DI. NO. 5, JALAN MERAH JAMBU U9/8, KAYANGAN HEIGHTS, SEKSYEN U9, 40150 SHAH ALAM,
SELANGOR DARUL EHSAN. UNTUK PN ZALEENA BINTI ABDUL GHANI
SUMMARY OF TENDER
A PRELIMINARIES 0.00
Name : Name :
In The Capacity of
Date : Date :
SOT/1 (Add.01)
BILL NO. 1 - PRELIMINARIES
1.00 GENERALLY
The Preliminary Items as set out hereunder are deemed to apply to the
whole of the Works as shown on the Drawings and/or described in the
Schedule of Works and the Contractor shall allow for complying with
the same and for any cost in connection therewith. The Contractor shall
note that any clause or item listed in this section which has NOT been
priced, it shall be deemed that the cost of such clause ori items have
been included elsewhere in this Section or in the Schedule of Works
sectionand those unpriced Clause or items shall be considered as free
of charge and no claims will be entertained.
1 Preliminaries
2 Building Works (All Provisional)
3 External Works Within Lot Boundary (All Provisional)
4 Provisional Sums
To Collection
BQ1 - 1
BILL NO. 1 - PRELIMINARIES
The Contractor will thereafter accept the site AS FOUND on the Date
of Possesion of the site, and at his own expense prepare the Site. This
is a general item only. For more detailed information, the Contractor
shall refer and examined the drawings accompanying the document
and shall attend mandatory Site visit/ inspection to ascertain the Scope
of Works to be undertaken.
To Collection
BQ1 - 2
BILL NO. 1 - PRELIMINARIES
To Collection
BQ1 - 3
BILL NO. 1 - PRELIMINARIES
The Form of Contract into which the Contractor will be required to enter
in connection with this project is the " Standard Form of Contract
Where Bills Of Quantities Part Of The Contract PAM 2006 (With
Quantites) PRIVATE EDITION"
8.01 Generally
To Collection
BQ1 - 4
BILL NO. 1 - PRELIMINARIES
The Contractor shall in joint names of the Employer and the Contractor
insure against loss and damage as in Clause 20 of the form of Contract
for the full value thereof of work executed and all unfixed materials and
goods upon the Site but excluding plant tools and equipment, and shall
keep such work, materials and goods as insured until the Works are
completed and handed over.
To Collection
BQ1 - 5
BILL NO. 1 - PRELIMINARIES
The Contractor shall upon settlement of any claims under the policies
aforesaid proceed with due diligence to build or repair the materials or
goods destroyed or damaged. All monies received under such policies
are to be paid to the Contractor by installments under Certificates of
the S.O. and the Contractor shall not be entitled to any payment in
respect of the materials or goods destroyed or damaged other the
monies received under the said policies.
8.05 Discrepancies
To Collection
BQ1 - 6
BILL NO. 1 - PRELIMINARIES
The S.O. shall inspect and approve setting out of elements of work
before installation takes place. Similarly the S.O. shall inspect the
support and internal framing of the elements of the work before
The Contractor must take steps and precaution by providing all means
of protection to prevent damage to all existing completed works such
as ceramic tiles, suspended ceiling, wall finishes etc. including existing
M&E services and fittings. He will be responsible for any damages
done in consequences of this operation and shall make good at his
8.10 Overtime
If, in the opinion of the S.O., the progress of the works is behind
schedule, the S.O. shall have the right to instruct the Contractor to
increase his plant and labour force and/or to continue work beyond
normal working hours in order to maintain the progress of the work to
To Collection
BQ1 - 7
BILL NO. 1 - PRELIMINARIES
8.12 Drawing
The whole of the Works shall proceed at such times as may be ordered
by the S.O. and has Stipulated under item 8.09.
8.14 Attendance
Each trade shall be attended upon, cart away for and made good after
and all work in the nature of jobbing work required in connection
therewith shall be performed by the Contractor at no extra costs.
Possession of the Site or the relevant part of the Site will be handed
over to the Contractor immediately after the Tender is accepted in
The Work must be carried out with all due diligence and expedition and
the whole of the works including all extra and additional works ordered
by the S.O. must be completed by the date mentioned in the contract
subject to any approved extension of time.
To Collection
BQ1 - 8
BILL NO. 1 - PRELIMINARIES
The Contractor will at all times considers the other persons living
and/or working on the Site and avoid unnecessary noice and
disturbance. During day time seven (7) days a week, the business
hours are operating as usual and the Contractor shall ensure that their
work does not interrupt the Employers and other tenants business
8.16 Water
The Contractor shall arrange water supply required for the use in the
Works, including any required by Nominated Sub- Contractors by
tapping from designated point approved by the Building Owner and the
pay all charges incurred. Allow for all temporary plumbing and storage,
shifting and adaptig where so required by the S.O. All water to be used
for the Works shall be fresh, clean and pure.
The Contractor shall provide all tools, machinaries and plant necessary
for proper completion of the Contract.
To Collection
BQ1 - 9
BILL NO. 1 - PRELIMINARIES
8.21 Foremen
The Contractor will employ a watchman on the Works and shall be held
responsible for any damage to the works or loss of materials.
The Contractor shall be required to submit the full list and particulars of
workers as per Appendix III to facilitate security checks of workers by
S.O/ Employer and relevant authorities.
8.23 Payments
The Contractor shall attennd all Site Meetings as and when required.
Only persons with authority to make decisions and accept responsibility
shall attend such meeting.
The Contractor shall remove all rubbish and superfluous materials from
the Site of the Works with all reasonable speed from time to time AND
as instructed by the S.O. at completion and finally leave the Site clean,
clear and unencumbered.
To Collection
BQ1 - 10
BILL NO. 1 - PRELIMINARIES
The Contractor may use existing lighting and electric power source tap
from designated point approved by Employer for use on the works
including any required for use by Nominated Sub-Contractors and
provide all temporary connection, fitting etc. and clear away apparatus
and make good on completion of works on site.
Protect, uphold and maintain staircases or other working access and all
existing and in use pipes, ducts, sewers, services main, overhead
cables, etc. during the execution of the Works, unless otherwise
To Collection
BQ1 - 11
BILL NO. 1 - PRELIMINARIES
The Contractor shall make good any damage caused at his own
expenses or any pay any costs / charges in connection therewith.
The Contractor shall verify and obtain and necessary approval prior to
the removal of any disused services encountered and to allow for
blocking off ends, etc. as appropriate where directed.
The Contractor shall carry out the works in such manner as to cause as
little inconvenience and nuisance to the tenants and public.
All noice producing work shall only be allowed after operation hours,
along with air polluting exercises.
To Collection
BQ1 - 12
BILL NO. 1 - PRELIMINARIES
The Contractor shall not execute any works, which contain such
discrepancies, unless so directed by the S.O. The Contractor will bear
the extra expenses incurred on any works should he undertake these
works prior to notification and/or directions.
The drawings used in the preparation of these tender forms parts of the
Contract and are listed in the List Of Drawings in the tender
documentation.
To Collection
BQ1 - 13
BILL NO. 1 - PRELIMINARIES
Provide and maintain first aid kits at suitable location on the Site to
ensure that the facility is readily available without delay if accidents
happen. The Contractor shall also provide suitable and sufficient safety
apparels such as dust mask, ear plug, safety boots and helmets etc.
Allow for sweeping floors from time to time and clearing and carting
away all ruubish as it accumulated during the progress of the Works,
and this shall be on daily basis including any cause by Sub-Contractors
and other specialists employed on the the site, and on completion clear
and cart away all superfluous materials, scaffolding and plant. The
Contractor shall also carry out daily cleaning and maintenance to area
surrounding and leading to entrance of the site.
To Collection
BQ1 - 14
BILL NO. 1 - PRELIMINARIES
Allow for thoroughly cleansing all floors, walls, glass, railing and M&E
fittings, eradicating stains and splashes, adjusting and oiling all
ironmongeries and leaving the premises clean and fit for occupation at
completion and for leaving the Works and site adjacent therero clean
and tidy, all to entire satisfaction of the S.O.
Final Completion and the act of making final payment of the balance of
the contract price shall in no way be interpreted as complete
exoneration of the Contractor from any defects that may arise due to
causes attributable to negligence of the Contractor or to inferior
materials or poor workmanship provided by him.
The Contractor shall prepare and submit to the S.O. weekly reports on
the progress of the works by sections or by Trades, the number of
workmen employed, materials delivered, the extent and the type of
plant employed, weather conditions and generally yhe progresss
To Collection
BQ1 - 15
BILL NO. 1 - PRELIMINARIES
vi) Giving all necessary dimensions and taking responsibility for their
accuracy;
To Collection
BQ1 - 16
BILL NO. 1 - PRELIMINARIES
xiv) Taking full responsibility for, and covering and protecting against all
loss or damage to all executed and partly executed sub- contract
work and all material and goods properly brought on site for
inclusion in the sub-contract works whether or not included in any
certificate including keeping ratifying all necessary joint records
ii) Unloading, getting in, storing, handling and hoisting of plant and
tools belonging to the Sub-Contractor and bulkyand/or heavy
equipment which forms part of the Sub-Contractor's installation.
(The Sub-Contractor may take the necessary arrangement to hire
agreed charges. The Sub-Contractor shall inform tthe Main
Contractor of the proposed route of movement of bulky and/or
heavy equipment to allow the Main Contractor to organise and
strengthen the existing structure;
To Collection
BQ1 - 17
BILL NO. 1 - PRELIMINARIES
vi) Provision of all fuel, gas, steam, water, electricity supplies, paying
for all current consumed and all other services that may be
required for the testing of installations;
vii) Taking full responsibility for any loss of, or damage to his own
plant, tools, equipment and other property on the site; and
viii) Keeping his work free from accumulation of debris at all times and
moving debris to collection points designated by the Main
To Collection
BQ1 - 18
BILL NO. 1 - PRELIMINARIES
To Collection
BQ1 - 19
BILL NO. 1 - PRELIMINARIES
The Contractor shall provide the S.O five (5) sets of as built drawings
for ID works and M&E works where requested by the S.O., and all as
built drawings must be endorsed by Licensed Surveyor.
The Contractor shall provide the S.O there (3) sets of shop drawings
for renovation works and M&E works where requested by the S.O., and
all shop drawings must be endorsed by relevant consultants.
The Contractor shall liase with the Local Authorities with regard to the
CCC requirements. In the event that the Contractor fails to arrange for
such inspection and testing on time, the S.O. reserves the right to
appoint other persons to arrange the inspection and testing. All cost
incurred shall be borne by the Contractor.
To Collection
BQ1 - 20
BILL NO. 1 - PRELIMINARIES
The Contractor shall within forteen (14) days after the receipt of the
letter of acceptance of tender to provide and update the Works
Programme using Master Programme to produce Critical Path Method
(CPM) and Works Breakdown Structure (WBS) etc., as specified by the
The Contractor shall propose for the S.O's approval a system for
quality control (quality and inspection plan) to be applied throughout the
works and shall include all contractor's proposal as per specification.
To Collection
BQ1 - 21
BILL NO. 1 - PRELIMINARIES
The Contractor shall solely bare all matters in regards to their stamp
duty as currently being imposed by the Government and shall comply
with the Government Act - Section 80(2), Stamp Act 1949 including any
legal cost and other fees in preparation and execution of the contract
and anything incidental thereto.
The Contractor shall be responsible for all matters with regards to their
registration with the CIDB including obtaining the necessary permit
and/or licenses. The Contractor shall comply to Part VIII of the CIDB
Malaysia Act 1994 and the Construction Industry (Levy Collection)
Regulations 1996, and shall submit a notification on Form CIDB L1/96
to the Letter of Acceptance/ Letter of Award. By virtue of the Act the
Contractor shall have priced in the Preliminaries the levy to be incurred
at the rate of 0.125% of the Contract Sum. Claims for extra by virtue
of this Act shall not be entertained.
To Collection
BQ1 - 22
BILL NO. 1 - PRELIMINARIES
COLLECTION
BQ1 - 1 … … ……..………………………………
BQ1 - 2 … … ……..………………………………
BQ1 - 3 … … ……..………………………………
BQ1 - 4 … … ……..………………………………
BQ1 - 5 … … ……..………………………………
BQ1 - 6 … … ……..………………………………
BQ1 - 7 … … ……..………………………………
BQ1 - 8 … … ……..………………………………
BQ1 - 9 … … ……..………………………………
BQ1 - 10 … … ……..………………………………
BQ1 - 11 … … ……..………………………………
BQ1 - 12 … … ……..………………………………
BQ1 - 13 … … ……..………………………………
BQ1 - 14 … … ……..………………………………
BQ1 - 15 … … ……..………………………………
BQ1 - 16 … … ……..………………………………
BQ1 - 17 … … ……..………………………………
BQ1 - 18 … … ……..………………………………
BQ1 - 19 … … ……..………………………………
BQ1 - 20 … … ……..………………………………
BQ1 - 21 … … ……..………………………………
BQ1 - 22 … … ……..………………………………
BQ1 - 23
BILL NO. 2 - BUILDING WORKS
B Excavate pit for pile cap not exceeding 2.00m deep m3 572
------------------------------------------------------
J Column Stump m3 10
K Ground beam m3 28
L Ground slab/apron m3 71
Pilecap
M Varies diameter Kg 7,975
Column Stump
N Varies diameter Kg 1,650
TO COLLECTION :
BQ 2 / 1
BILL NO. 2 - BUILDING WORKS
Ground Beam
A Varies diameter Kg 3,696
Ground slab
B Varies diameter Kg 3,919
------------------------------------------------------
TO COLLECTION :
BQ 2 / 2
BILL NO. 2 - BUILDING WORKS
FRAME
B In suspended beam m3 67
C In roof beam m3 13
In suspended beam
L Varies diameter Kg 9,581
In roof beam
M Varies diameter Kg 1,573
TO COLLECTION :
BQ 2 / 3
BILL NO. 2 - BUILDING WORKS
TO COLLECTION :
BQ 2 / 4
BILL NO. 2 - BUILDING WORKS
ROOF STRUCTURE
------------------------------------------------------
TO COLLECTION :
BQ 2 / 5
BILL NO. 2 - BUILDING WORKS
B Landing slab m3 7
C Landing beam m3 2
K On landing slab m2 33
TO COLLECTION :
BQ 2 / 6
BILL NO. 2 - BUILDING WORKS
G m 33
Supply, deliver and fix 1000mm high stainless steel railing
constructed of 50mm diameter stainless steel hollow
section handrail including all associated members, 10mm
thick clear tempered glass as described and all to
manufacturer's details; as approved by the S.O's/Architect.
H m 88
Supply, deliver and fix 1000mm high mild steel railing
constructed of 50mm diameter mild steel hollow section
handrail including all associated members, including
painting and welded as described and all to manufacturer's
details; as approved by the S.O's/Architect.
TO COLLECTION :
BQ 2 / 7
BILL NO. 2 - BUILDING WORKS
E 6mm Diameter mild steel bonding ties 450mm long with no. 1,850
one end cast into concrete and hooked around
reinforcement and other end built into joint of brickwork
including perforation on formwork
F To supply and lay ventilation block with cement and sand m2 100
mortar (1:6) with an approved plasticiser and reinforced
with and including to manufacturer's detaiil and instruction
all as approved by the S.O's/Architect.
TO COLLECTION :
BQ 2 / 8
BILL NO. 2 - BUILDING WORKS
FLOOR FINISHES
D 25mm thick approved polished cement render c/w inlay all m2 140
as per manufacturer's instruction and approved by the
S.O/Engineer's
------------------------------------------------------
TO COLLECTION :
BQ 2 / 9
BILL NO. 2 - BUILDING WORKS
WALL FINISHES
TO COLLECTION :
BQ 2 / 10
BILL NO. 2 - BUILDING WORKS
CEILING FINISHES
TO COLLECTION :
BQ 2 / 11
BILL NO. 2 - BUILDING WORKS
SANITARY APPLIANCES
A Supply LABOUR ONLY to install and fix all sanitary fittings Lump
appliances with all accessories and approved by the
Architect's./Client Sum
B
On completion of the installation of the Sanitary Appliances
and fittings, test the whole system as described, make
good any defects to other affected trades, and leave the
whole in good working order to the entire satisfaction of the
Architect/S.O and Local Authorities Item
C Item
D Item
E Item
F Item
G Item
H Item
J Item
TO COLLECTION :
BQ 2 / 12
BILL NO. 2 - BUILDING WORKS
COLLECTION
BQ 2 / 1 - - -
BQ 2 / 2 - - -
BQ 2 / 3 - - -
BQ 2 / 4 - - -
BQ 2 / 5 - - -
BQ 2 / 6 - - -
BQ 2 / 7 - - -
BQ 2 / 8 - - -
BQ 2 / 9 - - -
BQ 2 / 10 - - -
BQ 2 / 11 - - -
BQ 2 / 12 - - -
BQ 2 / 13
BILL NO. 3 - EXTERNAL WORKS WITHIN LOT BOUNDARY (ALL PROVISIONAL)
SUMMARY
1.00 BILL NO. 3(a) - SITE CLEARANCE AND EARTHWORKS (ALL PROVISIONAL) BQ 3(a) / 4 -
3.00 BILL NO. 3(c) - SEWER RETICULATION SYSTEM (ALL PROVISIONAL) BQ 3(c) / 2 -
4.00 BILL NO. 3(d) - REINFORCED CONCRETE RETAINING WALL (ALL PROVISIONAL) BQ 3(d) / 2 -
BQ 3 / SUMM
BILL NO. 3(a) - SITE CLEARANCE AND EARTHWORKS (ALL PROVISIONAL)
GENERAL NOTES
A The Contractor shall be held to have visited the site, inspected Item
the existing conditions and ascertained the extent and nature of
the works to be carried out. No claims for extra payment in this
respect will be entertained.
H The Contractor shall verify the dimensions and levels of the Item
existing ground as shown on the drawings before
commencement of works. Any discrepency which may affect
the works shall be notified to the S.O. Failing such verification
and agreements, the dimension and levels shown on drawings
or as otherwise determined by the S.O. shall be final and
binding on the Contractor.
I Before imported earth to make uplevels, if any, the S.O. shall Item
be informed so that checks can be enforced to determine the
amount of filling. The Contractor shall not be paid for any filling
brought in without approval.
TO COLLECTION :
BQ 3(a) / 1
BILL NO. 3(a) - SITE CLEARANCE AND EARTHWORKS (ALL PROVISIONAL)
Site Clearance
A Clear the site within the boundary requiting cutting down all m2 2,129
trees in all sizes and high within the effected area, shrubs,
undergrowth, crops and superflous vegetation, remove all fallen
tree trunks, tree, stumps, etc. grub up roots, stumps, removal of
natural artifical material,objects and obstruction which are
above and below the original ground surfaces. Strip off 200mm
average deep of vegetable top soil (suitable material may be
utilised for turfing whenever necessary). Clearing up, cleaning
all materials, debris rubbish or whatsoever arising from the site
said work operation and remove all to contractor's own
dumping site. (approximately 0.526 Acres)
Earthworks
B Bulk excavation and removal from site to the contractor's own m3 3,378
dumping ground all excavated materials commencing from
existing ground level irrespective of depth up to a level satisfied
by the Engineer/SO and directed by Local Authority including,
grading, levelling, compaction, formation of slopes, berm and
trimming.
D EXTRA OVER for excavation in rock and remove all debris m3 169
from site to Contractor's own spoil heaps or to a place directed
by S.O.
TO COLLECTION :
BQ 3(a) / 2
BILL NO. 3(a) - SITE CLEARANCE AND EARTHWORKS (ALL PROVISIONAL)
Temporary Hoarding
TO COLLECTION :
BQ 3(a) / 3
BILL NO. 3(a) - SITE CLEARANCE AND EARTHWORKS (ALL PROVISIONAL)
Toe Drain
TO COLLECTION :
COLLECTION :
BQ 3(a) / 1 - - -
BQ 3(a) / 2 - - -
BQ 3(a) / 3 - - -
BQ 3(a) / 4 - - -
BQ 3(a) / 4
BILL NO. 3(b) - DRAINAGE SYSTEM (ALL PROVISIONAL)
A To construct and lay 300mm half round drainage; 450mm wide m 110
brickwall c/w 50mm thk concrete blinding, concrete bed,
reinforcement; complete with including all necessary
excavation, backfilling, formwork, remove on completion and
make good all work disturbed whenever necessary all to the
entire satisfaction of the Engineers/SO and all as per relevant
drawings.
------------------------------------------------------------------------
F To supply and install mild steel trash screen overall size no. 1
1800mm x 900mm constructed of 50mm x 8mm thick
galvanised mild steel flat frame all around and 50mm x 8mm
flats at 25mm center to center welded to frame complete with
6mm thick galvanised mild steel U-shaped flats for trash screen
slot including all necessary works and all as per Engineer
drawing.
BQ 3(b) / 1
BILL NO. 3(c) - SEWER RETICULATION SYSTEM (ALL PROVISIONAL)
C Selected and approved 450mm wide bedding comprising of m Rate Only Rate Only
225mm thick compacted crusher run surround at bottom of
sewer pipe, 225mm thick selected compacted backfill surround
at top of sewer pipe, 225mm thick compacted backfill as
described spread, levelled, well compacted laid to slope as
instructed and approved by the S.O's/Engineer's.
MANHOLE COVER
-----------------------------------------------------------------
TO COLLECTION :
BQ 3(c) / 1
BILL NO. 3(c) - SEWER RETICULATION SYSTEM (ALL PROVISIONAL)
B Ditto exceeding 1.00 depth and not exceeding 2.00m depth, no. 1
ditto
-----------------------------------------------------------------
E On completion of the installation, test the entire system for the Item
flow and discharge rate, make good any defects and leave
everything in perfect working order to the entire satisfaction of
the Architect and Engineer and liase with the relevant
authorities for submission and commissioning.
TO COLLECTION :
COLLECTION :
BQ 3(c) / 1 - - -
BQ 3(c) / 2 - - -
BQ 3(c) / 2
BILL NO. 3(d) - REINFORCED CONCRETE RETAINING WALL (ALL PROVISIONAL)
----------------------------------------------------------------------------
Concrete Base
TO COLLECTION :
BQ 3(d) / 1
BILL NO. 3(d) - REINFORCED CONCRETE RETAINING WALL (ALL PROVISIONAL)
TO COLLECTION :
COLLECTION :
BQ 3(d) / 1 - - -
BQ 3(d) / 2 - - -
BQ 3(d) / 2
BILL NO. 4 - PROVISIONAL SUMS
B ROOF FINISHES
Provide a Provisional Sum of Ringgit Malaysia: ONE
HUNDRED FIFTY THOUSAND ONLY (RM 150,000.00) for
Roof Finishes. Item - - 150,000.00
C SANITARY APPLIANCES
Provide a Provisional Sum of Ringgit Malaysia: FIFTY
THOUSAND ONLY (RM 50,000.00 for Sanitary Appliances. Item - - 50,000.00
J LANDSCAPING WORKS
Provide a Provisional Sum of Ringgit Malaysia: FIFTY
THOUSAND ONLY (RM 50,000.00) for Landscaping Work. Item - - 50,000.00
TO COLLECTION : 1,525,000.00
BQ 4 / 1
BILL NO. 4 - PROVISIONAL SUMS
C CONTINGENCY SUM
Provide a Provisional Sum of Ringgit Malaysia: ONE
HUNDRED FIFTY THOUSAND ONLY (RM 150,000.00) for
Contingency Sum. Item - - 150,000.00
TO COLLECTION : 256,250.00
COLLECTION :
BQ 4 / 1 - - - 1,525,000.00
BQ 4 / 2 - - - 256,250.00
BQ 4 / 2