Design Requirement Clarification

Item
Description Comparison
No.
From doc. no.:
From dwg. no.:
Contradict instruction to place calibration pot for pump. EMAS-EPCC-EXE-CHRM-66-STA-SPN-1010
1. EMAS-EPCC-EXE-CHRM-66-PRO-PID-1214-004
Please advise which instruction is obsoleted. Specification Chemical Injection Package (Scope 1)
Piping & Instrument Diagram, DAF Chemical - 1, Rev.2
Attachment 1 - Scope of Supply

Even though the Tank is by others but P&ID presentation


2.
need to reflect the requirement.
Please advise which instruction is obsoleted.

The latest P&ID (from client) shows that no spare nozzles


are required.
From dwg. no.:
SH to clarify on the usage of SS tubing for line connection
3. SH plan to use tubing connection for line connection of pump skid. EMAS-EPCC-EXE-CHRM-66-PRO-PID-1219-005
with size 1" and above.
Piping & Instrument Diagram, MOS Chemical Dosing, Rev.2
The latest P&ID (from client) shows that for line connection
with size 1" and above, they are suggesting to use piping
instead of tubing.

From dwg. no.:


Some of the calibration connection is having size bigger than
4. EMAS-EPCC-EXE-CHRM-66-PRO-PID-1214-005
main pump connection.
Piping & Instrument Diagram, DAF Chemical - 2, Rev.2
May need piping advise on this matter.