Sr No Checkpoint
1 2 3 4

1 Check Standard bin used for Mechanical housing

2 Check all bins should be free from dust

3 Check polythene used as per packing standard

4 Check rubber packing done as per packing standard

5 Check inner box used as per packing standard

6 Check outer box used as per packing standard

7 Check trolley available for mirror plate storage.

8 Trolley should not be damage

9 All bins should be ok ,Not in damage condition.

10 Check no material lying on shop floor

11 Rejected material kept in red bin .

12 All material kept at defined location.

13 Check Handgloves used for mirror plate handling

Operator- Daily
Supervisior- Weekly
QA Inspector- Foutnightly
Material Handling Checksheet-Assembly
Date
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
20 21 22 23 24 25 26 27 28 29 30 31
Mate

Sr No Checkpoint
1 2 3 4

1 Check required trolley,Bins available on line

2 Check partition bin used for mirror plate storage

3 Check trolley available for mirror plate storage.

4 Trolley should not be damage

5 All bins should be ok ,Not in damage condition.

6 Check no material lying on shop floor

7 All material kept at defined location.

8 Rejected material kept in red bin .

9 Check Handgloves used for mirror plate handling

10

11

12

13

Operator- Daily
Supervisior- Weekly
QA Inspector- Foutnightly
Material Handling Checksheet-Mirror Plate
Date
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
20 21 22 23 24 25 26 27 28 29 30 31