The document lists materials needed for temporary electrification at a prime location including a vertical distribution board in the basement with a 100 amp MCCB and 5 63 amp MCBs, 200 amp copper busbar in the basement, DP enclosures and MCBs on the 15th floor along with industrial socket outlets, and aluminum XLPE cables running from the ground floor.
The document lists materials needed for temporary electrification at a prime location including a vertical distribution board in the basement with a 100 amp MCCB and 5 63 amp MCBs, 200 amp copper busbar in the basement, DP enclosures and MCBs on the 15th floor along with industrial socket outlets, and aluminum XLPE cables running from the ground floor.
The document lists materials needed for temporary electrification at a prime location including a vertical distribution board in the basement with a 100 amp MCCB and 5 63 amp MCBs, 200 amp copper busbar in the basement, DP enclosures and MCBs on the 15th floor along with industrial socket outlets, and aluminum XLPE cables running from the ground floor.