Date: 07.12.2021
1. Current Activities
- Continue installation work of secondary cable tray & conduits in unit no [1020].
- Continue cable pulling & dressing in main/Secondary cable tray route of pipe rack no. [1501 &1040].
- Continue modification work of LCS & safety switches locations in units no. [3130 & 8310].
- Preparing to start installation of neutral & line terminal boxes of the Generator no. 8851GM01 in unit no. [1020].
- Preparing to start installation work of lightning system of Cooling Tower.
2. Upcoming Activities
3. Area of concern
- Missing terminal lugs different sizes for a lot of safety switches & motors [ supplied by Petrojet].