HSE Inspection Report

Document Code: TCM/HSE/RPT-001 Rev#: 00 Issue Date: 22 Oct 2022

Outlet Name: Unze London Manager Name: Shoaib Illyas


Location: 3rd Floor Inspection Date: 11-08-2023
Inspection Team: Waqar, Sajad and Anwar (HSE Officer, Fire Fighting Technician & Sr HSE Engineer)

A - Red Zone The red zone shops should not operate until the deficiencies are rectified
Outlet Category B B – Minor Modification (5-10 days for rectification) Minor items should be fixed or added in outlets (depending on the situation).
C - Major Modification There are some shops that need to change their duct (e. g. Ansul systems). In this case, we can give them three months
Note:
Sprinkler valve and pressure gauge verification required.

Sr. Observations Pictorial Evidence Corrective Action Required

 Remarks of shop manager is that the


 Letter was issued to this shop on 17th March
1. shop will be going on Renovation after
2023 but the observations are still same.
Eid ul Fitar.

 FACP separate breaker need to install


2.  FACP separate breaker not installed in outlet. outside the electric DB.
 FACP not connected with main power supply.  FACP need to connect with main power
supply.

© Internal Use Only The Centaurus Mall Page: 1 of 3


HSE Inspection Report
Document Code: TCM/HSE/RPT-001 Rev#: 00 Issue Date: 22 Oct 2022

 Material was not place under 18” of sprinkler.  Material should place under 18” of
3.  Firefighting line was not in red paint. sprinkler.
 Firefighting line must be in red painting.

 Electric D.B was not visible and easily


 Electric DBs need to relocate at visible &
accessible.
accessible location.
 ELCB (earth leakage circuit breaker) not
 ELCB (earth leakage circuit breaker) must
4. installed in Electric DB.
be installed in Electric DB.
 Combustible material damped near electric
 Combustible materials need to remove.
DB.

 Exposed wiring should be placed in duct


 Electric Wires found exposed in store room.
putties and insulated by using flexible
 Combustible material stored near electrical
5. pipes.
connections.
 Combustible material should be removed
near electrical wiring.

© Internal Use Only The Centaurus Mall Page: 2 of 3


HSE Inspection Report
Document Code: TCM/HSE/RPT-001 Rev#: 00 Issue Date: 22 Oct 2022

 Fire retardant not found woody material.  Fire retardent paint must be on woody
6.
material.

 Sprinkler vavle access panel must be


7.  Sprinkler valve access panel not available.
avalible.

© Internal Use Only The Centaurus Mall Page: 3 of 3