SEVERITY: 1 – Slightly Harmful, 2 – Harmful, 3 – Extremely Harmful; LIKELIHOOD: 1 – Unlikely, 2 – Likely, 3 – Very Likely; RISK LEVEL: 1 – Trivial, 2 – Low, 2 to 4 – Medium, 4
to 6 – High, Above 6 – Extremely High.
Risk
Residual Risk
Evaluation
Likelihood
Likelihood
Risk Level
Risk Level
Sr. No. Activity Hazard Effect / Harm Control Measures Monitoring Mechanism
Severity
Severity
1.Entrapment due 1. Operator trained to
to fall/ roll of pipe. Personnel injury, loss of 3 3 9 the Approved CPCS 1 3 L Safety personnel
assets, health impact, surveillance, giving
2. Operators body injury. (Construction Plant first aid, & proper
direct field of Competence toolbox talk.
vision obscured by Scheme) standard as Induction training.
load leading to per the
Laying of Pipes
1.
contact with other 2. Construction
3.persons or plant. Regulations.
4.Failure of lifting 3. Vehicles should
equipment. never be overloaded.
5.Inadequate Loads should be
supervision. equally distributed,
6.Untrained secured and not
Operatives protruding, tilting
7.Use of mobile beyond the sides or
phones by back of the vehicle.
operators. 4. Reverse beeper,
8.Displacement of flashing beacon,
SEVERITY: 1 – Slightly Harmful, 2 – Harmful, 3 – Extremely Harmful; LIKELIHOOD: 1 – Unlikely, 2 – Likely, 3 – Very Likely; RISK LEVEL: 1 – Trivial, 2 – Low, 2 to 4 – Medium, 4
to 6 – High, Above 6 – Extremely High.
SEVERITY: 1 – Slightly Harmful, 2 – Harmful, 3 – Extremely Harmful; LIKELIHOOD: 1 – Unlikely, 2 – Likely, 3 – Very Likely; RISK LEVEL: 1 – Trivial, 2 – Low, 2 to 4 – Medium, 4
to 6 – High, Above 6 – Extremely High.
Machine.
10. Groundworkers to
wear Hi-Visibility
Vests at all times and
Hard-Hats.
11. Warning signs will
be erected to alert
pedestrians of
Unloading/Loading
Operations.
12. Traffic
management must
be in the place
where
loading/unloading is
being carried out on
public roads.
13. Loads to be tipped
only on suitably level
ground to prevent
overturning of skip