IFH ENGINEERING PLC

አይ ኤፍ ኤች ኢንጅነሪንግ ኃ.የተ.የግል ማህበር

Ref No: IFH/BAC/057/14 Date: December 1, 2014

To: Road Design & Development Consultants/RDDC/PLC


Addis Ababa
Attn: Ato Berhanu Hailu, Resident Engineer
Ref: Ayat Round About- Sunshine Condominium Bole Arabsa
Asphalt Road Construction project Lot 3(Package 30 Bole
Arabssa 1&2)
Subject: Submission Natural subbase material from Arabsa Quarry test
result
Dear Sirs,

We hereby inform you that, we have jointly with your material inspector taken
the natural sub base material from Arabsa Quarry. We tested it in our Kality
Laboratory. The test results as follows:

Type Of Material Item Test Result ERA Specification


Description
PI 11.2 ≤12
CBR at 36 ≥30
95%MDD
Swell at 0.06% <2%
Natural Subbase 100%MDD
Material LAA 22% ≤51
Proctor MDD 2.12 --------
Proctor OMC 6.2% --------

So the test results all according with the specification, and hence we have
attached the test results with this letter. Please check and give us approval.
Thanking you in advance for your timely cooperation, we remain.

Sincerely your

Wang Yang
General Manager
Encl: 7 pages Attachment
CC:
 Project Manager