Common NOC Report

Transaction Registry: 11-20211169912-01-3-04-00-104

Project Number: D-107604_(Zone 4-R1)

Plot Number: Abu Dhabi - AL KHATIM - DHAHARAT AL TAYEB - -

Generated By: Contractor/Nawas MK LNT ECC Division

Generated date: 18 - 10 - 2021 02:46:43 PM

Owner Name: Abu Dhabi Distribution Company

Permit Category: Utility and Infrastructure Lines Approvals

Permit Type: Utilities Underground Cables or Pipelines

Permit Sub type: Treated-Water Trunk Line

Project Stage: Construction

Construction Phase: Phase 4

Submission Date: 16 - 02 - 2021 10:47:35 AM

NOC Reply Summary


Role System Default Transaction Focal Point Reply
Distribution Coordinator
Intervention
Description

Default NOC 20 20 20
NOC Without Conditions 2
NOC With Conditions 10
Conditions to Issue NOC

Objection

In Progress 12 12

Page Number: 1 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


Municipal approval replies

ADM
Aaehsa Abdulrahman Jasem
2. Conditions for Approval 3/18/21 3:13 PM 11-20211169912-01-3-04-00
Conditions Subject to Requester Approval

Remaining required NOC(s) must be


completed (see NOC detailed report)

Issuing Entities Focal NOC Replies

System Default Focal Point


Entity Name Focal Point NOC Reply Reply Date
Action Action

3/11/21 4:23
PM
Abu Dhabi For Action
ADDC Assets FP For Action
Distribution
Supervisor
Company B) NOC with
Conditions
3/17/21 3:40
PM
For Action
Municipality of Abu ADM City Center For Action
Dhabi City FP
B) NOC with
Conditions
3/15/21 9:27
PM
Abu Dhabi National For Action
Oil Company ADNOC HQ FP For Action
(ADNOC) B) NOC with
Conditions
3/18/21 10:46
AM
Abu Dhabi For Action
ADSSC Sewerage For Action
Sewerage Services
AD FP
Company B) NOC with
Conditions
3/10/21 10:51
AM
Department of DCT Culture and For Action
Culture and Tourism Tourism FP - AD For Action
- Abu Dhabi and WR A) NOC with No
Conditions

Page Number: 2 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


System Default Focal Point
Entity Name Focal Point NOC Reply Reply Date
Action Action

3/10/21 1:44
PM
Emirates Integrated For Action
Telecommunication Du Telecom FP For Action
Company - Du B) NOC with
Conditions
3/14/21 6:04
Emirates PM
For Action
Telecommunication Etisalat Telecom For Action
Corporation - FP - Abu Dhabi
Etisalat B) NOC with
Conditions
4/13/21 9:27
AM
UAE Armed Forces GHQ Military For Action
General Works and For Action
Headquarters Telecom FP B) NOC with
Conditions
3/11/21 2:44
PM
For Action
Integrated Transport ITC Right-of-Way For Action
Centre FP - AD
B) NOC with
Conditions
3/10/21 10:46
AM
For Action
Monitoring and MCC Monitor and For Action
Control Center Control FP
B) NOC with
Conditions
3/11/21 12:11
PM
Abu Dhabi Transco For Action
Transmission and Infrastructure For Action
Despatch Company Services FP B) NOC with
Conditions
3/10/21 9:45
ZonesCorp AM
Higher Corporation For Action
Industrial Customer For Action
for Specialized
Services FP
Economic Zones A) NOC with No
Supervisor
Conditions

Not for Action


General Directorate AD Police Telecom Not for Action
of Abu Dhabi Police FP
Default NOC

Not for Action


General Directorate AD Police Traffic Not for Action
of Abu Dhabi Police Safety FP
Default NOC

Page Number: 3 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


System Default Focal Point
Entity Name Focal Point NOC Reply Reply Date
Action Action

Not for Action


Abu Dhabi Ports AD Ports FP Not for Action

Default NOC

Not for Action


AD Ports Marine Not for Action
Abu Dhabi Ports
FP
Default NOC

ADAC Air Not for Action


Abu Dhabi Airports Not for Action
Navigation
Company
Services FP Default NOC

Abu Dhabi Not for Action


ADDC Customer Not for Action
Distribution
Services FP
Company Default NOC

Abu Dhabi Not for Action


ADDC Plot-Related Not for Action
Distribution
FP - Electrical
Company Default NOC

Abu Dhabi Not for Action


ADDC Plot-Related Not for Action
Distribution
FP - Water
Company Default NOC

Not for Action


Municipality of Abu ADM Services Not for Action
Dhabi City Corridor FP
Default NOC

Not for Action


Municipality of Abu Not for Action
ADM Traffic FP
Dhabi City
Default NOC

Not for Action


Abu Dhabi Maritime Not for Action
Abu Dhabi Maritime
FP
Default NOC

Page Number: 4 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


System Default Focal Point
Entity Name Focal Point NOC Reply Reply Date
Action Action

Not for Action


Dolphin Energy Not for Action
Dolphin Energy FP
Limited
Default NOC

Not for Action


Environment Agency Not for Action
EAD FP
- Abu Dhabi
Default NOC

Not for Action


Emirates Nuclear Not for Action
ENEC FP
Energy Corporation
Default NOC

Not for Action


Etihad Rail Etihad Rail FP Not for Action

Default NOC

Emirates Not for Action


Etisalat Telecom
Telecommunication Not for Action
FP - Western
Corporation -
Region Default NOC
Etisalat

Kizad Industrial Not for Action


Khalifa Industrial Not for Action
Customer Service
Zones Abu Dhabi
FP Default NOC

Not for Action


Abu Dhabi National TAQA Generation Not for Action
Energy Company FP
Default NOC

National Central Not for Action


Tabreed Cooling Not for Action
Cooling Company
FP
PJSC Default NOC

Abu Dhabi Transco Plot- Not for Action


Transmission and Related Services Not for Action
Despatch Company FP Default NOC

Page Number: 5 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


Page Number: 6 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:
Transaction History

User Name Workflow Step Reply Reply Date Solution Role

Initiate request and define


Nawas MK LNT ECC Division Request Submitted 16 - 02 - 2021 11:13:20 Contractor
data

ADDC Projects
Review and authorize
Saeed Awadh Al Menhali Claim 17 - 02 - 2021 12:49:15 Representative -
request
Water

ADDC Projects
Review and authorize Requester Authorized By
Saeed Awadh Al Menhali 17 - 02 - 2021 12:49:50 Representative -
request Requesting Entity
Water

Submit transaction after


Nawas MK LNT ECC Division working on authorized Request Submitted 04 - 03 - 2021 13:45:44 Contractor
data

ADM TP Infrastructure
Aaehsa Abdulrahman Jasem Review request and
Claim 09 - 03 - 2021 15:09:23 Permitting Eng -
Alnuaimi perform further analysis
Utilities - Area3

Initiating NOC
ADM TP Infrastructure
Aaehsa Abdulrahman Jasem Review request and Transaction by the
09 - 03 - 2021 15:09:40 Permitting Eng -
Alnuaimi perform further analysis Permitting Body Project
Utilities - Area3
Representative

Applicant Reissue For


Nawas MK LNT ECC Division 11 - 03 - 2021 12:52:08 Contractor
Information Transaction

Applicant Reissue For


Nawas MK LNT ECC Division 17 - 03 - 2021 09:58:32 Contractor
Information Transaction

ADM TP Infrastructure
Aaehsa Abdulrahman Jasem View request and replies
Claim 18 - 03 - 2021 15:12:08 Permitting Eng -
Alnuaimi of Focal Points
Utilities - Area3

Conditions Sent From


ADM TP Infrastructure
Aaehsa Abdulrahman Jasem View request and replies Permitting Body Project
18 - 03 - 2021 15:13:39 Permitting Eng -
Alnuaimi of Focal Points Representative to
Utilities - Area3
Applicant for Approval or

Review conditions entered


Applicant Reissue For
Nawas MK LNT ECC Division by Permitting body project 12 - 04 - 2021 10:35:40 Contractor
Action Transaction
representative

Page Number: 7 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


Transaction Details
Administrative Information

Contact Person Information

First Name Middle Name Third Name


Nawas MK LNT
Family Name
ECC Division

Emirate Phone Number Email


0558429314 nawasmk@lntecc.com

Organization Information

Organization Organization Name Organization Phone


CN-1001544 Larsen & Toubro 037670225

Department

Requester Information (Project Owner)


Owner Type Email
Entity customerservice@addc.ae

Entity Name Phone Number


Abu Dhabi Distribution Company +971 2 416 6000

Organization Contact
Saeed Awadh

Comments

Contractor Information
License Number /

Name Phone Number Email

Page Number: 8 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


Attachments

Entity Name User Name Workflow Step Attachment Attachment Date

AD-All larsen.toubro Initiate request and Administrative (1) - Emirates ID Copy 16 - 02 - 2021
define data General

AD-All larsen.toubro Initiate request and Administrative (1) - Commercial 16 - 02 - 2021


define data General Registration Copy

AD-All larsen.toubro Initiate request and Administrative (1) - Power of Attorney 16 - 02 - 2021
define data General

Page Number: 9 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


Basic Transaction Information

Transaction Nature
New Project

Permit Category Permit Type Project Stage


Utility and Infrastructure Lines Approvals Utilities Underground Cables or Pipelines Construction

Construction Phase
Permit Sub type
Treated-Water Trunk Line Phase 4

Expedited

Muncipality Name District Name Community Name Road Name Plot Number

ADM AL KHATIM DHAHARAT AL

Project Information

Project Number Project ID


D-107604_(Zone 4-R1) 156835

Project Name
D-107604 ADDC Al ain TSE Project Package-B(Z4R1)

Project Description

Construction of Recycle Water Pipelines from Main Pump Station to Intermediate Pump Station-Package B

Project Start Date Closure Date

06 - 02 - 2020 20 - 09 - 2021

Transaction Data

Date Owner Corresponding Number


16 - Feb - 2021

Municipal Corresponding Number

Page Number: 10 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


Authorization
Authorization entity Authorizing project representative name
ADDC Saeed Awadh Al Menhali

Granted on
2/17/21 12:49 PM

Additional Transaction Information

Transaction Specific Information


Purpose/Activity Abnormal Load (tons) Install/Move Parking Machines/Signs
0 ● No ○ Yes
Typology (Building Usage) No. of Personal NDRC
0 ● No ○ Yes
Typology (Crane) No. of Blocks Distance (from Plot)
0 10
Typology (Land Usage) No. of Cranes Length of Network (km)
0
Typology (Onshore Projects) Period (days) No. of Floors
0 0
Typology (Public Realm) Event Period (days) Date Of Completion Certificate
0
Typology (Urban Road) Population (capita) Guarantee Period (months)
0 1
Typology (Utility) Surface Area (square meters) Partial Demolition
0 0
Voltage (kV) Master Plan
Developement Type
0
Land Allocation Navigation Capacity (dwt)
Allocation 0
Date of Event Noise Absorbtion Parameter
0
Diameter (meters) Include Removal of Towers
1 ● No ○ Yes
Estimated Time for Containment Install Parking Shades

Page Number: 11 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


48 ● No ○ Yes
Level of Backfill (meters) Install Shelters
● No ○ Yes

Transaction comments and attachments

ITC
ITC Right-of-Way FP - AD
1. The Applicant is to ensure that all required NOCs are obtained
from the relevant external Stakeholders and Service Authorities.
2. The Applicant is to take into account all relevant works in the
vicinity, planned and in progress, and coordinate with and obtain NOCs
from the relevant Project Owners.
3. All safety measures must be considered and the Traffic
Management and Safety Plan must be reviewed and approved by Abu
Dhabi Police.
4. No Roads shall be closed without prior permission from the ITC.

5. No ITC assets are to be relocated or removed without prior


approval of ITC.
6. The granting of this NOC does not absolve the applicant from
the responsibility of third party damage.
7. The Applicant is to ensure that all required NOCs related to
works near, under, above or close to any road or road structure NOC to
be obtained from the relevant Municipalities (Abu Dhabi, Al Ain & Al
Dhafrah municipality)
8. For any road detour / closure applicant must obtain the
necessary approval via Traffic Management Services https://dot.gov.
abudhabi/ar/services/Road_Work_Permit
9. Applicant must approach bus office in case works will affect the
bus route /stops and coordinate with bus office at least one week ahead
of closure / work start by contacting Ateeq Al Mazroui 0506677423 /
Peter Beste 0504540361
10. No parking reservation is permitted without Mawaqif approval.

11. The necessary permits are to be obtained from 'Mawaqif' for


occupation of parking spaces and Parking machines removal.
12. The applicant is responsible for the payment of 'Mawaqif'
parking lot reservation fees as per Law 18 of 2009 to ITC (AED85 per
parking space per day).
13. No objection is subject to obtain permits for Parking-spaces
reservations or Cancelation from MAWAQIF before establishing the
work.
? ‫ﻳﺘﻮﺟﺐ ﻋﻠﻴﻜﻢ ﺍﻟﺤﺼﻮﻝ ﻋﻠﻰ ﺗﺼﺮﻳﺢ ﺗﺤﻮﻳﻠﺔ ﻣﺮﻭﺭﻳﺔ ﻣﻦ ﺇﺩﺍﺭﺓ ﺍﻟﺤﺮﻛﺔ ﺍﻟﻤﺮﻭﺭﻳﺔ ﻓﻲ ﻣﺮﻛﺰ‬
.www.itc ‫ﺍﻟﻨﻘﻞ ﺍﻟﻤﺘﻜﺎﻣﻞ ﻣﻦ ﺧﻼﻝ ﺍﻟﺨﺪﻣﺎﺕ ﺍﻹﻟﻜﺘﺮﻭﻧﻴﺔ ﺍﻟﻤﺘﻮﻓﺮﺓ ﻋﻠﻰ ﺍﻟﻤﻮﻗﻊ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ﻟﻠﻤﺮﻛﺰ‬
‫ ﻗﺒﻞ ﺍﻟﻤﺒﺎﺷﺮﺓ ﺑﺄﻳﺔ ﺃﻋﻤﺎﻝ ﺿﻤﻦ ﺣﺮﻡ ﺍﻟﻄﺮﻳﻖ ﻟﺘﺠﻨﺐ ﺍﻟﻤﺨﺎﻟﻔﺎﺕ ﺍﻟﻤﺎﻟﻴﺔ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻲ ﺍﻟﻼﺋﺤﺔ‬gov.ae
‫ ﻳﻤﻜﻦ ﺍﻻﺗﺼﺎﻝ ﻋﻠﻰ‬،‫ ﻟﻠﻤﺰﻳﺪ ﻣﻦ ﺍﻟﻤﻌﻠﻮﻣﺎﺕ‬.‫ﺍﻟﺘﻨﻈﻴﻤﻴﺔ ﻟﻠﺘﺤﻮﻳﻼﺕ ﺍﻟﻤﺮﻭﺭﻳﺔ ﺍﻟﻤﻌﺘﻤﺪﺓ ﻓﻲ ﺇﻣﺎﺭﺓ ﺃﺑﻮﻇﺒﻲ‬
80088888 ‫ﺍﻟﻬﺎﺗﻒ ﺭﻗﻢ‬
? It is mandatory to obtain Traffic Detour Permit from Traffic
Management Division in the Integrated Transport Centre through the

Page Number: 12 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


online service in ITC website www.itc.gov.ae prior to commencement of
any works within the Right Of Way to avoid Fines and Violations as per
the Issued Executive Regulation for Traffic Detours in the Emirate of Abu
Dhabi. For further information or inquiries please contact number
80088888.
subject to no impact on existing and proposed bus stop infrastructure
and bus movements

Du
Du Telecom FP
Please fill the application form attached in( Wiki ) section ( Corporate
Support System) , for more information please contact Sana Oubari, via
email Sana.oubari@du.ae; & Samer Mashal, via email
samer.mashal@du.ae.

TRANSCO
Transco Infrastructure Services FP
Dear Applicant
Please be informed that according to your marked location on the ENOC
system, we have No Objection for your work as we have no existing
water or power transmission lines within your project area.
Also, please contact before the start of your works at site our
Consultants, M/s.TRACTEBEL ENGINEERING CONSULTANCY,Tel.No.
02 6794615, Abu Dhabi. M/s.Moot Macdonalds .,Tel.No. 02 4457470 ,
Abu Dhabi. M/s.Tebodin M.E.,Tel.No. 02 4066000, Abu Dhabi. M/s.
ENERGO CONSULT L.L.C. .,Tel.No. 02 6763554, Abu Dhabi. M/s. WSP
| Parsons Brinckerhoff Limited,Tel.No. 02 6529222, Abu Dhabi. M/s. ILF
consultant engineers, Tel.No. 02 4189400 , Abu Dhabi..for details of
Transmission lines being constructed/will be constructed under their
supervision.

ADDC
ADDC Assets FP Supervisor

1. You are kindly requested to submit street lighting


protection/relocation works proposal if any to the concerned department
in Municipalities for their review/approval (it is not ADDC asset).
2. You have to liaise with all the concerned developers in your
project area to get their approval to avoid any conflict with their
developments.
3. Before starting any site activities in the vicinity of ADDC Assets
You shall obtain PTW (Permit To Work) from Water/Electricity O&M
Divisions. If you do not obtain the subject PTW, you shall be penalized
as per ADDC rules and regulations and the granted NOC will be
considered not valid.
4. In case there is electricity cable relocation, you have to submit
official letter to Electricity Network Development section asking to open
departmental work order.
5. You have to comply with ADDC Guidelines for
Protection/Relocation of Water/Electricity Assets (Copy attached). In
case there is any deviation, you have to raise the issue to get approval
for the subject deviation.
6. You have to follow ADDC HSEQ guidelines (GL.GN.06 Issue
01 dated 01/09/2013) during any construction works in vicinity/crossing

Page Number: 13 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


ADDC assets. Only approved competent safety officer allowed to work in
vicinity of ADDC assets with supervision of the consultant staff and
coordination with O&M Engineer, (copy from Guidelines submitted to you
along with NOI).
7. All the protection/relocation works on ADDC assets shall be
carried out as per ADWEA Standards and Specifications and through an
ADDC approved Contractor for such works and in coordination with the
concerned ADDC O&M Engineer. In case of relocation / cancellation of
ADDC Assets, you shall exhume the cancelled assets and return them
back to ADDC stores under full supervision of ADDC O&M Engineer.
8. During exposing of existing ADDC water lines not more than
one joint to be exposed and provide proper support for the joint.
9. You shall not operate any of the ADDC assets within the limit of
Contract.
10. No heavy equipment shall be moved over ADDC Assets without
proper protection and under supervision of the concerned W/E O&M
staff.
11. It is not allowed to excavate at any concrete thrust blocks for
the DI Bends/Tees unless getting PMT from the concerned ADDC O&M
Engineer.
12. 24x7 access shall be provided to ADDC O&M staff and vehicles
for any O&M emergency or planned works within the limit of
construction. The Developer contractor shall remove any site
obstruction/Construction materials to access ADDC asset within the limit
of construction and no construction materials shall be stacked over
ADDC assets.
13. Existing underground services shall be identified/tracing
properly using suitable approved calibrated devices. You shall conduct
manual trial excavations prior to start any machine excavation work to
verify Water/Electricity Depth to avoid any damage to ADDC Assets.
After confirming the exact level of the assets, cross section drawings to
be revisited and updated in coordination with the concerned ADDC O&M
Engineer.
14. It is not allowed to keep cable joints inside or near the proposed
split duct.
15. Indication plate to be installed in each side of the proposed
extended split ducts/new ducts.
16. Any modification/relocation/protection of ADDC assets shall be
carried out by ADDC approved contractors as per ADDC procedures and
specifications in coordination with O&M staff.
17. You/your consultant are fully responsible to propose additional
requirements for relocation/protection of existing ADDC assets found
during the construction stage, which are not included in the NOC given
by the ADDC, the same shall be submitted for review and approval prior
to execution.
18. You will bear the full responsibility in case of any damage to
ADDC assets within your project area. You shall contact ADDC
Customers Service center (8002332) informing them about the subject
damage.
19. In case of any NDRC/Directional drilling works, you have to
make trial pits to reach to ADDC assets and know a

ADM
ADM City Center FP
1- This approval is valid for 6 months only.
2- Any minor or major changes during the construction will cancel
this NOC and you should obtain new NOC request.
3- This NOC issued depending on GIS layers and ADM Makani
program and any observed line or conflict with ADM Assets on the field
you should inform ADM and the owner should take the responsibility to

Page Number: 14 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


Relocate or protect the lines/Assets under his cost.
4- Submit a permits in the IPS System for the Following (Asphalt
cutting, Tile Lifting, NDRC, Soft/ Hard Landscape, Storm Water,
Installing Temporary Container, Temporary Sign Board, Temporary
Hump, SCADA integration, Loading And Offloading of Excavation
Material, Loading And Offloading of Quaries Material, street Light, Mobile
Crane, General Bank Guarantee Release, Earthwork Clearance
Certificate) throw this link: https://ips.adm.gov.ae/.
5- Approve any required relocation/protection/Connection for
storm water/street light or lines VIA IDAS SYSTEM.(forgit VIA External
Centers)
6- Coordinating with ADM Consultant if there any conflicts with
ADM Musanada projects.
7- Any required detours/ramps should be approved online by
DOT.
8- All ADM Specifications and Quality directory should applied.
9- Safety assurance should applied during the work.
10- GET A FINAL APPROVAL FROM THE DEVELOPER IT THE
AREA STILL UNDER HIS CUSTODY.
11- The Consultant should fill UP the attached form and upload it in
the system.

ADSSC
ADSSC Sewerage AD FP
Reviewed by: Eng. Zayed Al Areefi
Incomplete Documents, Please Submit:
- New ADSSC undertaking letter (fill the undertaking letter form as
described, and if the form is not filled completely, it will not be accepted)
(Attached)

- Clear and colored proposed drawing (show your proposed work,


legends, coordinates ?in zone 40 for Al Dhafrah Region? and contractor
information as PDF)

- (CAD WGS84 2010, the CAD should be single lines for the proposed
work only) *coordinates ?in zone 40 for Al Dhafrah Region?*

Note:
- Submit all ADSSC requirements (undertaking letter + proposed
drawings CAD & PDF) in compressed file name it ADSSC.

ADNOC
ADNOC HQ FP
Kindly adhere to the condition given by (ADNOC Distribution),
APPROVED WITH CONDITIONS- Applicant to follow the attached
instructions for the works near ADNOC Service Stations.

MCC
MCC Monitor and Control FP
‫ﻳﺮﺟﻰ ﺍﻟﺘﻔﻀﻞ ﺑﺎﻟﻌﻠﻢ ﺑﺄﻧﻪ ﻻﻣﺎﻧﻊ ﻟﺪﻳﻨﺎ ﻣﻦ ﺍﻟﺒﺪﺀ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺍﻟﻤﺸﺎﺭ ﺇﻟﻴﻬﺎ ﻓﻲ ﺍﻟﻜﺘﺎﺏ ﺃﻋﻼﻩ ﺇﻻ ﺇﻧﻨﺎ ﻧﻮﺩ‬
:‫ﺍﻟﺘﻨﻮﻳﻪ ﻋﻠﻰ ﺿﺮﻭﺭﺓ ﺇﺗﺒﺎﻉ ﺍﻟﺸﺮﻭﻁ ﻭﺍﻟﺘﻌﻠﻴﻤﺎﺕ ﻭﺗﻮﻓﻴﺮ ﺍﻟﻤﺘﻄﻠﺒﺎﺕ ﺍﻟﺘﺎﻟﻴﺔ‬

Page Number: 15 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


1. ‫ﺍﻻﺑﺘﻌﺎﺩ ﻋﻦ ﺃﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﺩﻭﻥ ﺍﺧﺬ ﻣﻮﺍﻓﻘﺔ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ‬.
2. ‫ﺗﻮﻓﻴﺮ ﺍﻟﺤﻤﺎﻳﺔ ﺍﻟﻤﻨﺎﺳﺒﺔ ﻋﻨﺪ ﺍﻟﻄﻠﺐ ﻟﺠﻤﻴﻊ ﺃﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﺧﻼﻝ ﻣﺮﺍﺣﻞ‬
‫ﺍﻟﻤﺸﺮﻭﻉ ﺍﻹﻧﺸﺎﺋﻴﺔ ﻭﺗﺤﻤﻞ ﺍﻟﻤﺴﺆﻭﻟﻴﺔ ﺍﻟﻜﺎﻣﻠﺔ ﻋﻦ ﺃﻱ ﺃﺿﺮﺍﺭ ﻧﺎﺟﻤﺔ ﻭ ﺗﺼﺤﻴﺤﻬﺎ ﻓﻮﺭﺍً ﻭﺩﻓﻊ ﺍﻟﺘﻜﺎﻟﻴﻒ‬.
3. ‫ﺗﻮﻓﻴﺮ ﺣﻤﺎﻳﺔ ﺑﺎﻟﺨﺮﺳﺎﻧﺔ ﺍﻷﺳﻤﻨﺘﻴﺔ ﻟﻜﺎﺑﻼﺕ ﻋﻴﻦ ﺍﻟﺼﻘﺮ‬.
4. ‫ﺗﻘﺪﻳﻢ ﺟﺪﻭﻝ ﺯﻣﻨﻲ ﻣﺤﺪﺙ ﻭﻣﻔﺼﻞ ﻟﻤﺸﺮﻭﻋﻜﻢ ﻓﻲ ﺃﻗﺮﺏ ﻭﻗﺖ ﻣﻤﻜﻦ‬.
5. ‫ﺍﻟﺘﻌﻬﺪ ﺑﺎﻟﺴﻤﺎﺡ ﻟﻤﻬﻨﺪﺱ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ ﺑﺎﻟﺪﺧﻮﻝ ﻟﻠﻤﻮﻗﻊ ﺧﻼﻝ ﺍﻻﻋﻤﺎﻝ ﻟﻺﺷﺮﺍﻑ‬.
6. ‫ﻳﺤﻖ ﻟﻤﻬﻨﺪﺱ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ ﺇﻳﻘﺎﻑ ﺃﻱ ﺃﻋﻤﺎﻝ ﻓﻲ ﻧﻄﺎﻕ ﺍﻟﻤﺸﺮﻭﻉ ﻗﺪ ﺗﻀﺮ ﺑﺄﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ‬
‫ﺍﻟﻤﺮﻛﺰ‬.
7. ‫ﻣﺮﺍﻋﺎﺓ ﺭﺑﻂ ﺟﻤﻴﻊ ﺍﻟﻤﻤﺮﺍﺕ ﻣﻊ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﻓﻲ ﺣﺎﻝ ﻧﻘﻞ ﺍﻻﺻﻮﻝ‬.
8. ‫ﺗﺸﺘﺮﻁ ﻫﺬﻩ ﺍﻟﻤﻮﺍﻓﻘﺔ ﻋﻠﻰ ﺗﻮﻓﻴﺮ ﺟﻤﻴﻊ ﻣﺘﻄﻠﺒﺎﺕ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ‬
9. ‫ ﺃﺣﻤﺪ ﺍﻟﻌﺒﻴﺪﻱ ﻋﻠﻰ ﺍﻟﺒﺮﻳﺪ ﺍﻻﻛﺘﺮﻭﻧﻲ‬/ ‫ ﺍﻟﺘﻮﺍﺻﻞ ﻭﺍﻟﺘﻨﺴﻴﻖ ﻣﻊ ﺍﻟﻤﻬﻨﺪﺱ‬aalobaidi@admcc.ae
‫ ﺷﻴﺪ ﻋﺰﻳﺰ ﻋﻠﻰ ﺍﻟﺒﺮﻳﺪ ﺍﻻﻟﻜﺘﺮﻭﻧﻲ‬/ ‫ ﻭﺍﻟﻤﻬﻨﺪﺱ‬sheed@admcc.ae ‫ﻗﺒﻞ ﺑﺪﺀ ﺍﻟﻌﻤﻞ ﻓﻲ ﺍﻟﻤﻮﻗﻊ‬
‫ﺑﻴﻮﻣﻴﻦ‬.

"‫ﻋﺪﻡ ﺍﻻﻟﺘﺰﺍﻡ ﺑﺎﻟﺸﺮﻭﻁ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺃﻋﻼﻩ ﺳﻴﺒﻄﻞ ﻫﺬﻩ ﺍﻟﻤﻮﺍﻓﻘﺔ ﺍﻟﻤﺸﺮﻭﻃﺔ‬."


‫ ﻭﺗﻔﻀﻠﻮﺍ ﺑﻘﺒﻮﻝ ﻓﺎﺋﻖ ﺍﻹﺣﺘﺮﺍﻡ‬،،،

DCT
DCT Culture and Tourism FP - AD and WR
The Department of Culture and Tourism (DCT - Abu Dhabi) has no
objection to this particular project

Etisalat
Etisalat Telecom FP - Abu Dhabi
Your proposed work should be carried out in compliance with the notes
given below and the attached Guidelines Annexure 1 & 2, stating safety
precautions, Contractors responsibilities to be followed from your side
prior to and during the proposed work at site.
During the construction period contractor need to submit all required
detailed drawing to Etisalat Plant Protection Office for site verification.
Moreover, your works program/schedule of proposed works should be
submitted to Etisalat Plant Protection office (Telephone 02 ?
6162728,0505794949) well in advance of commencement of any for
their information & co-ordination.
Nearby existing Etisalat Telephone plant in the area of the proposed
works must be identified/located by manual trial pits and shall provide
adequate protection at site before/during the execution of Road network
works.
Warning signboard to be installed on existing Etisalat network to take
precautionary measures to avoid any damage while execution. In this
regard, please find attached standard drawing no. ETC/PPO/1001/18
showing the specifications of warning sign board.
Your proposed work activities should not conflict with our existing
telephone plant nor to encroach in telephone service reservation to avoid
any damage to existing telephone plant.
The works shall be carried out only under Etisalat technical supervision.
Your program of works should be submitted to us well in advance of
commencement of work at site and design and supervision charges will
be advice accordingly.
Etisalat network must be identified/located at site before commencing
any excavation work and adequate protection for Etisalat network as per
normal standard procedure are to be provided.
Mechanical excavation near to Etisalat network is not allowed, and all
excavations works in the project area are to be carried out manually.
Existing telecom ducts that falls under the proposed Roads / paved

Page Number: 16 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


surfaces are to be encased with 10CM thick concrete surround.
Protection and method statement should be submitted to Plant
Protection Office before starting works activities.
Our existing telephone plant found nearest your works activity make trial
pit excavation (copy attached) and submit accordingly for approval.
Etisalat service corridor shall be not be affected due to any type of
activities and the contractor/consultant shall hold full responsibility in
case of Etisalat service disturbance.
Likewise, any damage inflicted on existing Telephone plant during the
course of your works will be dealt as per prevailing damage claims
procedures.
Existing Telephone duct that falls under newly paved area or areas
disturbed by your works are to be tested and if any damage/blockage
noticed, should be rectified.
Etisalat requirement to take precautionary measures for existing
Telecom line plant at junction/road crossing points while executing the
work at site.
Contractor will be liable to pay any damage caused during the
construction works in this area.
Please note that, the contractor shall be held liable for any accidental
damage happens to the existing telephone plant during the course of
works and any damage claims will be dealt as per the prevailing
procedures and it?s to be ?Deliberate category? case.

ADSSC
ADSSC Sewerage AD FP
Reviewed by: Eng. Zayed Al Areefi

1. To send the proposal for review to ADSSC Operations and


Maintenance Division before the commencement of any work.
2. For issues related to Storm Water services, please contact ?PRFD ?
Abu Dhabi Municipality? as ADSSC is not be responsible of such issues.
3. Enclosed herewith one set of detailed sewerage service?s As Built
drawings showing proximity locations, associated with a table that
indicates drawings numbers. However this does not relieve the
applicant(s) to confirm the same on actual ground before
commencement of any works.
4. No construction work is permitted within a limit of 10 Meters on either
side of our existing services which are highlighted on our attached As
Built drawings.
5.Following particular comments need to be adhered while performing
proposed works:-
-Excavation should be carried out by hand tools, within a distance of 3
meters on either side of the existing ADSSC services.
-We prohibit the movement of machinery and heavy equipment across
the lines or any other ADSSC assets, except where the safe passage is
designated.
-We prohibit dewatering within the limit of 50 meters on either side of our
pipeline or any other ADSSC assets.
-If the trench width exceeds 2.5 meters then it is a must to obtain
ADSSC?s approval for method deployed for protecting ADSSC
pipelines.
-To reinstate the site to its original form and shape at your own cost.
-Before you start the work, it is required to invite our site audit team of O
& M Division at the site for any intricacy, incase such a demand arises.
6. For all TSE line they have to take NOC and PTW from ADDC
7. For issues related to Irrigation services, please contact ?ADDC? as
ADSSC is not be responsible of such issues.
8. For any works related to sewerage network (proposed/modification)

Page Number: 17 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


should be done as per ADSSC standard specifications with submitting
method statement & drawings in details case by case before start any
work in the site.

GHQ
GHQ Military Works and Telecom FP
‫ ﻣﻦ ﻗﻴﺎﺩﺓ ﺳﻼﺡ ﺍﻻﺷﺎﺭﺓ ﻣﻜﺘﺐ ﻋﺪﻡ‬2021/04/06 ‫ ﻭﺍﻟﺼﺎﺩﺭﺓ ﺑﺘﺎﺭﻳﺦ‬479 ‫ﺣﺴﺐ ﺍﻟﻤﻌﺎﻣﻠﺔ ﺭﻗﻢ‬
‫ﺍﻟﻤﻤﺎﻧﻌﻪ ﻭﻳﺠﺐ ﺗﻨﻔﻴﺬ ﺍﻟﻤﻼﺣﻈﺎﺕ ﺍﻟﻤﺘﻔﻖ ﻋﻠﻴﻬﺎ ﻣﻦ ﻗﺒﻞ ﺍﻓﺮﺍﺩ ﻣﻜﺘﺐ ﻋﺪﻡ ﺍﻟﻤﻤﺎﻧﻌﻪ ﻭﻳﺠﺐ ﺍﺧﺬ ﺍﻟﺤﻴﻄﻪ‬
‫ﻭﺍﻟﺤﺬﺭ ﺍﺛﻨﺎﺀ ﺍﻟﻌﻤﻞ ﻭﺗﺘﺤﻤﻞ ﺍﻟﺸﺮﻛﺔ ﺍﻱ ﺿﺮﺭ ﻳﺤﺪﺙ ﻟﺨﺪﻣﺎﺕ ﺍﻟﻘﻮﺍﺕ ﺍﻟﻤﺴﻠﺤﺔ ﺍﺛﻨﺎﺀ ﺍﻟﻌﻤﻞ‬

Attachment Attachment Type Uploaded By Upload Step

Submit authorized
Electrical zip files Nawas MK LNT
transaction

Submit authorized
Water zip files Nawas MK LNT
transaction

Cross Sections Nawas MK LNT Review conditions

Cross Sections Nawas MK LNT Applicant - FYI

Submit authorized
Route Approval Nawas MK LNT
transaction

Submit authorized
Route Approval Nawas MK LNT
transaction

Submit authorized
Key Plan Nawas MK LNT
transaction

Submit authorized
Key Plan Nawas MK LNT
transaction

Submit authorized
Key Plan Nawas MK LNT
transaction

Cross Sections Nawas MK LNT Applicant - FYI

Page Number: 18 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:46:


Map

Project Spatial Attributes


Design Version Map Feature
1 polyline

Location
Long, Lat DEM Elevation Sharing Duct
24.21687910 , 54.85424065 False

Grid Depth (Maximum) Height (Maximum)


40R BM87,40R BM88 5

Region
Ground Level Length (Meter)
1838.76
Buffer (Meters)
15 Width (Maximum)

Shape Area
37013.13

Design Change Reason



Comments from Issuing Entities


Changes in permitting requirements

NOC Reply

Page Number: 19 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:47:


Individual NOC ID: 42661600060001
Solution Role ADDC Assets FP Supervisor

Entity Name ADDC


NOC Reply B) NOC with Conditions
Valid 1 Years Starting from:11 - 03 - 2021 04:23:09 till 10 - 03 - 2022 04:23:09

Conditions
Implementation Conditions

Contractor should apply specific safety


measures during implementation

Contractor should apply general safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Further NOC would be required from VIP


entities (see comments / attachments)

Individual NOC ID: 42661600070001


Solution Role ADM City Center FP

Entity Name ADM


NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:17 - 03 - 2021 03:40:10 till 16 - 09 - 2021 03:40:10

Conditions
Implementation Conditions

Contractor should apply general safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 20 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:47:


Individual NOC ID: 42661600100001
Solution Role ADNOC HQ FP

Entity Name ADNOC


NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:15 - 03 - 2021 09:27:13 till 14 - 09 - 2021 09:27:13

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 4319715335354


Solution Role ADSSC Sewerage AD FP

Entity Name ADSSC


NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:18 - 03 - 2021 10:46:41 till 17 - 09 - 2021 10:46:41

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 21 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:47:


Individual NOC ID: 42661600340001
Solution Role DCT Culture and Tourism FP - AD and WR

Entity Name DCT


NOC Reply A) NOC with No Conditions
Valid 1 Years Starting from:10 - 03 - 2021 10:51:26 till 09 - 03 - 2022 10:51:26

Conditions
Not Relevant Project
Other notes that may enhance the business
rules as specified in the comments /
attachments

Individual NOC ID: 42661600200001


Solution Role Du Telecom FP

Entity Name Du
NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:10 - 03 - 2021 01:44:31 till 09 - 09 - 2021 01:44:31

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 22 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:47:


Individual NOC ID: 4310895323191
Solution Role Etisalat Telecom FP - Abu Dhabi

Entity Name Etisalat


NOC Reply B) NOC with Conditions
Valid 3 Months Starting from:14 - 03 - 2021 06:04:55 till 13 - 06 - 2021 06:04:55

Conditions
Implementation Conditions

Contractor should apply specific safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 4367005389220


Solution Role GHQ Military Works and Telecom FP

Entity Name GHQ


NOC Reply B) NOC with Conditions
Valid 1 Years Starting from:13 - 04 - 2021 09:27:19 till 12 - 04 - 2022 09:27:19

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 23 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:47:


Individual NOC ID: 42661600190001
Solution Role ITC Right-of-Way FP - AD

Entity Name ITC


NOC Reply B) NOC with Conditions
Valid 3 Years Starting from:11 - 03 - 2021 02:44:27 till 10 - 03 - 2024 02:44:27

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 42661600080001


Solution Role MCC Monitor and Control FP

Entity Name MCC


NOC Reply B) NOC with Conditions
Valid 3 Months Starting from:10 - 03 - 2021 10:46:50 till 09 - 06 - 2021 10:46:50

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 24 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:47:


Individual NOC ID: 42661600280002
Solution Role Transco Infrastructure Services FP

Entity Name TRANSCO


NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:11 - 03 - 2021 12:11:29 till 10 - 09 - 2021 12:11:29

Conditions
Implementation Conditions

Contractor should apply general safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 42661600310001


Solution Role ZonesCorp Industrial Customer Services FP

Entity Name ZonesCorp


NOC Reply A) NOC with No Conditions
Valid 6 Months Starting from:10 - 03 - 2021 09:45:44 till 09 - 09 - 2021 09:45:44

Conditions
Not Relevant Project

The project area is completely outside the


entity jurisdiction area

Page Number: 25 / 25 Transaction 11-20211169912-01-3-04-00 Report generated On:18-10-2021 02:47: