Professional Documents
Culture Documents
1377
12 22
11 13 2. THIS DESIGN IS SUITABLE FOR 25T. LOADING STANDARD.
5452
14 1 32 # @ 200 c/c CURTAILMENT BAR
TOP OF BED BLOCK - 18.115 15
3. # INDICATE STAINLESS STEEL REINFORCEMENT AND SHALL CONFORMING
1000
3871
1200
22a 20 300 TO IS:16651- 2017.OF 500 D GRADE.
BOTTOM OF BED BLOCK - 17.115
13a 4. THE LENGTH OF THE LAP PROVIDED, HOWEVER SHALL NEITHER BE LESS
7473
2 32 # @ 200 c/c
16 THAN 45 Ø + 150mm IN TENSION REINFORCEMENT NOR BE LESS THAN 35+
2682.5
EARTH SIDE 3a 5a 1200 Ø150mm IN COMPRESSION REINFORCEMENT. WHERE Ø - SMALLER BAR
7742
CONFINEMENT LEVEL - 15.471
3a 3 16 # @ 100 c/c
BELOW SIZE.
825
825
CONFINEMENT LVL 8175
2 4a 3a 16 # @ 200 c/c
ABOVE
5. BACK FILL MATERIAL SHOULD BE AS PER CLAUSE 7.5 OF IRS BRIDGE
825
825
5365
3871
EARTH SIDE 6. ALL RCC SURFACE COMING IN CONTACT WITH SOIL SHOULD BE PAINTED
7473
2682.5
3 4a 20 # @ 100 c/c WITH BITUMEN OR COAL TAR OF APPROVED QUALITY @ 1.464 KG/SQ. M.
19
21a
3 23 500
7. CLEAR COVER FOR REINFORCING BARS SHOULD BE 50mm ABOVE GROUND
HFL - 12.25 8a 8
OPEN LINK
24a AND 75 MM BELOW GROUND
10D
10D
HORZ SPACING 200
5 10 # @ 100 c/c 1275
OPEN LINK
8. ALL DIMENSIONS SHOULD BE VERIFIED AND RECONCILED BEFORE
10D
10D
5a 10 # @ 200 c/c ABOVE
1275
CONFINEMENT LVL
EXECUTION.
1900
SR
1900
1125
1125
6 32 # @ 100 c/c 9750
1125
1125
BOTTOM OF FOUNDATION - 9.850 7 32 # @ 100 c/c 12150
150 MM THK PCC
6 1988 714 6897 714 1988 10. GRADE CONCRETE SHALL BE USED FOR RCC WORK:
7
1125
1125
12300 8a 25 # @ 100 c/c 12150 PSC SLAB - M35
6125 1375 2400
9900 9750 P.C.C. - M 20 (MINIMUM)
1125
1125
8 25 # @ 100 c/c FOUNDATION, ABUTMENT, PIER, FACEWALL, BALLAST RETAINER - M35
10D WEARING COURSE - M-25.
17
9 12 # @ 200 c/c
OPEN LINK
LEVELING COURSE - 1:3:6
1650
BOTH WAYS
4200 4200 13. MAX LOAD UNDER ABUTMENT PILE IS 410 T AND PILE CAPACITY
CONSIDERED IS 450 T
2511
10 16 # @ 200 c/c
14. SEVERE EXPOSURE CONDITION HAS BEEN CONSIDERED IN DESIGN
1200 1200 1200 1200 15. SEISMIC ZONE III HAS BEEN CONSIDERED IN DESIGN
500
BOTTOM OF PILE - 1.550 BOTTOM OF PILE - 1.550
1440
1440
11 12 # @ 200 c/c 8175
1903
12 12 # @ 200 c/c
2 3a
200
B
1825
13 25 # @ 200 c/c
850
850
9900 STANDARD DRAWINGS TO BE FOLLOWED:-
1375
7225 1375 1300 4a 1. FOR WEEP HOLE & BACK FILLING MATERIAL R.D.S.O. DRG.
850
13a 20 # @ 200 c/c
850
1825 NO. GE/SD/0006/REV-1/2002
750 4200 4200 750 2- SUPER STRUCTURE DRAWING NO RDSO/B- 17182
1440
1440
14 25 # @ 200 c/c 8175
3- FOR GAD REFER DRG NO GM(E)MB-12922
5a
750
4a 8325 10D
850
1988
200
200
8175
17 32 # 20 NOS
9830
1375
4a
300
5
4a
9830
IN 2 LAYER
17a 32 # 11 NOS
8325
SECTION AT B1-B1 300
SCALE ( 1:50 ) 55D
A A 12 # @ 100 c/c IN TOP 4M 55D
12300
18 LAPPING IN ELEVATION
3600
8325
12 # @ 250 c/c
1081
IN REMAINING
7 LENGTH
200
6518
50MM Ø 19 32 # @ 200 c/c CURTAILMENT BAR
900 MM (MIN.)
PIERCAP/ MS PIPE
BED BLOCK ISA 75x75x8 1280
180
P1
8996
6
20 32 # 200 c/c
200
1280
21 12 # @ 100 c/c
200
200
3600
9000
500 (MIN.) 900 (MIN.) P2
22 12 # @ 200 c/c
200
200
9000
SECTION D-D
200
5282
1988
P1 200
750
200
8939
B
200
1717a
FOUNDATION PLAN OF ABUTMENT D
PIERCAP/ P2
D
10D
10D
23 12# @ 200 c/c
SCALE ( 1:150 ) INTERNAL RING BED BLOCK
VARIES
500
24 25# @ 200 c/c
18 500
200
200
24a 12# @ 3NOs 9000
BE PROVIDED AS PER
SITE CONDITION 10D
SR SIDE
16 # @ 200 c/c REINFORCEMENT
100
100
INSPECTION PLATFORM
DETAIL (PLAN) INSPECTION STRUCTURAL CONSULTANT PROOF CHECKED BY
SCALE ( 1:50 ) P2 12 # @ 200 c/c
100
100
PLATFORM