Monday, September 18, 2023

Online Permits Application


Work Access Permit / Gate Pass

By submitting your personal information, you agree to allow the management to collect
and store these information for security purposes. Confidentiality shall be exercised for
any information submitted to the management.

And by submitting this form, you are confirming that no one in your household is
experiencing symptoms or is awaiting RT-PCR results or any Covid-19 tests in order to
proceed with any works in your unit.

Identification Code: ARW-11A

Tower: Arton West

Tenant: Patricia Louise Henson

Unit: ARW-11A

E-mail: engr.tinaescoto@gmail.com

Select Transaction: Work Permit

GATE PASS
Schedule: Mondays to Saturdays from 9:00 AM to 5:00 PM only.
Notes:
Please attach a separate sheet if needed.
Deliveries and pull-outs for unexpected holidays can be allowed so long as there is a pre-approved
Gate Pass from Property Management Office.
For Tenants: please inform your Leasing Executive regarding any delivery and pull-out of items.

WORK PERMIT
This form should be properly filled out by the unit owner/resident and approved by
the Building Engineer or Building Manager before each repair or renovation work in
the unit. Please take note of the following guidelines:
1. Work should be done only from Mondays to Fridays, from 8:30 am to
12:00nn and 1:00 pm to 5:00 pm only. Strictly no works on weekends and
holidays.
2. Noisy works should only be done from 10:00 am to 12:00nn and 2:00 pm to
4:00 pm only.
3. Workers must be confined to the workspace only. Anyone caught loitering in
other areas of the compound will be reprimanded.
4. Workers must be properly dressed. Those wearing shorts, sandos, and
slippers will be prohibited from entering the condominium building.
5. The contractor is responsible for ensuring that workers abide by the
Condominium Corporation's Rules and Regulations. Visitors are subject to
penalties.
6. Working Permits should be accomplished at least one day before the actual
work.
7. Construction Guidelines
PROHIBITED MATERIALS & EQUIPMENT WITHIN THE UNIT PREMISES
1. Lacquer and oil-based paints and solvents. Only water-based materials are
allowed to be used inside the unit.
2. Polyurethane varnishes and other oil-based materials. Only water-based
varnishes are allowed to be used inside the unit.
3. Use of the compressor within the unit.
4. Use of grinder within the unit. An area will be provided if the contractor needs
to use a grinder.
5. Use of jackhammer inside the unit.
6. Use of Flammable substances is strictly prohibited inside the unit.

I Agree

Contractor / Supplier: PGCDC

Authorized Representative/s: Ma Cristina Escoto and Rey Victorino

Contact Number: 09672103484

Date Start: Monday, September 18, 2023 09:00

Date End: Friday, September 22, 2023 17:00

Number of Days: 4.33

Maximum of five (5) days only.

Check Applicable: Noisy Works

Weekly Validity-Working Category More than two (2) working days

Reminder/s:
Noisy works should only be done from 10:00am to 12:00nn and 2:00pm to 4:00pm only.

Details: Name of Company Descriptio


Tools Remarks
Personnel Name n of Works

Eddie boy
babiera Painting
Cristo val Installati material
Elano on of and drill
PgCDC
redentor divider- for
saavedra modular furniture
diorico only
camolo
Click the "Save and Add Row" button before submitting this
form.
APPROVAL
Approver Code: 1956

Approver Mike Dizon

Status: Approved

Remarks:
Please secure a separate gate pass for the appliances/bulk items. Please observe noisy works hours
between 10:00AM to 12NN and 2:00PM to 4:00PM. Strictly no works on weekends and holidays.

Signature:

Reference ID: GdYsw

Get Page URL https://www.jotform.com/edit/5708027889917728193

You might also like