You are on page 1of 36

ELEVAR

Mission & 16th BART Plaza

Anjali Beekam | SF Urban | Spring 2023


MISSION & GOALS

Elevar aimsMISSION
to uplift theSTATEMENT
community by proposing
Toa enhance
new affordable housing
the community complex
by building at Mission
a new affordableand
housing
development at Mission
16th treet, that enablesandthe
16thresidents
Street, thatand
improves the lives
promotes
ofneighborhood
its residents andwell
promotes
beingneighborhood
by embracing wellabeing
rangethrough
of the
creation of activated outdoor spaces
activated outdoor spaces

GOALS
Housing Site
To create housing for a diverse To provide protected and private
group of residents that is safe, open spaces through the building
comfortable, and affordable forms which juxtapose the public
nature of the BART plaza

Community Context
To allow residents to engage in To become a landmark presence
healthy social integration while that is cognizant of its surround-
providing ample safety to the ings
community

ELEVAR | Context
MISSION DISTRICT

MISSION & 16th

ELEVAR | Context
HISTORIC CONTEXT
MISSION DISTRICT
1905
1905 1915
1905
1915 BART
BART

1930S
1930 s 1978
1978 BART Plaza
BART PLAZA

ELEVAR | Context
In reference to Calle 24 TRANSIT
a. Create a sequential entry to building fronts,
MISSION & 16th
separate from the BART plaza entry with am-
Transit: BART, MUNI, Pedestrians
ple vegetation and landscaping

b. Characterize entryways,
Transit: and public
BART, MUNI, right of
Pedestrians
ways with murals to celebrate Latino history
and cultural heritage Murals: Latinx Cultural Heritage
Murals: Latinx Cultural Heritage
c. Design sidewalks to guide users with out-
door seating and furnishing that complement
the commercial Plaza:
Plaza:programs
presence presence
of public space of public space
d. Emphasize walkability, green spaces, and
planted trees to create protected
Vegetation: a healthy and
and breath-
healthy spaces
able public realm Vegetation: protected and healthy
RESOURCE MAP spaces
Landmarks: Redstone Building FIGURE GROUND MAP

ELEVAR | Context
THE SITE
MISSION DISTRICT

ELEVAR | The Site


SITE PLANNING

3 N-S masses reduces shadows


cast by southern masses

Shifted to provide a common resi-


dent courtyard

Creates storefront Public Open


Space

Entryway Thresholds between pub-


lic and private open spaces

Activates BART entry sequence

ELEVAR | Planning
MASS GENERATION

25’ Entry Sequence

Mid Rise on Mission

Low Rise on Capp

Mid Block High Rise

ELEVAR | Massing
SITE PLAN

Mission St.

Capp St.
ELEVAR | Program
SITE PLAN

3 entries and 3 lobbies

Visually porous on mission St.

Entries highlighted on 16th St.

Resident scale on Capp St.

Mission St.

Capp St.
ELEVAR | Program
SITE PLAN

Mission St.

Capp St.
ELEVAR | Landscape
SITE PLAN

Method of activation and the resi-


dent’s experience of using angled
paths through their activities

ELEVAR | Program
SITE PLAN

Mission St.

Capp St.
ELEVAR | Landscape
FLEXIBLE SUPPORTIVE HOUSING ZONE

ELEVAR | Landscape
BIOSWALE

ELEVAR | Landscape
RESIDENTIAL LEVELS

three bedroom

one bedroom

two bedroom

studio

ELEVAR | Program
RESIDENTIAL LEVELS

three bedroom

one bedroom

two bedroom

studio

ELEVAR | Program
RESIDENTIAL LEVELS

three bedroom

one bedroom

two bedroom

studio

ELEVAR | Program
RESIDENTIAL LEVELS

three bedroom

one bedroom

two bedroom

studio

ELEVAR | Program
UNIT PLANS
Multi Family Housing
Capp St. | Level 3-5
Supportive Housing Supportive Housing
Mission St. | Level 2-7 Mission St. | Level 2-7

Studio | 495 sf 1 bedroom | 675 sf

2 bedroom | 960 sf

ELEVAR | Program
UNIT PLANS

Multi Family Housing Multi Family Housing Multi Family Housing


Mission St. | Level 2-11 Capp St. | Level 1-2 Capp St. | Level 1-2

3 bedroom | 1,148 sf Townhouse | 1,500 sf

ELEVAR | Program
E-W SECTION

25’

25’

Mission St. Capp St.

ELEVAR | Program
UNIT COUNT TABULATION
SPRING PROJECT TABULATION SHEET
Student:
BUILDINGS UNITS BUILDING AREA HEIGHT
Small Jr. One One Two Three Four Units Residential Non-Residential Area Top Floor
Studio Studio Bedroom Bedroom Bedroom Bedroom Bedroom Total Area Area Total in Stories
BUILDING A: Family Housing 23 115 46 23 207 147,775 7,925 155700 10'
BUILDING B: Family Housing 3 27 5 35 34,328 8,582 42910 10'
BUILDING C: Supportive Housing 112 7 119 74,200 10,600 84800 10'
TOTALS 0 112 23 125 73 28 0 361 256303 27107 283410

USING THIS TABLE: fill in data for cells marked x. Totals will calculate. Save and upload to final project upload area. Then save as pdf after deleting these instructions and insert in final presentation slides
for STORIES count the first floor as a story regardlss of height. However If there are some two story townhouses in this zone then it counts as 2 stories.

Studio: 37.4%

1 Bedroom: 34.6%

2 bedroom: 20.21%

3 bedroom: 7.6%

ELEVAR | Program
OVERALL BUILDING AXON

ELEVAR | Massing
CHARACTER APPROACH

Elongated frames to emphasize elevar

Use warm materials to emphasize hearth

Contrast for lightness and connection to the sky

Use horizontal details to balance the rhythm

Utilize blank walls as opportunities for local expression

ELEVAR | Character
CHARACTER APPROACH

Sky: Stucco, Fiber Cement Panel

Hearth: Terra Cotta

Natural: Oak or other wood

Framing views: glass curtain wall

Cirulation: Wood louvered walls

Grounded Base: Vertical Brick wall

ELEVAR | Character
MISSION STREET

ELEVAR | Character
MISSION STREET VIEW

ELEVAR | Character
CAPP STREET

ELEVAR | Character
MARSHALL ELEMENTARY SCHOOL

ELEVAR | Character
CAPP STREET

ELEVAR | Character
16th STREET

ELEVAR | Character
16th STREET

ELEVAR | Character
SUMMARY
SUMMARY

Mission St.

Capp St.
THANK YOU!

You might also like