S-000-1310-101-Rs-00077 Site Inspection and Test Plan (Itp) For Civil Work
S-000-1310-101-Rs-00077 Site Inspection and Test Plan (Itp) For Civil Work
CLASS [2]
FOR REVIEW
DM02S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD
J-20-Jan-2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY MEDCO SUMBAWA GAS
D
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-1310-101
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 1A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-1310-101
SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORK Page 2 of 6
RECORD OF REVISION
The revision listed below have been incorporated in this copy of the document.
REV PAGE
SECTION DESCRIPTION OF CHANGES
NO NO.
DM02S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD
J-20-Jan-2
PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY MEDCO SUMBAWA GAS.
D
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-1310-101
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 1A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-1310-101
SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORK Page 3 of 6
CONTENTS
1. INTRODUCTION ................................................................................................................... 4
2. PURPOSE AND SCOPE ....................................................................................................... 4
3. DEFINITION AND ABBREVIATION ...................................................................................... 4
4. REFERENCES ...................................................................................................................... 5
5. RESPONSIBILITIES.............................................................................................................. 5
6. INSPECTION INTERVENTION LEVEL ................................................................................. 6
7. ATTACHMENT ...................................................................................................................... 6
DM02S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD
J-20-Jan-2
PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY MEDCO SUMBAWA GAS.
D
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-1310-101
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 1A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-1310-101
SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORK Page 4 of 6
1. INTRODUCTION
PT Amman Mineral Nusa Tenggara (AMNT) plans to build additional combine cycle power generation
plant for their expansion projects including smelter and other new facilities. To provide gas for those
facilities AMNT engaged PT Medco Sumbawa Gas (MSG) to develop and operate a new LNG Terminal
and Regas Facility within AMNT operation area in Benete Bay of Sumbawa Island, West Nusa
Tenggara, Indonesia.
The project includes facilities of onshore LNG storage tank with capacity of 50,000 m3 and 160,000 m3,
regasification unit to produces up to 77 mmscfd gas, an LNG-Carrier jetty with trestle, utilities, buildings
and gas sendout pipelines to the power plant and smelter.
This document covers inspection and test items and its intervention point of each party for each work
category during construction stage at site of Sumbawa LNG Terminal & Regas Facility Project for Earth
Work, Concrete Work, Sewer and Drainage, Road Work .
This Site ITP can be adopted by SUBCONTRACTOR subject to approval by CONTRACTOR. All the check
lists and inspection formats reported herein shall be followed by SUBCONTRACTOR to maintain uniformity
in checklists / formats even when a SUBCONTRACTOR is preparing its own Site ITP based on this
document guidelines.
DM02S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD
J-20-Jan-2
PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY MEDCO SUMBAWA GAS.
D
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-1310-101
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 1A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-1310-101
SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORK Page 5 of 6
4. REFERENCES
SLTR-S-000-3115-001
Construction Specification for Earth Works
(S-000-3115-001)
SLTR-S-000-3116-001
Construction Specification for Sewer and Drainage
(S-000-3116-001)
SLTR-S-000-3117-001
Construction Specification for Road and Paving
(S-000-3117-001)
SLTR-S-000-3120-001
Construction Specification for Concrete Works
(S-000-3120-001)
SLTR-S-000-1520-001
Quality Control Execution Plan
(S-000-1520-001)
SLTR-S-000-1670-001
Quality Control Requirement to Subcontractor
(S-000-1670-001)
5. RESPONSIBILITIES
SUBCONTRACTOR shall be responsible to prepare and submit Inspection & Test Plan (ITP) related to
their scope of work to CONTRACTOR for review and approval prior to commence the construction /
installation work.
CONTRACTOR and COMPANY shall be responsible to review and approve the ITP submitted by
SUBCONTRACTOR.
When required, the SUBCONTRACTOR’s ITP shall be submitted to MIGAS / TPIA by COMPANY for
determination of their witness or hold points on the inspection and test items during construction /
installation at site.
DM02S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD
J-20-Jan-2
PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY MEDCO SUMBAWA GAS.
D
RINTE
ED WHEN P
T ROLL
NCON
COMPANY DOCUMENT NO.
JOB CODE Rev.
SLTR-S-000-1310-101
CONTRACTOR DOCUMENT NO.
0-0831-00-0000 1A
SUMBAWA LNG TERMINAL & REGAS FACILITY S-000-1310-101
SITE INSPECTION AND TEST PLAN (ITP) FOR CIVIL WORK Page 6 of 6
7. ATTACHMENT
(1) Site Inspection and Test (ITP)
DM02S3
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF MEDCO SUMBAWA GAS IN ANY FORM OR MEDIUM TO THIRD
J-20-Jan-2
PARTIES OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
PERMITTED BY MEDCO SUMBAWA GAS.
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT - 1
Site Inspection and Test Plan (ITP)
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA
(3) Gravel for gravel pave SLTR-S-000-3117-001 Max. particle size = 50mm M W R -
(S-000-3117-001)
(2) Compaction (CBR and Density) Not less than 95% of maximum dry ITR-2000-005 M W SW -
density obtained by the modified
proctor test, ASTM D1557
w
(3) Tolerance -
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA
2 CONCRETE WORK
2.1 Material SLTR-S-000-3120-001
(S-000-3120-001)
(1) Cement ASTM C 150 and Type I To be stored as per 6.1.2 Material Certificate M R R - Every Delivery
(2) Aggregate ASTM C33 Maximum size of coarse aggregate Material Certificate M R R - Initially for
for structural concrete shall be trial mix,
20mm, except that fireproofing Every Delivery
concrete that shall be 10mm. for Working
Mix
(3) Mixing water ASTM C94 The total sulphur content of the M R R -
water, expressed as PPM by mass of
sulphate ion shall not exceed 1000.
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA
D M S3 added
-
J20-Jan- 2 0 2
INTE D
Cube sampling/ testing detail to
be added
H EN PR
LED W
TROL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA
Cast-in place concrete (non re- SLTR-D-000-1310-001 Cast against and permanently
stressed) (D-000-1310-001) exposed to earth:
Cast-In-situ bored pile : 100mm
Retaining wall, Anchor block : 75mm
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA
(2.9) Allowable tolerance for installation of re- SLTR-S-000-3120-001 As per reference document M W SW -
bar (S-000-3120-001)
ACI 117
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA
ACI 301
(2) Holes of tie-rods SLTR-S-000-3120-001 As per reference document ITR-2000-008 M W SW -
(S-000-3120-001)
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA
(3) Holiday test (if coated/wrapped) As per reference document and ITR-1000-001 M W SW
drawing
11 ROAD WORK
11.1 Material Receiving
(1) Sub-base course materials, Base course
materials
(1.1) Specification & size, Volume, Quantity SLTR-S-000-3117-001 (S-000-3117-001) As per reference document ITR-1000-004 M W SW
11.2 Excavation
(1.1) Line, Grade, and Elevation SLTR-S-000-3115-001 (S-000-3115-001) and SLTR-S-000-3115-001 (S-000-3115- ITR-2000-007 M W SW
Drawing 001) and Drawing
(2) Finishing survey
(3.1) Width, Length, and Depth SLTR-S-000-3115-001 (S-000-3115-001) and SLTR-S-000-3115-001 (S-000-3115- ITR-2000-007 M W SW
Drawing 001) and Drawing
(2) Sub-base coarse Compaction SLTR-S-000-3117-001 (S-000-3117-001) As per reference document ITR-1000-005 M W SW
D M S3
-
J20-Jan- 2 0 2
INTED
A. Sub base /base coarse -quality testing details to be added
B. Job mix formal to be added, if any ( as per approved drawing )
R
HEN P
ROLLED W
NCONT
SUBCONT.
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
No. DESCRIPTION REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFIED DOCUMENT (RECORD) REMARK
SUBCONT. JEC MEP MIGAS/ TPIA
(2) Base coarse Compaction SLTR-S-000-3117-001 (S-000-3117-001) As per reference document ITR-1000-005 M W SW
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ATTACHMENT-2
Site Inspection and Test Record (ITR) Form
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
INSPECTION AND TEST RECORD (ITR) FORM
EARTH WORK
1 ITR-2000-01 C Pre-Concrete Inspection Report 1
2 ITR-2000-02 C Concrete Docket Inspection Report 2
3 ITR-2000-03 C Compression Test Inspection Report 3
4 ITR-2000-04 C Concrete Strength Inspection Report 4
5 ITR-2000-05 C Compaction Inspection Report 5
6 ITR-2000-06 C Paving Inspection Report 6
7 ITR-2000-07 C Excavation Inspection Report 7
8 ITR-2000-08 C Concrete Inspection Report 8
9 ITR-2000-09 C Backfilling Inspection Report 9
10 ITR-2000-10 C Grouting Works Inspection Report 10
11 ITR-2000-11 C Civil Release Notice Inspection Report 11
12 ITR-1000-01 C Sewer Piping and Wrapping Inspection Report 12
13 ITR-1000-04 C Material Receiving Inspection Report 13
14 ITR-1000-05 C Sub-base and Base Coarse Backfilling Inspection Report 14
15 ITR-1000-06 C Road Marking Inspection Report 15
D M S3
-
J20-Jan- 2 0 2
D
ITP SITE - CIVIL
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-001
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
PRE-CONCRETING INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
work Description :
Sheet :
APPROVAL
NO INSPECTION ITEMS REMARKS
(Sub-Con) JIND MSG
1 SURVEY
2 BASE COMPACTION
3 REBAR WORK :
a. SIZE / TYPE
b. SPACING
c. SPLICING
d. COVERS
4 FORMWORK:
a. DIMENSION
b. ALIGNMENT
c. TIGHTNESS
d. STRENGTH
e. FORM OIL
f. CLEANLINESS
5 CONSTRUCTION: CHIPPING
6 JOINT: CLEANLINESS
7 ANCHOR BOLTS:
a. TYPE
b. SIZE
c. PROJECTION
d. LOCATION
8 PLUMBNESS
9 ELEVATION
11 TOP OF CONCRETE
12 THICKNESS OF CONCRETE
13 OTHERS:
a. CHAMFER
b. EMBEDDED MATERIAL
c. COATING/SURFACE PROJECTION
d. WATER STOP
e. CLEANLINESS
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-002
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
DOCKET CONCRETE INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
DATE :
QUANTITY: M3 / TRUCK
ACCUMULATIVE QTY M3
0
SLUMP : mm TEMP. OF CONCRETE: C
0
TEMP. OF AMBIENT: C
INSPECTED BY:
PC-WBS
LOCATION: ARRIVING TIME: HR
EQPT/STRUCT NO/: COMPLETED TIME: HR
STRUCTURE: □ BLINDING CONCRETE □ FOUNDATION □ COLUMN
□ WALL □ BEAM □ SLAB
PLACING METHOD □ PUMP □ CHUTE □ OTHERS
□ TREMIE □ BUCKET
ANY TEST CUBE IS MADE? YES □ NO NUMBER:
TEST CUBE NUMBER IF TAKEN:
SUBCONTRACTOR CONTRACTOR OWNER
NAME NAME NAME
DATE DATE DATE
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-003
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
COMPRESSION TEST INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of To track the Doc
REFERENCES :
Drawing No. : Location :
Revision : Cube ID and FIN
Sheet : NO
SUBCONTRACTOR INSPECTOR
COMMENT
S3
Print name Date Print name Date Print name Date
- D M
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-004
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
CONCRETE STRENGTH INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-005
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
COMPACTION INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-006
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
PAVING INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
APPROVAL
NO INSPECTION ITEMS REMARKS
(Sub-Con) JIND MSG
2 BASE COMPACTION
4 REINFORCING MESH
a. SIZE
b. SPLICING
5 REBARWORK
a. SIZE
c. SPLICING
d. COVER
6 CONSTRUCTION JOINT
a. SPACING
b. CRACK IND.
c. JOINT FILLER
7 CLEANLINESS
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-007
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
2 Finishing survey
3 Excavation survey
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-008
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
3 Concrete Coating
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-009
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
8 Surface Conditions
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-010
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
- Ambient Temperature
- Foundation Temperature
- Mixing Ratio
7 Grout Curing
8 Grouting Acceptance
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-2000-011
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
CIVIL RELEASE NOTICE INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-1000-001
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
SEWER PIPING AND WRAPPING INSPECTION REPORT
Project Title : Sumbawa LNG Terminal & Regas Project
Job Code : 0-0831-00-0000
Company : PT. Medco Sumbawa Gas Date : MM/DD/YY
Contractor : PT. JGC Indonesia Report No. : (by subcontractor)
Sub-Contractor : Page : of
REFERENCES :
Drawing No. : Location :
Revision :
Sheet :
DOC NO.:
DSLNG Project REPORT NO. :
0-5151-20
LOCATION : -
ISO DWG No.:
PIT NO: TO
TYPE OF PIPE RCP PIPE CS PIPE
SIZE OF PIPE ∳ ∳
PIPE LENGTH M
INSPECTED BY BY
SUBCONTRACTOR CONTRACTOR
JOINTING : JOINT SURFACE KEY JOINT/ IF WELD JOINT & PAINTING
ADHESIVE JOINT ATTACH REPORT:
CONTRACTOR
INSPECTED BY
SUBCONTRACTOR CONTRACTOR OWNER
Performed by Witnessed / Reviewed Witnessed / Reviewed
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-1000-004
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-1000-005
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON
ITR-1000-005
SUBCONT. Rev C
LOGO
SUMBAWA LNG TERMINAL & REGAS FACILITY
COMMENT
D M S3
-
J20-Jan- 2 0 2
D
RINTE
ED WHEN P
T ROLL
NCON