1. The document appears to be a report detailing road marking work done on the G Harda Temagaon Project, listing various dates, locations, types of markings installed, and quantities of materials used.
2. Information provided includes the working chainage, type of site, type of mark installed, size and number of patterns, length of markings, number of arrows, bars, stop lines, and other items installed, and total area covered.
3. Locations and details are listed from chainage 2450 to chainage 19000, with various markings like chevrons, center lines, and overlapping damage areas indicated.
1. The document appears to be a report detailing road marking work done on the G Harda Temagaon Project, listing various dates, locations, types of markings installed, and quantities of materials used.
2. Information provided includes the working chainage, type of site, type of mark installed, size and number of patterns, length of markings, number of arrows, bars, stop lines, and other items installed, and total area covered.
3. Locations and details are listed from chainage 2450 to chainage 19000, with various markings like chevrons, center lines, and overlapping damage areas indicated.
1. The document appears to be a report detailing road marking work done on the G Harda Temagaon Project, listing various dates, locations, types of markings installed, and quantities of materials used.
2. Information provided includes the working chainage, type of site, type of mark installed, size and number of patterns, length of markings, number of arrows, bars, stop lines, and other items installed, and total area covered.
3. Locations and details are listed from chainage 2450 to chainage 19000, with various markings like chevrons, center lines, and overlapping damage areas indicated.
Date Center Median q block Working Chainage r Marking Marking Marking Line Mark n Type Of +Traingl Total Qty Date Site Length Median Length Nos. Nos. Nos. Nos. Nos. Mark Size of Nos.of in Sqm. Date From To Mark Patte 0.100 0.150 0.150 - - -
10/Sep/23 27247 LHS C 3X3 5 15 1.5 OVER LAP DEMEGE
10/Sep/23 27247 RHS C 3X3 5 15 1.5 OVER LAP DEMEGE
G HARDA TEMAGAON PROJECT Shoulde Zebra Arrow Bar Stop Stop Chevro Checure Date Center Median q block Working Chainage r Marking Marking Marking Line Mark n Type Of +Traingl Total Qty Date Site Length Median Length Nos. Nos. Nos. Nos. Nos. Mark Size of Nos.of in Sqm. Date From To Mark Patte 0.100 0.150 0.150 - - -
10/Sep/23 23200 LHS C 3X3 5 15 1.5 OVER LAP DEMEGE
10/Sep/23 23200 RHS C 3X3 5 15 1.5 OVER LAP DEMEGE
10/Sep/23 22000 RHS C 3X3 1 3 0.3 OVER LAP DEMEGE
10/Sep/23 21600 LHS C 3X3 3 9 0.9 OVER LAP DEMEGE
10/Sep/23 18900 19000 LHS S 100 15 OVER LAP DEMEGE