SUBJECT:ESTIMATED COST
DATE: July 17,2021
Item
No. DESCRIPTION QTY. UNIT UNIT COST AMOUNT
1 Supply Labor and materials for fabrication 1 l.s. 6,000.00 6,000.00
installation and Painting of Partition Wall
Prepared by:
Engr. Robert R. Tiin
Electrical Engineer
Conformed by:
1
COST ESTIMATES: Two Storey Bldg.
Item
No. DESCRIPTION QTY. UNIT UNIT COST AMOUNT
1 Supply Labor and materials for fabrication 1 l.s.
installation and Painting of Partition Wall
2
EARTHWORKS
Excavation
L W D V QTY
12
C1F1 1 1 1 1 12 PCS 12
30
WF1 55 0.4 1 22 1 PCS 22
WF2 20 0.4 1 8 1 PCS 8
BACK FILLING 74
L W D V QTY
12
C1F1 1 1 1 1 12 PCS 12
32
WF1 55 0.4 1 22 1 PCS 22
WF2 25 0.4 1 10 1 PCS 10
FLOORING 12 10 0.25 30 30
L W D V QTY
Concrete Works
Foundation
L W D V QTY 9.34
3.5
F1 1 1 0.25 0.25 14 PCS 3.5
5.84
WF1 53 0.4 0.2 4.24 1 PCS 4.24
WF2 20 0.4 0.2 1.6 1 PCS 1.6
L W D V QTY 5.832
C1 5.4 0.3 0.3 0.486 12 PCS 5.832
Beam 1
Rbeam
L W D V QTY 6.4
rb101 80 0.2 0.4 6.4 1 PCS 6.4
reinforced bars
Foundation
L W Total Qty. No. of
Length Bars
32.0
F1 1 16 16 12 32.0 PCS
Column
48.0
c1 4 6 24 12 48.0
stirrup 1 1.2 1.2 180 36.0 36
beams
L W Total Qty. No. of
Length Bars
wall 442
10 7 70
30 7 210
45 3.6 162
internal 70 1 70
#12
#10
#10
#16x8
#10
#16
#10