Professional Documents
Culture Documents
Version 1.4
TCS Internal
DOCUMENT REVISION LIST
TCS Internal
Document Number : 1.0
1.4 07- Nov- 2016 Added the point to advise 'Reading the Drill Pg No 3 Add
report Review checklist' before starting any drill
by stakeholders."
1.1 03 Dec -2013 Actual and Planned values for RTO and
RPO has been done.
3
BCM TEST PLAN & REPORT
Scope of Testing4
(scenarios to be tested)
Call Tree Simulation- Services, components, assets, modules,
functions, scenarios tested
Test Call Tree to ensure that each & every individual associate is reachable
Testing Objective
(What is to be achieved by this test)
1
The Asset Name or Sub Services that are subjected to testing has to be briefly described here.
2
The Test Report has to be reviewed by the respective IOU CML
3
The Primary Location (TCS Facility) where the Outage scenario is simulated.
4
In the Scope of testing – Indicate the outage scenario that is been planned for simulation along with the
continuity strategies those will be tested during this exercise.
4
NA
AU FIG Solution
1 Anuradha 1244280 Project Leader
for BC Model
AU FIG Solution
2 Sahil Yadav 2203620 Team Member
for BC Model
AU FIG Solution
3 Induprakash Singh 354347 Group Leader
for BC Model
Activity Steps
Expected
Execution Result expected Actual Result of Actual time taken for the
Steps for the test duration for
Responsibility of the test step the test step step
execution
Associate is
responded to my
Associates can be call within the
Call to Anuradha 10 Min 5 Min
Sahil Yadav reached expected time
Associate is
Anuradha Associates can be responded to my
Call to Sahil Yadav 15 Min 10 Min
reached call within the
expected time
5
responded to my
call within the
expected time
5
All the associates participating in the drill should read the drill report review checklist before starting the
drill
Test Results
i. Successful
ii. Unsuccessful
Tried reaching the team but some has not responded on time which we will take care in upcoming call tress.
6
<< Indicate the actions planned to overcome the above mentioned, observations >>
The BC Plan (COOP ) sheet will accordingly be modified to ensure admin team gets early notified and adequate time to arrange, in
worst case scenarios
S. No. Screenshots Name/Description Inference from Screenshots Fig. No. Page No.
(Note: The screenshots should be legible with date/time stamp on the screen)
**** ****
6
RTO value here should be same as mentioned in BIA _Restoration Priority sheet in BCP document. If multiple
Services are being tested, then please mention RTO for all the Services being tested for continuity.
7
RPO value here should be same as mentioned in BIA _Restoration Priority sheet in BCP document. If multiple
Services are being tested, then please mention RPO for all the Services being tested for continuity.