00 22 Toilet and shower partitions $0.00 23 Carpet floor finishes $0.00 24 Vinyl floor finishes $0.00 25 Epoxy floor finishes $0.00 26 Tiling $0.00 27 Painting $0.00 28 Safe roof access provision $0.00 29 Sanitary fixtures $0.00 30 External Works including retaining walls $0.00 31 Soft landscaping $0.00 32 Hard Landscaping excluding paving $0.00 33 Paving $0.00 34 Electrical Services $0.00 35 Photovoltaic System $0.00 36 Battery $0.00 37 Hydraulics $0.00 38 Gas Tank System $0.00 39 Mechanical services $0.00 40 Stormwater $0.00 41 Rainwater Tanks $0.00 42 Fire Protection Services including Tank $0.00 43 Security $0.00 44 Communications & Audiovisual services $0.00 TOTAL LUMP SUM PRICE (EX. GST, TENDER OPTIONS & PC SUM OPTIONS) $0.00
Item TENDER OPTIONS - Description Total Price
(ex. GST) 1 Cost option to supply and install Operable Wall in lieue of D35 Roller Door $0.00 2 Cost saving to omit bike wash system and associated plumbing $0.00 3 Cost saving to omit exposed ag concrete and replace with 4% blackoxide coloured conc. $0.00 4 Cost saving to omit A/C to kitchen and first aid rooms $0.00 5 Cost saving to omit internal timber lining and replace with paint to plasterboard $0.00 6 Cost saving to use alternative aluminium framing in lieue of specified $0.00 7 Cost saving to use alternative lighting in lieue of specified $0.00 8 Cost saving to use alternative roller door supplier in lieue of specified $0.00 9 Cost saving to use alternative wet area partitioning in lieue of specified $0.00 10 Cost saving to omit soft landscaping $0.00 11 Cost option for concreting in front of the terrace step up to the fence and include a swale $0.00 drain and spare conduit for future lighting 12 Cost saving for the kitchen to be semi-commercial (ie. Laminate cupboard joinery below $0.00 countertop, in-lieu of full TOTAL stainless steel)SUM PRICE (EX. GST & INC. TENDER OPTIONS) LUMP $0.00
Item PC SUM OPTIONS - Description Total Price
(ex. GST) 1 Misc Landscaping items $10,000.00 2 NBN $20,000.00 3 Dayworks $25,000.00 4 Relocation of Existing Temporary Change unit to Seville Recreational Reserve, including $60,000.00 dismantling, relocation, re-establishment and commissioning. Cost to include necessary Building Permits/Occupancy permits and all associated reports and approvals from relevant authorities 5 Provision for Supply & Installation of Bike Wash, Bike Maintenance & eBike Stations $20,000.00 TOTAL PC SUM PRICE (EX. GST ) $135,000.00
INNOVATION AND ALTERNATIVE OPTIONS
Item Innovative and Alternative Options (I & A O) Cost Savings
to the Principal (ex. GST) ($) 1 $0.00 2 $0.00 3 $0.00 4 $0.00 5 $0.00 6 $0.00 TOTAL I & A O COST SAVINGS (EX. GST) $0.00 CT6953 Construction of Powelltown Community Sports Pavilion Part B - Labour Charge Out Rates
1. Please complete all cells highlighted yellow.
2. Please add rows as required.
Item Labour Charge Out Rates Total Price
(ex. GST) Per Hour 1 Project Director/Manager $ - 2 Site Manager $ - 3 Contract manager $ - 4 Contract administrator $ - 5 General Foreman $ - 6 Leading Hand $ - 7 Skilled labourer $ - 8 Carpenter $ - 9 Brick/Block Layer $ - 10 Plumber $ - 11 Roof Plumber $ - 12 Electrician $ - 13 Plasterer $ - 14 Painter $ - CT6953 Construction of Powelltown Community Sports Pavilion Part C - Rock and Hazardous Materials Rates
1. Please complete all cells highlighted yellow.
2. Please add rows as required.
Item Rock Extra Over Rates Unit Total Price
(ex. GST) 1 Rock in bulk excavation - non rippable $/m3 $0.00 2 Rock in bulk excavation - rippable $/m3 $0.00 3 Rock in trench excavation - non rippable $/m3 $0.00 4 Rock in trench excavation - rippable $/m3 $0.00 Soft Ground 5 Excavation in soft ground as directed by the Engineer $/m3 $0.00 and backfilling with approved material Filling 6 Crushed rock filling $/m3 $0.00 7 Lean mix concrete filling $/m3 $0.00 8 Cement stabilised sand filling $/m3 $0.00 Contaminated Soil Disposal (Extra-Over Rates) 9 Category A contaminated soil disposal $/tonne $0.00 10 Category B contaminated soil disposal $/tonne $0.00 11 Category C contaminated soil disposal $/tonne $0.00 12 Cartage for EPA licensed tip trucks (per hour) - tandem $/hr $0.00 Hazardous Materials 13 Removal of non-friable asbestos (Labour only per day) $/day $0.00 14 Removal of friable asbestos (Labour only per day) $/day $0.00 15 Daily rate for on-site hygienist $/day $0.00