Doc.No.

JPPL/H/QAD/F/10
Sustenance Audit Rev.No. & Date 00/ 07.11.2022
Jayashree Polymers Pvt Ltd, Hosur Page No. 1 of 1
Date of Audit: 11.05.2023
Audited By: Mr. Manikandan R

SL.No Part Number Part Name Customer Issues/Complaint Action Taken Observation Status Remarks

1. Loading method verified and found ok as per Action plan


sequence followed (+)
1. BOP Loading sequence change ( BOP Loading after only 2. Input Load weight variation is found as per specification
Cpd shoud be load) (21 to 22 gms) but Actual - 22.98 gms found (-)
2. Loading weight should be standarized and 100% weight
1 1100459 Rubber Strap Battery M/S REML Thickness Issue verification to be carried 2.1. 100% Input load verification not carried (-) Open
3. As per Detection Action plan Part pull inspection not
3. Inspection method ( Part pull inspection implemented &
carried only visual Inspection carried. (-)
Thickness sampling inspection carried)
3.1. Thickness sampling inspection addressed in Work
Instruction (+) but Part Pull Inspection not addressed.(-)