You are on page 1of 33

COMPANY DOCUMENT NO.

JOB CODE REV.


SLTR-S-000-1310-101
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 1A
S-000-1310-101
PAGE 1 OF 6

SUMBAWA LNG TERMINAL &


REGAS FACILITY

CLASS [2]

SITE INSPECTION AND TEST PLAN (ITP)


FOR CIVIL WORK

FOR REVIEW

REV. DATE PAGE DESCRIPTION PREP’D CHK’D APP’D CPY APP’D

1A 18-Jan-23 All Issued for Review R. Setiawan Anthonius F.T Subekti

DM02S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD

J-20-Jan-2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY MEDCO SUMBAWA GAS

D
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-1310-101
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 1A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-1310-101
SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORK Page 2 of 6

RECORD OF REVISION
The revision listed below have been incorporated in this copy of the document.
REV PAGE
SECTION DESCRIPTION OF CHANGES
NO NO.

DM02S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD

J-20-Jan-2
PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY MEDCO SUMBAWA GAS.

D
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-1310-101
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 1A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-1310-101
SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORK Page 3 of 6

CONTENTS

1. INTRODUCTION ................................................................................................................... 4
2. PURPOSE AND SCOPE ....................................................................................................... 4
3. DEFINITION AND ABBREVIATION ...................................................................................... 4
4. REFERENCES ...................................................................................................................... 5
5. RESPONSIBILITIES.............................................................................................................. 5
6. INSPECTION INTERVENTION LEVEL ................................................................................. 6
7. ATTACHMENT ...................................................................................................................... 6

DM02S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD

J-20-Jan-2
PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY MEDCO SUMBAWA GAS.

D
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-1310-101
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 1A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-1310-101
SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORK Page 4 of 6

1. INTRODUCTION
PT Amman Mineral Nusa Tenggara (AMNT) plans to build additional combine cycle power generation
plant for their expansion projects including smelter and other new facilities. To provide gas for those
facilities AMNT engaged PT Medco Sumbawa Gas (MSG) to develop and operate a new LNG Terminal
and Regas Facility within AMNT operation area in Benete Bay of Sumbawa Island, West Nusa
Tenggara, Indonesia.
The project includes facilities of onshore LNG storage tank with capacity of 50,000 m3 and 160,000 m3,
regasification unit to produces up to 77 mmscfd gas, an LNG-Carrier jetty with trestle, utilities, buildings
and gas sendout pipelines to the power plant and smelter.

2. PURPOSE AND SCOPE


The purpose of this document is to ensure that all Construction / Installation of Structure works are
inspected and tested in accordance with the relevant Codes, Standards, Government Regulations,
Procedures and Project Specifications. This document is generic test plan as guideline for
SUBCONTRACTOR to develop the specific inspection plan in accordance with contract scope of work.

This document covers inspection and test items and its intervention point of each party for each work
category during construction stage at site of Sumbawa LNG Terminal & Regas Facility Project for Earth
Work, Concrete Work, Sewer and Drainage, Road Work .

This Site ITP can be adopted by SUBCONTRACTOR subject to approval by CONTRACTOR. All the check
lists and inspection formats reported herein shall be followed by SUBCONTRACTOR to maintain uniformity
in checklists / formats even when a SUBCONTRACTOR is preparing its own Site ITP based on this
document guidelines.

3. DEFINITION AND ABBREVIATION


(1) COMPANY : PT Medco Sumbawa Gas
(2) CONTRACTOR : PT JGC Indonesia
(3) SUB-CONTRACTOR : Any organization who provides service of construction and/or
Installation of Steel Structure and/or Material for the Project.
(4) AMNT : PT Amman Mineral Nusa Tenggara
(5) AMIN : PT Amman Mineral Industri
(6) MIGAS : Directorate of Oil and Gas (Direktorat Jendral Minyak dan Gas
Bumi)
(7) TPIA : Authorized Third Party Inspection Agency of MIGAS

DM02S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD

J-20-Jan-2
PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY MEDCO SUMBAWA GAS.

D
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-1310-101
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 1A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-1310-101
SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORK Page 5 of 6

4. REFERENCES

SLTR-S-000-3115-001
Construction Specification for Earth Works
(S-000-3115-001)

SLTR-S-000-3116-001
Construction Specification for Sewer and Drainage
(S-000-3116-001)

SLTR-S-000-3117-001
Construction Specification for Road and Paving
(S-000-3117-001)

SLTR-S-000-3120-001
Construction Specification for Concrete Works
(S-000-3120-001)

SLTR-S-000-1520-001
Quality Control Execution Plan
(S-000-1520-001)

SLTR-S-000-1670-001
Quality Control Requirement to Subcontractor
(S-000-1670-001)

5. RESPONSIBILITIES
SUBCONTRACTOR shall be responsible to prepare and submit Inspection & Test Plan (ITP) related to
their scope of work to CONTRACTOR for review and approval prior to commence the construction /
installation work.

CONTRACTOR and COMPANY shall be responsible to review and approve the ITP submitted by
SUBCONTRACTOR.

When required, the SUBCONTRACTOR’s ITP shall be submitted to MIGAS / TPIA by COMPANY for
determination of their witness or hold points on the inspection and test items during construction /
installation at site.

DM02S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD

J-20-Jan-2
PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY MEDCO SUMBAWA GAS.

D
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-1310-101
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 1A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-1310-101
SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORK Page 6 of 6

6. INSPECTION INTERVENTION LEVEL

Letter Abbreviation Description

CONTRACTOR/COMPANY intends to conduct witness


inspection/test. SUBCONTRACTOR shall submit inspection
H Hold point notification to CONTRACTOR. SUBCONTRACTOR is not
allowed to proceed with the inspection/test unless a written
release is issued by CONTRACTOR.

CONTRACTOR/COMPANY intends to conduct witness


inspection/test. SUBCONTRACTOR shall submit inspection
notification to CONTRACTOR. However SUBCONTRACTOR
W Witness point
can proceed with the inspection/test when
CONTRACTOR’s/COMPANY’s inspector is not present at the
notified time.

CONTRACTOR/COMPANY intends to conduct witness


inspection/test by spot/randomly. SUBCONTRACTOR shall
submit inspection notification to CONTRACTOR. However
SW Spot witness
SUBCONTRACTOR can proceed with the inspection/test
when CONTRACTOR’s/COMPANY’s inspector is not present
at the notified time.

Preparation and execution of measurement, observation,


M Implementation
examination or testing and reporting.

SUBCONTRACTOR is requested to submit the documents or


R Record review
inspection records to CONTRACTOR for review.

7. ATTACHMENT
(1) Site Inspection and Test (ITP)

(2) Site Inspection and Test Record (ITR) Form

DM02S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD

J-20-Jan-2
PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY MEDCO SUMBAWA GAS.

D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT - 1
Site Inspection and Test Plan (ITP)

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORKS


Legend
H : Hold Point M : Implementation JIND : PT. JGC Indonesia
W : Witness Point R : Record Review TPIA : Third Party Inspection Agency Quantum of check
SW : Spot Witness MSG : PT. MEDCO SUMBAWA GAS MIGAS : Direktorat Jendral Minyak dan Gas Bumi
-column to be added
INSPECTION INTERVENTION LEVEL

No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA

1 EARTH WORK (Include Road and Paving)


1.1 Excavation
(1) Setting out survey SLTR-S-000-3115-001 As per each drawing ITR-2000-007 M W R -
(S-000-3115-001)
a Calibration of survey instruments R R R

(2) Finishing survey As per each drawing ITR-2000-007 M W R -

(3) Tolerance ITR-2000-007

(3.1) Excavation tolerance SLTR-S-000-3115-001 As per applicable specification M W R -


(S-000-3115-001)

(3.2) Graveled area SLTR-S-000-3117-001 As per applicable specification M W R -


(S-000-3117-001)

1.2 Fill Material


(1) Site Material for Fill SLTR-S-000-3115-001 M W R -
(S-000-3115-001)

(2) Base material for road SLTR-S-000-3117-001 As per applicable specification M W R -


(S-000-3117-001)

(3) Gravel for gravel pave SLTR-S-000-3117-001 Max. particle size = 50mm M W R -
(S-000-3117-001)

1.3 Filling and Compaction


(1) Placement SLTR-S-000-3115-001 M W SW
(S-000-3115-001)

Thickness/per layer Max. 300 mm ITR-2000-009

(2) Compaction (CBR and Density) Not less than 95% of maximum dry ITR-2000-005 M W SW -
density obtained by the modified
proctor test, ASTM D1557
w
(3) Tolerance -

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORKS


Legend
H : Hold Point M : Implementation JIND : PT. JGC Indonesia
W : Witness Point R : Record Review TPIA : Third Party Inspection Agency
SW : Spot Witness MSG : PT. MEDCO SUMBAWA GAS MIGAS : Direktorat Jendral Minyak dan Gas Bumi

INSPECTION INTERVENTION LEVEL

No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA

(3.1) Filling SLTR-S-000-3115-001 As per applicable specification ITR-2000-009 M W R -


(S-000-3115-001)

(3.2) Graveled area SLTR-S-000-3117-001 As per applicable specification M W R -


(S-000-3117-001)

2 CONCRETE WORK
2.1 Material SLTR-S-000-3120-001
(S-000-3120-001)

2.1.1 Material approval

(1) Cement ASTM C 150 and Type I To be stored as per 6.1.2 Material Certificate M R R - Every Delivery

Cement remaining in weather-tight


bulk storage for more than 6
months, or cement in bags in local
storage in the custody of a vendor
for more than 4 months after
completion of tests shall not be
used.

(2) Aggregate ASTM C33 Maximum size of coarse aggregate Material Certificate M R R - Initially for
for structural concrete shall be trial mix,
20mm, except that fireproofing Every Delivery
concrete that shall be 10mm. for Working
Mix
(3) Mixing water ASTM C94 The total sulphur content of the M R R -
water, expressed as PPM by mass of
sulphate ion shall not exceed 1000.

(4) Admixture or additve Section 6.4 Manufacturer certificate/MSDS M R R - Every Delivery

(5) Reinforcing bar Manufacture’s certificate Manufacture’s certificate M R R -

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORKS


Legend
H : Hold Point M : Implementation JIND : PT. JGC Indonesia
W : Witness Point R : Record Review TPIA : Third Party Inspection Agency
SW : Spot Witness MSG : PT. MEDCO SUMBAWA GAS MIGAS : Direktorat Jendral Minyak dan Gas Bumi

INSPECTION INTERVENTION LEVEL

No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA

- Deform rebar SNI-07-2052-2002 Grade BJTS40,


fy=390N/mm2 or ASTM A615/A615M
Grade60
- Plain rebar SNI-07-2052-2002 Grade BJTP24,
fy=235N/mm2 or ASTM A615/A615M
Grade40
- Welded wire fabric SNI-07-0663-1995, fy=490N/mm2 or ASTM
A185/A185M
(6) Anchor bolt By Manufacture’s data report M SW R -

(7) Embedded Steel Applicable drawing, mill certificate M SW R -

(8) Water Stop Manufacture's certificate M SW R -


Applicable drawing
2.2 Concrete Mixing ASTM C94/C94M M R R
(1) Trial mix Per mix design Mix Formula -

(1.1) Slump test SLTR-S-000-3120-001 M W SW -


(S-000-3120-001)

(1.2) Air contents ASTM C138, C173 or C231 M R R -

(1.3) Temperature Max. 38 deg. C M W SW -

(1.4) Compression Test One at 7 days for information, Three ITR-2000-003 M W SW -


at 28 days for determining
acceptability of concrete strength as
per 12.2.4
(2) Working mix M W SW -

(1.1) Slump test SLTR-S-000-3120-001 M W SW -


(S-000-3120-001)

(3) SO3 content Max. 4% by cement wt. -

(4) Temperature Max. 38 deg. C -

(5) Compression test One at 7 days for information, Three ITR-2000-003 M W SW -


at 28 days for determining
acceptability of concrete strength as
per 12.2.4

Concrete design mix detail to be

D M S3 added
-
J20-Jan- 2 0 2
INTE D
Cube sampling/ testing detail to
be added
H EN PR
LED W
TROL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORKS


Legend
H : Hold Point M : Implementation JIND : PT. JGC Indonesia
W : Witness Point R : Record Review TPIA : Third Party Inspection Agency
SW : Spot Witness MSG : PT. MEDCO SUMBAWA GAS MIGAS : Direktorat Jendral Minyak dan Gas Bumi

INSPECTION INTERVENTION LEVEL

No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA

2.3 Concrete Foundation

(1) Blinding concrete ITR-2000-001 -

(1.1) Ground condition Clear of loose material M W R -

(1.2) Check of level/Location As per drawing M W R -

(1.3) Thickness Minimum 50 mm M W R -

(2) Re-bar work SLTR-S-000-3120-001 ITR-2000-001 -


(S-000-3120-001)

(2.1) Bar size / Type Drawing M W SW -

(2.2) Number of bar Drawing M W SW -

(2.3) Length Drawing M W SW -

(2.4) Condition of re-bar ACI 117 As per section 8.2.3 M W SW -

(2.5) Splicing ACI 117 Drawing M W SW -

(2.6) Spacing ACI 117 As per drawing M W SW -

(2.7) Hook ACI 117 As per drawing M W SW -

(2.8) Minimum cover M W SW -

Cast-in place concrete (non re- SLTR-D-000-1310-001 Cast against and permanently
stressed) (D-000-1310-001) exposed to earth:
Cast-In-situ bored pile : 100mm
Retaining wall, Anchor block : 75mm

Exposed to Earth/ Weather :


2.9 Anchor bolt /Embedded Footing, Pit : 50mm
item/pocket etc
All other structure
ACI 117
Rebar D19 and bigger : 50mm
Rebar D16 and smaller, wire : 40mm

Not exposed to Weather nor in


Contact with the ground :
Beam, Column : 40mm
Slab, Wall, Joist : 30mm

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORKS


Legend
H : Hold Point M : Implementation JIND : PT. JGC Indonesia
W : Witness Point R : Record Review TPIA : Third Party Inspection Agency
SW : Spot Witness MSG : PT. MEDCO SUMBAWA GAS MIGAS : Direktorat Jendral Minyak dan Gas Bumi

INSPECTION INTERVENTION LEVEL

No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA

(2.9) Allowable tolerance for installation of re- SLTR-S-000-3120-001 As per reference document M W SW -
bar (S-000-3120-001)

ACI 117

2.4 Concrete Pave


(1) Polyethylene sheet SLTR-S-000-3117-001 Polyethylene sheet: at least 0.15 ITR-2000-006 M W SW -
(S-000-3117-001) mm thickness

(1.1) Grounding condition Clear of loose material M W SW -


(1.2) Check of level As per drawing M W SW -
(1.3) Overlap Minimum 150 mm M W SW -
(2) Reinforcing mesh SLTR-D-000-1317-002 Coated WWF per SNI 07-0663-1995 ITR-2000-006
(D-000-1317-002) fy=490 N/mm2 or ASTM
A185/A185M, or equivalent
(2.1) Size, Type dia. 6-150X150 M W SW -
(2.2) Over-lap At least 150mm laying at right-angle M SW SW -
to the edges to be lapped
(2.3) Condition of mesh Clear and free from mill scale grease M SW SW -
and concrete
(2.4) No of spacer blocks Max. 1 m spacing M SW SW -
(2.5) Cover Heavy duty : 40mm top and bottom ITR-2000-006 M SW SW -
Light duty : 40mm top

(3) Joint SLTR-S-000-3117-001


(S-000-3117-001)

(3.1) Check spacing As per drawing M W SW -


(3.2) Sealant SLTR-D-000-1310-001 M W SW -
(D-000-1310-001)
(4) Concrete work SLTR-S-000-3120-001 M W SW -
(S-000-3120-001)
(5) Curing SLTR-S-000-3120-001 To be maintained wet at least 5 M SW SW -
(S-000-3120-001) days

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORKS


Legend
H : Hold Point M : Implementation JIND : PT. JGC Indonesia
W : Witness Point R : Record Review TPIA : Third Party Inspection Agency
SW : Spot Witness MSG : PT. MEDCO SUMBAWA GAS MIGAS : Direktorat Jendral Minyak dan Gas Bumi

INSPECTION INTERVENTION LEVEL

No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA

3 FORM WORK SLTR-S-000-3120-001 (S-000-3120-001) ITR-2000-001 M SW SW


W
ACI 117
(1) Preparation of form surface As per reference document M SW SW -

(1) Removal of forms As per reference document M SW SW -

4 ANCHOR BOLT/EMBEDDED PLATE ACI 117 and Section 13.1.4 ITR-2000-001


(1) Size, Type, Number As per drawing M W SW -

(2) Location, Elevation Location +3mm, -3mm M W SW -


Projection +7mm, -0mm
(3) Firmly support Adequate M W SW -

(4) Protection from corrosion and damage M W SW -

5 CONCRETE WORK SLTR-S-000-3120-001 (S-000-3120-001) and ACI 301


(1) Construction Joint Adequate roughened and clean M SW SW -
(2) Vibrator Ensure vibration is adequate M SW SW -
(3) Free height of discharge Max. 1.5 m M SW SW -

6 FINISHING SLTR-S-000-3120-001 (S-000-3120-001)


As per reference document M SW SW
ACI 301
7 CURING SLTR-S-000-3120-001 (S-000-3120-001) As per reference document
M SW SW

8 POST CONCRETING (as necessary)


(1) Repair of surface defect SLTR-S-000-3120-001 As per reference document ITR-2000-008 M W SW -
(Contractor ID: S-000-3120-001)

ACI 301
(2) Holes of tie-rods SLTR-S-000-3120-001 As per reference document ITR-2000-008 M W SW -
(S-000-3120-001)

9 PILING (NOT APPLICABLE)

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORKS


Legend
H : Hold Point M : Implementation JIND : PT. JGC Indonesia
W : Witness Point R : Record Review TPIA : Third Party Inspection Agency
SW : Spot Witness MSG : PT. MEDCO SUMBAWA GAS MIGAS : Direktorat Jendral Minyak dan Gas Bumi

INSPECTION INTERVENTION LEVEL

No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA

10 SEWER AND DRAINAGE


10.1 Material SW
(1) Underground Gravity Piping Material - Packing list Complete as per Packing list and No ITR-1000-004 M SW R
- Inspection Release Certificate Defect
(1.1) Reinforced concrete pipe M R R
(1.3) Carbon steel pipe M R R

(2) Wrapping material - Packing list


- Inspection Release Certificate
(2.1) Priming Complete as per Packing list and No ITR-1000-004 M R R
Defect
(2.2) Outer wrapping M R R

10.2 Installation of Piping SLTR-S-000-3116-001 (S-000-3116-001)

(1) Excavation for trenching Drawing As per Drawing

(1.1) Setting out survey Drawing As per Drawing M W SW

(1.2) Pipe bedding SLTR-S-000-3116-001 (S-000-3116-001) SLTR-D-000-1316-001 (D-000-1316- M W SW


001)
(2) Pipe laying SLTR-S-000-3116-001 (S-000-3116-001) ITR-1000-001

(2.1) Pipe installation SLTR-S-000-3116-001 (S-000-3116-001) Level of upstream shall be higher M W SW


than the on of downstream.
Elevation: within plus or minus 25
mm
W
(3) Pipe jointing SLTR-S-000-3116-001 (S-000-3116-001) ITR-1000-001 M W SW

(3.1) Welder qualification SLTR-S-000-1670-007 (S-000-1670-007) ASME IX M R R


(Welder / Welding Operator Control SW
Procedure for Construction)
(3.2) Welding Procedure Specification & PQR SLTR-S-000-1670-008 / S-000-1670-008 ASME IX M R R
(Welding Control Procedure for
Construction)
(3.3) Visual Welding Inspection Welding Procedure Specfication As per ASME M W SW
Isometric Drawing
(3.4) Painting (Touch up) and Wrapping SLTR-S-000-13A0-001 (S-000-13A0-001) ITR-1000-001 M W SW

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORKS


Legend
H : Hold Point M : Implementation JIND : PT. JGC Indonesia
W : Witness Point R : Record Review TPIA : Third Party Inspection Agency
SW : Spot Witness MSG : PT. MEDCO SUMBAWA GAS MIGAS : Direktorat Jendral Minyak dan Gas Bumi

INSPECTION INTERVENTION LEVEL

No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA

(4) Backfilling SLTR-S-000-3115-001 (S-000-3115-001) SLTR-D-000-1316-001 (D-000-1316- ITR-1000-001 M W SW


001)
10.3 Leak Test
(1) Water filling test to pipe SLTR-S-000-3116-001 (S-000-3116-001) As per reference document and ITR-1000-001 M W W
drawing
(2) Water filling test to pit SLTR-S-000-3120-001 (S-000-3120-001) As per reference document and ITR-1000-001 M W W
drawing

(3) Holiday test (if coated/wrapped) As per reference document and ITR-1000-001 M W SW
drawing
11 ROAD WORK
11.1 Material Receiving
(1) Sub-base course materials, Base course
materials
(1.1) Specification & size, Volume, Quantity SLTR-S-000-3117-001 (S-000-3117-001) As per reference document ITR-1000-004 M W SW

11.2 Excavation

(1) Setting out survey

(1.1) Line, Grade, and Elevation SLTR-S-000-3115-001 (S-000-3115-001) and SLTR-S-000-3115-001 (S-000-3115- ITR-2000-007 M W SW
Drawing 001) and Drawing
(2) Finishing survey

(2.1) Width, Length, and Depth Drawing As per Drawing ITR-2000-007 M W SW

(3) Tolerance of Excavation

(3.1) Width, Length, and Depth SLTR-S-000-3115-001 (S-000-3115-001) and SLTR-S-000-3115-001 (S-000-3115- ITR-2000-007 M W SW
Drawing 001) and Drawing

11.3 Sub-base coarse


(1) Sub-base coarse Filling SLTR-S-000-3117-001 (S-000-3117-001) As per reference document ITR-1000-005 M W SW

(2) Sub-base coarse Compaction SLTR-S-000-3117-001 (S-000-3117-001) As per reference document ITR-1000-005 M W SW

11.4 Base coarse


(1) Base coarse Filling SLTR-S-000-3117-001 (S-000-3117-001) As per reference document ITR-1000-005 M W SW

D M S3
-
J20-Jan- 2 0 2
INTED
A. Sub base /base coarse -quality testing details to be added
B. Job mix formal to be added, if any ( as per approved drawing )

R
HEN P
ROLLED W
NCONT
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORKS


Legend
H : Hold Point M : Implementation JIND : PT. JGC Indonesia
W : Witness Point R : Record Review TPIA : Third Party Inspection Agency
SW : Spot Witness MSG : PT. MEDCO SUMBAWA GAS MIGAS : Direktorat Jendral Minyak dan Gas Bumi

INSPECTION INTERVENTION LEVEL

No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA

(2) Base coarse Compaction SLTR-S-000-3117-001 (S-000-3117-001) As per reference document ITR-1000-005 M W SW

11.5 Road Signage Marking


(1) Road Stop, Sign, Lattering Drawing As per Drawing M W SW

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
Site Inspection and Test Record (ITR) Form

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
INSPECTION AND TEST RECORD (ITR) FORM

NO. ITR FORM NO. REVISION TABLE OF CONTENT SHEET

EARTH WORK
1 ITR-2000-01 C Pre-Concrete Inspection Report 1
2 ITR-2000-02 C Concrete Docket Inspection Report 2
3 ITR-2000-03 C Compression Test Inspection Report 3
4 ITR-2000-04 C Concrete Strength Inspection Report 4
5 ITR-2000-05 C Compaction Inspection Report 5
6 ITR-2000-06 C Paving Inspection Report 6
7 ITR-2000-07 C Excavation Inspection Report 7
8 ITR-2000-08 C Concrete Inspection Report 8
9 ITR-2000-09 C Backfilling Inspection Report 9
10 ITR-2000-10 C Grouting Works Inspection Report 10
11 ITR-2000-11 C Civil Release Notice Inspection Report 11
12 ITR-1000-01 C Sewer Piping and Wrapping Inspection Report 12
13 ITR-1000-04 C Material Receiving Inspection Report 13
14 ITR-1000-05 C Sub-base and Base Coarse Backfilling Inspection Report 14
15 ITR-1000-06 C Road Marking Inspection Report 15

D M S3
-
J20-Jan- 2 0 2
D
ITP SITE - CIVIL

RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-001
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
PRE-CONCRETING INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
work Description :
Sheet :
APPROVAL
NO INSPECTION ITEMS REMARKS
(Sub-Con) JIND MSG

1 SURVEY

2 BASE COMPACTION

3 REBAR WORK :

a. SIZE / TYPE

b. SPACING

c. SPLICING

d. COVERS

4 FORMWORK:

a. DIMENSION

b. ALIGNMENT

c. TIGHTNESS

d. STRENGTH

e. FORM OIL

f. CLEANLINESS

5 CONSTRUCTION: CHIPPING

6 JOINT: CLEANLINESS

7 ANCHOR BOLTS:

a. TYPE

b. SIZE

c. PROJECTION

d. LOCATION

8 PLUMBNESS

9 ELEVATION

10 TOP OF LEAN CONCRETE

11 TOP OF CONCRETE

12 THICKNESS OF CONCRETE

13 OTHERS:

a. CHAMFER

b. EMBEDDED MATERIAL

c. COATING/SURFACE PROJECTION

d. WATER STOP

e. CLEANLINESS

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-002
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
DOCKET CONCRETE INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :

CONCRETE DOCKET DOC NO :


CONCRETE MIX TYPE ORDER NO :

DATE :

TRUCK NO: ORDERED QUANTITY : M3 TOTAL

QUANTITY: M3 / TRUCK

ACCUMULATIVE QTY M3

START MIXING TIME: HR

REMARK: BATCHING PLANT SUPERVISOR

0
SLUMP : mm TEMP. OF CONCRETE: C
0
TEMP. OF AMBIENT: C
INSPECTED BY:
PC-WBS
LOCATION: ARRIVING TIME: HR
EQPT/STRUCT NO/: COMPLETED TIME: HR
STRUCTURE: □ BLINDING CONCRETE □ FOUNDATION □ COLUMN
□ WALL □ BEAM □ SLAB
PLACING METHOD □ PUMP □ CHUTE □ OTHERS
□ TREMIE □ BUCKET
ANY TEST CUBE IS MADE? YES □ NO NUMBER:
TEST CUBE NUMBER IF TAKEN:
SUBCONTRACTOR CONTRACTOR OWNER
NAME NAME NAME
DATE DATE DATE

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-003
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
COMPRESSION TEST INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of To track the Doc
REFERENCES :
Drawing No. : Location :
Revision : Cube ID and FIN
Sheet : NO

CONCRETE MIX TYPE


DATE OF CASTING :
VOLUME (Cu M) :
SLUMP (MM)
:

7 DAYS TEST DATE :


TEST SPECIMENS 1 2 3 AVERAGE
DIMENSION (MM)
LENGTH (MM)
CROSS-SECTIONAL AREA
2
(MM )
MAXIMUM LOAD (KN)
COMPRESSIVE STRENGTH
(Mpa)

SIGNATURE 3rd PARTY CONTRACTOR OWNER

SUBCONTRACTOR INSPECTOR

DATE : DATE : DATE : DATE :


NAME : NAME : NAME : NAME :

28 DAYS TEST DATE :


TEST SPECIMENS 1 2 3 AVERAGE
DIMENSION (MM)
LENGTH (MM)
CROSS-SECTIONAL AREA
2
(MM )
MAXIMUM LOAD (KN)
COMPRESSIVE STRENGTH
(Mpa)
rd
SIGNATURE 3 PARTY CONTRACTOR OWNER
SUBCONTRACTOR INSPECTOR

DATE : DATE : DATE : DATE :


NAME : NAME : NAME : NAME :

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

S3
Print name Date Print name Date Print name Date

- D M
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-004
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
CONCRETE STRENGTH INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :

REC. DATE TIME LOCATION DWG SLUMP STRENGTH REMARKS


NO. Y/N 7 DAYS 28 DAYS

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-005
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
COMPACTION INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :

Pls add the ITR for


core cutting method,
sand replacement
and nuclear density
gauge method for
compaction

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-006
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
PAVING INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
APPROVAL
NO INSPECTION ITEMS REMARKS
(Sub-Con) JIND MSG

1 SURVEY AND LAYOUT

2 BASE COMPACTION

3 POLYETHENE SHEET OVERLAP

4 REINFORCING MESH

a. SIZE

b. SPLICING

5 REBARWORK

a. SIZE

b. SPACING (IF APPLICABLE)

c. SPLICING

d. COVER

6 CONSTRUCTION JOINT

a. SPACING

b. CRACK IND.

c. JOINT FILLER

7 CLEANLINESS

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-007
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

EXCAVATION INSPECTION REPORT


Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
APPROVAL
NO INSPECTION ITEMS REMARKS
(Sub-Con) JIND MSG

1 Setting out survey before excavation

2 Finishing survey

3 Excavation survey

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-008
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

CONCRETE INSPECTION REPORT


Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
APPROVAL
NO INSPECTION ITEMS REMARKS
(Sub-Con) JIND MSG

1 Concrete Curing Properly Done

2 Concrete Surface Check and Patch Up Repair

3 Concrete Coating

4 Approved Materials for Concrete Repair

5 Approved Materials for Concrete Coating

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-009
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

BACKFILLING INSPECTION REPORT


Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
APPROVAL
NO INSPECTION ITEMS REMARKS
(Sub-Con) JIND MSG

1 Approved Backfill Materials

2 Foreign Materials Removed

3 Backfill layer Thickness/Compaction

4 Compaction for Clean Sand

5 Compaction for Marl Mixed Materials

6 Compaction Test (Density) Result

7 Level Survey After Backfilling/Compaction

8 Surface Conditions

9 Previous Layer Field Density Result

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-010
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

GROUTING WORKS INSPECTION REPORT


Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
APPROVAL
NO INSPECTION ITEMS REMARKS
(Sub-Con) JIND MSG

1 Release for Grouting (Mech., Elec.)

2 Approved of Grout Materials

3 Type of Grout (Non-Shrink Epoxy)

4 Concrete Surface Preparation

- Shim Plate Elevation

- Chipping Anchor Bolts Protection, etc.

- Ambient Temperature

- Foundation Temperature

5 Fromwork, Chamfer, Soaking

6 Grout Mixing and Placing

- Mixing Ratio

- Grout Temperature After Mixing

- Cube Test Sample Taken

7 Grout Curing

8 Grouting Acceptance

- Cube Test Result

- Final Inspection, Bonding Test, etc.

- Finishing, no Cracks as per ACI 224R


Chapter 4.4 etc.

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-011
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
CIVIL RELEASE NOTICE INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-1000-001
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
SEWER PIPING AND WRAPPING INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :

INSPECTION REPORT FOR SEWER PIPING


& WRAPPING FORM NO. : 1000-001

DOC NO.:
DSLNG Project REPORT NO. :
0-5151-20
LOCATION : -
ISO DWG No.:
PIT NO: TO
TYPE OF PIPE RCP PIPE CS PIPE
SIZE OF PIPE ∳ ∳

PIPE LENGTH M

CHECK POINT : ELEVATION CENTER LINE BEDDING


DURING PIPE
INSTALLATION SUPPORT DEWATERING

INSPECTED BY BY

SUBCONTRACTOR CONTRACTOR
JOINTING : JOINT SURFACE KEY JOINT/ IF WELD JOINT & PAINTING
ADHESIVE JOINT ATTACH REPORT:

DATE OF INSPECT INSPECTED BY: SUBCONT’R

CONTRACTOR

WRAPPING SURFACE PREPA’N


OVERWRAPPING
APPERENCE VOLTAGE ________
HOLIDAY TEST mV
INSPECTED BY: SUBCONT’R
DATE INSPECTION INSPECTED BY:
STRUCTURAL FILL COMPACTION RESULT CONTRACTOR
BACKFILLING COMPACTION TEST
%

INSPECTED BY: SUBCONT’R


DATE OF INSPECTION INSPECTED BY:

WATER FILLING TEST FROM TO WATER DROP MM


FOR PIPES
INSPECTED BY
SUBCONTRACTOR CONTRACTOR OWNER
WATER FILLING TEST FROM TO WATER DROP MM
FOR PIT

INSPECTED BY
SUBCONTRACTOR CONTRACTOR OWNER
Performed by Witnessed / Reviewed Witnessed / Reviewed

Date: Date: Date:

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-1000-004
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

MATERIAL RECEIVING INSPECTION REPORT


Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
Dimensional Visual
Item PO Number Description Unit Qty Tag No Certificate No
Acc Rej Acc Rej

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-1000-005
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

SUB BASE AND BASE COARSE BACKFILLING INSPECTION REPORT


Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
APPROVAL
NO INSPECTION ITEMS REMARKS
(Sub-Con) JIND MSG

1 Approved Backfill Materials for Sub-base coarse

2 Foreign Materials Removed

3 Sub-base coarse Backfill layer Thickness

4 Sub-base coarse Compaction Test Result

Sub-base coarse Level Survey After


5
Backfilling/Compaction
6 Sub-base coarse Surface Conditions

7 Approved Backfill Materials for Base coarse

8 Foreign Materials Removed

9 Base coarse Backfill layer Thickness

10 Base coarse Compaction Test Result


Base coarse Level Survey After
11
Backfilling/Compaction
12 Base coarse Surface Conditions

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-1000-005
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY

ROAD MARKING INSPECTION REPORT


Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
APPROVAL
NO INSPECTION ITEMS REMARKS
(Sub-Con) JIND MSG

1 Approved Backfill Materials for Sub-base coarse

2 Foreign Materials Removed Title and inspection items is not


meeting
3 Sub-base coarse Backfill layer Thickness

4 Sub-base coarse Compaction Test Result

Sub-base coarse Level Survey After


5
Backfilling/Compaction
6 Sub-base coarse Surface Conditions

7 Approved Backfill Materials for Base coarse

8 Foreign Materials Removed

9 Base coarse Backfill layer Thickness

10 Base coarse Compaction Test Result


Base coarse Level Survey After
11
Backfilling/Compaction
12 Base coarse Surface Conditions

Legend Supporting document attached


LS : Lime Stone
CLY : Clay Silt YES NO
SCLY : Sandy Clay

COMMENT

Prepared by, Witnessed/Reviewed by, Witnessed/Reviewed by,


(sub contractor name) PT. JGC INDONESIA PT. MEDCO SUMBAWA GAS

Print name Date Print name Date Print name Date

D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON

You might also like