Activity Predecessors to tm tp
A -- 1.5 2 15
B -- 2 3.5 21
C A 1 1.5 18
D B 0.5 1 15
1. E A 3 5 24
F C 1 2 16
G D 0.5 1 14
H B 2.5 3.5 25
I E, F 1 3 18
J G, H 2 3 18
Activity to tp tm
A 4 6 4.5
B 2 17 8
C 1 6 2
D 2 4 2.5
6.
E 6 20 8
F 12 20 16
G 6 15 9
H 10 16 12
I 1 2 1.5
Best Wishes,
Eng. Elin Eldars
1
Ministry of Higher Education
High Institute for Engineering and Technology, New Damietta
Civil Engineering Department
ENG-408 [Project Management and Control]
Activity to tm tp
A 4 5 6
B 4 6 8
C 3 5 7
D 1 3 11
7.
E 2 5 14
F 8 11 20
G 4 5 6
H 4 4 10 - What will happen if activity G increases by 3 weeks.
- What will happen if activity F increases by 3 weeks.
I 5 6 13
Probability Table