RB CRBC ADDIS ENGINEERING P.L.

C
c=.›`.u=.c= ›Ç=e ›=”Í=’]”Ó %L.¾}.¾ÓM TIu`

Ref No: CRBC/MTH/ 040/13 Dates: June 5, 2013

TO: CORE Consulting Engineer PLC


Addis Ababa
Ref: Megenagna – Torhyloch Road Project, Contract 2.

Subject: Submission backfill material from Jimma Quarry test result

Dear Sirs,

We hereby inform you that, we have jointly with your material inspector taken
the backfill material from Jimma Quarry. We tested it in our Kality
Laboratory. The test results as follows:

Type Of Material Item Test Result ERA Specification


Description
PI 17.1 ≤25
CBR at 50 ≥8
100%MDD
CBR at 36 ≥8
Backfill 95%MDD
Material Swell at 0.65% <2%
100%MDD
Proctor MDD 1.95 --------
Proctor OMC 13.2% --------

So the test results all according with the specification, and hence we have
attached the test results with this letter. Please check and give us approval.

Thanking you in advance for your timely cooperation, we remain.

Sincerely your

Wang Yang
General Manager
Encl: 7 pages Attachment
CC:

P.O.Box: 2509 Tel: 00251-4-391971 Fax: 00251-4-392468


Address: Kebele 10, Woreda Akaki Kaliti Sub-City, Addis Ababa, Ethiopia
 Project Manager

P.O.Box: 2509 Tel: 00251-4-391971 Fax: 00251-4-392468


Address: Kebele 10, Woreda Akaki Kaliti Sub-City, Addis Ababa, Ethiopia

You might also like