The document lists the floor areas of various sections of walls on the 1st and 2nd floors of a building. For the 1st floor, it provides the dimensions and calculated areas of 17 wall sections totaling 359.8 sqm. It states the total brick requirement is 8280-8300 bricks. For the 2nd floor, it provides the dimensions and areas of 16 wall sections totaling 264.59-265 sqm. The total brick requirement for the 2nd floor is listed as 6095-6100 bricks.
The document lists the floor areas of various sections of walls on the 1st and 2nd floors of a building. For the 1st floor, it provides the dimensions and calculated areas of 17 wall sections totaling 359.8 sqm. It states the total brick requirement is 8280-8300 bricks. For the 2nd floor, it provides the dimensions and areas of 16 wall sections totaling 264.59-265 sqm. The total brick requirement for the 2nd floor is listed as 6095-6100 bricks.
The document lists the floor areas of various sections of walls on the 1st and 2nd floors of a building. For the 1st floor, it provides the dimensions and calculated areas of 17 wall sections totaling 359.8 sqm. It states the total brick requirement is 8280-8300 bricks. For the 2nd floor, it provides the dimensions and areas of 16 wall sections totaling 264.59-265 sqm. The total brick requirement for the 2nd floor is listed as 6095-6100 bricks.
AS 1 B-C = 3,595 m x 3,55 m = 12,76 m² AS 7 A-B = 5,7 m x 3,55 m = 20,235 m² AS 7 B-C = 3,595 m x 3,55 m = 12,76 m² AS A 1-2 = 4,7 m x 3,55 m = 16,685 - 1,935 – 3,72 = 11,03 m² ( Pintu = 2,15 x 0,9 = 1,935 m² ) ( Jendela = 1,55 x 1,2 = 1,86 m² x 2 = 3,72 m² ) AS A 2-3 = 4,7 m x 3,55 m = 16,685 - 1,935 – 3,72 = 11,03 m² ( Pintu = 2,15 x 0,9 = 1,935 m² ) ( Jendela = 1,55 x 1,2 = 1,86 m² x 2 = 3,72 m² ) AS A 3-4 = 1,8 m x 3,55 m = 6,39 + 2,75 = 9,14 – 1,935 = 7,205 m² ( 0,775 m x 3,55 m = 2,75 m²) AS A 4-5 = 2,775 m x 3,55 m = 9,85 + 4,199 + 1,56 =16,61 – 7,2= 9,41 m² (1,183 m x 3,55 m = 4,199 m²) (0,442 m x 3,55 m = 1,56 m ²) (Boven = 0,6 x 0,6 = 3,6 m²) AS A 5-6 = 2,775 m x 3,55 m = 9,85 + 4,199 + 1,56 =16,61 - 7,2 - 3,72= 5,69 m² (1,183 m x 3,55 m = 4,199 m²) (0,442 m x 3,55 m = 1,56 m ²) (Boven = 0,6 x 0,6 = 3,6 m² x 2 = 7,2 m²) (Jendela = 1,55 x 1,2 = 1,86 m² x 2 = 3,72 m² ) AS A 6-7 = 4,7 m x 3,55 m = 16,685 m² - 3,73 m² – 1,935 m²= 11,02 m² (Jendela = 1,55 x 1,2 = 1,86 m² x 2 = 3,72 m² ) ( Pintu = 2,15 x 0,9 = 1,935 m² ) AS A-B 3-4 = 4,75 m x 3,55 m = 16,86 m² AS A-B 4-5-6 1,45 m x 3,55 m = 5,15 m² 3,43 m x 3,55 m = 12,18 m² 1,183 m x 3,55 m x 3 = 12,6 m² - (0,72 x 2,15 x 3) = 7,94 m² 1,775 m x 3,55 m x 2 = 12,6 m² 4,325 m x 3,55 m = 15,35 m² 1,45 m x 3,55 m = 5,15 m² Total = 58,99 m² AS C 1-2 = 4,62 m x 3,55 m = 16,4 - 3,72 - 1,935 = 10,75 m² (Jendela = 1,55 x 1,2 = 1,86 m² x 2 = 3,72 m² ) ( Pintu = 2,15 x 0,9 = 1,935 m² ) AS C 2-3 = 4,75 m x 3,55 m = 16,86 – 3,72 = 13,14 m² (Jendela = 1,55 x 1,2 = 1,86 m² x 2 = 3,72 m² ) AS C 2-3 = 4,75 m x 3,55 m = 16,86 – 3,72 = 13,14 m² AS C 3-4 = 1,825 m x3,55 m=6,5 m²+1,33 m²=7,83 m²-1,935 m²=5,9 m² ( Pintu = 2,15 x 0,9 = 1,935 m² ) AS C 4-5= 4,325 m x 3,55 m = 15,36 m² -1,935 m² - 1,86 m² =11,565 m² ( Pintu = 2,15 x 0,9 = 1,935 m² ) ( Jendela = 1,55 x 1,2 = 1,86 m²) AS C 5-6 = 4,75 m x 3,55 m = 15,36 m² - 1,86 m² = 13,5 m² ( Jendela = 1,55 x 1,2 = 1,86 m²) AS C 6-7 = 4,75 m x 3,55 m = 15,36 m² - 1,86 m² = 13,5 m² ( Jendela = 1,55 x 1,2 = 1,86 m²) TOTAL LUASAN DINDING BATAKO = =20,235 m² + 12,76 m² + 20,235 m² + 12,76 m² + 11,03 m² + 7,205 m² + 9,41 m² + 5,6 9 m² + 11,02 m² + 16,86 m² + 58,99 m² + 10,75 m² + 13,14 m² + 13,14 m² + 11,565 m² + 13,5 m² + 13,5 m² = 359,8 ~ 360 m² TOTAL KEBUTUHAN BATAKO =360 m² x 23 buah = 8280 buah ~ 8300 buah
LUASAN DINDING BATAKO LANTAI 2
AS 1 A-B = 5,725 m x 3,55 m = 20,32 m²
AS 1 B-C = 3,9 m x 3,55 m = 13,845 m²
AS 7 A-B = 5,725 m x 3,55 m = 20,32 m²
AS 7 B-C = 3,9 m x 3,55 m = 13,845 m² - 3,6 m² = 10,245 m²
(Boven = 0,6 x 0,6 = 3,6 m²)
AS A 1-2 = 4,992 m x 3,55 m = 17,73 m² - 3,72 m² = 14,01 m² (Jendela = 1,55 x 1,2 = 1,86 m² x 2 = 3,72 m² ) AS A 2-3 = 4,992 m x 3,55 m = 17,73 m² - 1,86 m² = 15,87 m² (Jendela = 1,55 x 1,2 = 1,86 m² ) AS A 3-4 = 4,992 m x 3,55 m = 17,73 m² - 1,86 m² = 15,87 m² (Jendela = 1,55 x 1,2 = 1,86 m² ) AS A 4-5 = 4,992 m x 3,55 m = 17,73 m² - 1,86 m² = 15,87 m² (Jendela = 1,55 x 1,2 = 1,86 m² ) AS A 5-6 = 4,992 m x 3,55 m = 17,73 m² - 1,86 m² = 15,87 m² (Jendela = 1,55 x 1,2 = 1,86 m² ) AS A 6-7 = 4,992 m x 3,55 m = 17,73 m² - 3,72 m² = 14,01 m² (Jendela = 1,55 x 1,2 = 1,86 m² x 2 = 3,72 m² ) AS C 1-2 = 4,992 m x 3,55 m = 17,73 m² - 3,72 m² = 14,01 m² (Jendela = 1,55 x 1,2 = 1,86 m² x 2 = 3,72 m² ) AS C 2-3 = 4,992 m x 3,55 m = 17,73 m² - 1,86 m² = 15,87 m² (Jendela = 1,55 x 1,2 = 1,86 m² )
AS C 3-4 = 3,925 m x 3,55 m = 13,93 m² - 1,86 m² = 12,07 m²
(Jendela = 1,55 x 1,2 = 1,86 m² ) AS C 4-5 = 1,95 m x 3,55 m = 6,93 m² AS C 5-6 = 4,992 m x 3,55 m = 17,73 m² - 3,72 m² = 14,01 m² (Jendela = 1,55 x 1,2 = 1,86 m² x 2 = 3,72 m² ) AS C 6-7 = 4,992 m x 3,55 m = 17,73 m² - 3,72 m² = 14,01 m² - 10,8 m² = 3,21 m² (Boven = 0,6 x 0,6 = 3,6 m² x 3 = 10,8 m²) AS B-C 6-7 = 14,2 + 3,195 + 3,73 + 6,93 + 9,05 + 5,15 = 42,26 m² = 4 m x 3,55 m = 14,2 m² = 0,9 m x 3,55 m = 3,195 m² = 1,05 m x 3,55 m = 3,73 m² = 1,95 m x 3,55 m = 6,93 m² = 0,85 m x 3,55 m x 3 = 9,05 m² = 1,45 m x 3,55 m x 2 = 5,15 m² TOTAL LUASAN DINDING BATAKO = 20,32 m² + 13,845 m² + 20,32 m² + 10,245 m² + 14,01 m² + 15,87 m² + 15,87 m² + 15,87 m² + 15,87 m² + 14,01 m² + 14,01 m² + 15,87 m² + 12,07 m² + 6,93 m² + 14,01 m² + 3,21 m² + 42,26 m² = 264, 59 ~ 265 x 11 buah TOTAL KEBUTUHAN BATAKO = 265 m² x 23 buah / m² = 6095 ~ 6100 buah