DAILY ACTIVITY REPORT

Project SDC PROJECT


DATE 21/6/2023 Reported By: Tanvir Alam

LOCATION ACTIVITY NO.of Manpower

Jubail-2 1. ANCHOR BOLT FIXING/INSTALLATION 6

Manpower EQUIPMENT
S.N Manpower Description
Direct Indirect Equipment Name Working Idle

1 Manager 0 Welding Machine 1

2 QC manager 0 Hand Grinder 1

3 0 Electric generator 1

9 Quality Control Eng 1

10 HSE 1

11 Site Supervisor 1

12 Surveyor 0 0

15 Steel fixer 3 0

Total 3 3 Total Equipment 3


Accumulative Manpower 6