SITE TESTING Page 1 of 2
SCHEDULE Revision 2

SITE TESTING SCHEDULE – Primary Injection Comparison Tests (HV Ref)


Client: Site:
Client Ref:
Client Rep:
Circuit: Contract Number:
Test Engineer: Date Tested:

Panel

Protection

Relay Type

CT Ratio

WARNING
The use of equipment out of calibration is strictly prohibited. Prior to the commencement of any
activity on this STS, confirm that all equipment requiring calibration carries a current calibration label.

BALANCE TESTS

PHASES PRIMARY SECONDARY CURRENT, monitored at:


INJECTE AMPS CONNS PROT RP
D Relay HV REF Display
R-N
Y-N
B-N

Kirby 2019 TS.056 HV REF Primary Injection Primary


TS No. 056
SITE TESTING Page 2 of 2
SCHEDULE Revision 2

UNBALANCE TESTS

PHASES PRIMARY SECONDARY CURRENT, monitored at:


INJECTE AMPS CONNS PROT RP
D
Relay HV REF Display

R-N
reverse
Y-N
reverse
B-N
reverse

REMARKS & TEST EQUIPMENT USED (Include Asset/Plant No’s.)

SIGNED ____________________ FOR KIRBY DATE ____________________

____________________ FOR CLIENT DATE ____________________

Kirby 2019 TS.056 HV REF Primary Injection Primary