Quality of
Time Regulation Cost
Procedures enhanced:
- Latent defect liability Cost associated
and decennial defect with
Total time of all liability insurance
included. Construction
approvals during - Professionals Permit reduced
construction qualifications defined .
- Risk based from 13.6 lacs to
cycle reduced
from 213 days to
classification of all INR 1.91 lacs
Reduced: buildings enabling fast
From 29 to 8 less than 60 pacing in plinth level
days. inspection and OCC
incorporated.
2
Online - Common Application Form
3
Integration of Departments
Departments integrated Departments integrated Departments NOC
Last Year This Year Dispensed with
The Digital Signatures have been incorporated so there is no interaction between the
applicant and the department
All the requisite information regarding Building Bye-Laws, Master Plan of Delhi, Office
Orders, Circulars, List of Building Plans, DMC Act etc. are available on the MCD
website
Check List : The ‘Check List’ and FAQ are available in public domain
The affidavits (16 Nos) have been converted into e-undertaking from architect and an
undertaking from applicant
Online Single payment option is available through Net banking / RTGS / NEFT/ Debit-
Credit Card.
Online Calculator to determine the Building Plan fee is available on the website.
For awareness of General Public, Facebook page (MCD Ease of Doing Business) has
been launched on which all circulars / office order / information are shared regularly.
For day to day grievances / technical issues WhatsApp group is functional on which the
replies are given on daily basis.
5
HCC NMA
AAI CIF
DMRC Forest
DUAC
DFS DPCC
Case
scrutinized by
the AE(B)and
processed
Single
After receiving the
requisite NOCs After approval of
Window (Deemed NOC on EE(B) / SE(B) and
16th Day), payment of requisite
fee , construction
cases are permits released
System Processed for online
approval
Corporation Office
In case of no response
from Deptt., Deemed
sanction on 31st Day
6
Process Flow for Issue of Construction Permit
Fill Common
Check Guidelines
for NOC Application
Upload the
Requirement Form Drawing
NOC request is
Pay Processing AE to Validate automatically
Fee Forward to respective
the Request external Agencies
28 Days
External
Return Status
Agencies to
to MCD Approve/Reject
0.5 day
Plan Sanction / Pay Sanction
Plan Released with
Charges & External 7
Rejected by Agencies Charges
Digitally signed
sanction letter
Process Flow for Plinth Inspection Certificate
7 Days
In case of Moderate Inspection by
& High Risk, C-2
application reaches Department 8
Process Flow for Completion Certificate
15 Day
Forward to applicable
NOC Department
automatically (to be
returned within 15 days
else deemed)
Submit
16 commencement 1 day -
notice to the MCD The requirement was present in
Procedures Building Bye Laws 1983 but same
Submit Notice of Eliminated
was removed in UBBL 2016
commencement and (Time : 0, Cost : 0)
17 1 day - goo.gl/oZOttn
completion to Labour
Inspector
Submit notice of Procedure 4: Intimation of completion of
18 Through online system at
completion up to the 1 day - work up to plinth level goo.gl/ONmhq7
plinth level (Time: 0.5 day, Cost : INR 500/-)
Procedure 5: Plinth level inspection followed Plinth level inspection is not
Request and receive by issue of plinth level inspection certificate carried out by agency as per
19 inspection at the 1 day INR 15 (Time: 7 days, to be considered as 0 days as UBBL 2016, inspection report is
plinth level
per case study, Cost: 0) submitted by architect online
Procedures, Time and Cost comparison between
DBR- 2017 and Current scenario (4/6)
S. No Process, Time & Cost As Per DBR- 2017 Process, Time, Cost & Legal Basis After Reform
Implementation
Replaced by e-
Notarize the
Procedures undertakings and
affidavit/undertaking to
26 1 day INR 100/- Eliminated no requirement of
request the occupancy
(Time : 0, Cost : 0) attestation
permit
goo.gl/Y7Ar16
Procedure 8: Intimation of
Obtain compounding fee and charges, if
29 completion/occupancy 30 days INR 51,145 applicable, and release of OCC and goo.gl/P6NpfY
permit completion plan
(Time: 0.5 days, Cost:1,00,000/- INR)
15
Reforms undertaken to improve building quality
control index
S. No Reform Impact Legal Basis
Now UBBL-2016 mandates Risk based inspections are A score of 2 should be assigned for “What
1 carried out during construction based on the risk types of inspections (if any) are required by Clause 2.5
category of the building law to be carried out during construction? ”
Now UBBL-2016 provides that Professionals with A score of 1 should be assigned for “What
defined number of years of experience, university are the qualification requirements for the
4 degree and being a registered architect or engineer professional who supervises the Annexure 1
can supervise the construction on ground construction on the ground?”
Statistics of Building Plans Sanctioned by the Corporations (From 08/04/2016 to
25/07/2017)
S. No. REFORMS
18
Cases of fastest building plan approvals granted
19
Comparison with leading economies
Dealing with Construction Permits
New Zealand Australia Taiwan, China
Indicator India*
(CP Rank:1) (CP Rank:2) (CP Rank:3)
Procedures
10 10 10 8
(number)
Cost (% of
2.2 0.5 0.4 3.74
warehouse value)
Building quality
15 14 13 15
control index (0-15)
20
Good practices adopted in India
• Single window clearance system has been implemented covering entire construction life cycle from
building plan approval till issuance of occupancy certificate
• All internal and external agencies are integrated into the single window with no interaction required
with separate agencies, however in New Zealand applicant needs to interact with multiple
departments
21
Facebook Page to provide information pertaining to various Initiatives
22
Handling Day to Day Issues/communication through WhatsApp Group
23
Handling Day to Day Issues/communication through WhatsApp Group
24
Advertisement in Times of India on 06th March, 2017
25
Advertisement in Times of India on 11th March, 2017
26
Walkthrough on Building Plan approval till issuance of
Occupancy cum Completion Certificate
http://mcdonline.gov.in/tri/sdmc_mcdportal/onlineserv/building-plan-sanction.html
27
Twitter Poll Feedback
28
Twitter Poll Feedback
29
Twitter Poll Feedback
30
Risk based inspections
31
Latent Defect Liability
32
Qualification requirements for professionals
33
Thank you