c=.›`.u=.c= ›Ç=e ›=”Í=’]”Ó %L.¾}.¾ÓM TIu`

Ref No: CRBC/MTH/ 032/13 Dates: May 29, 2013

TO: CORE Consulting Engineer PLC


Addis Ababa
Ref: Megenagna – Torhyloch Road Project, Contract 2.

Subject: Submission capping material from Jimma Quarry test result


Dear Sirs,
We hereby inform you that, we have jointly with your material inspector taken
the Capping material from Jimma Quarry. We tested it in our Kality
Laboratory. The test results as follows:

Type Of Material Item Test Result ERA Specification


Description
PI 18.4 ≤25
CBR at 42 ≥8
100%MDD
CBR at 36 ≥8
Capping 95%MDD
Material Swell at 0.60% <2%
100%MDD
Proctor MDD 1.97 --------
Proctor OMC 9.7% --------
So the test results all according with the specification, and hence we have
attached the test results and specification with this letter. Please check and
give us approval.

Thanking you in advance for your timely cooperation, we remain.


Sincerely your

Wang Yang
General Manager