Doc No: IMS-OM-CL-001-R00

Rev No: R0
PPM CHECKLIST: ACDB PANEL
Date:14/05/2013
Page 1 of 1

Plant Name :250 MW BADWAR REWA M.P


Equipment ID :
Equipment Name : LT DB Panel
Location :
Date :
Frequency :

Sr. No. Maintenance Checklist points Frequency Status

1 Check Door locking mechanism Monthly

2 Cleaning of Panel Inside and Outside Monthly

3 Check the illumination and space heater Quarterly

4 Check the tightness of joints Quarterly

5 Inspect all wires for wear & cuts. Replace if necessary. Half Yearly

6 Check the MCCB, Control switch Yearly

Observations/Suggestions:

Spares Replaced / Required Quantity

PPM Carried Out By : Supervisor Site Engg.


MTPL O&M MTPL (MTPL)