Document Title : Lebak Bulus Station - Structural Design (Foundations) Document No. : TWJO-1-TCD-ST1-0004-Rev B
Review Date : 13-02-2015 Response Date : 26-02-2015
No. Date Reference The Engineer’s Comments Status* The Contractor’s Response
(Section)
26-02-2015 R – Response Reduction Factor/behavior Factor.
Due to a frame structure a relevant reduction
factor can be used for reducing the design
seismic forces on structure. In such a case a
ductile structure is envisaged.
In JMRT the design spectrum used for
design is based on site specific studies.
2.3.7. Seismic Loading Page Please add explanation or comment about “Reduction Under this, it had been envisaged that
1 NONO B
14/55 6th line from bottom Factor” (I,R) for level – 1 earthquake also termed as
“ODE” no reduction of forces shall be
presumed and the structure shall be
designed to withstand Level 1 damage
criterion as defined in design manual.
However for Level 2 earthquake a
reasonable reduction factor has been
presumed in order to ensure some
TWJO-STD-F28-revA PAGE 1 / 6
TOKYU-WIKA JOINT OPERATION
Construction of Jakarta Mass Rapid Transit Project
Surface Section CP101 & CP102
No. Date Reference The Engineer’s Comments Status* The Contractor’s Response
(Section)
ductility in the frame structure.
Further caution has been envisaged
while using a value combination of R & I
(Importance factor) as in any case the
design MDE Spectrum shall not be less
than the designed ODE spectrum
Hence a 25% higher force than ODE
has been used for MDE design thus the
R value of 1.69 & I value of 1.0.
It can also be read as R = 2.25 & I =
1.4.
26-02-2015 2.3.7. Seismic Loading Page
2 Please add explanation or comment about “RRF” & “Ie” NONO B Refer to the detailed Response to Item no. 01
15/55 Figure 12
26-02-2015 The table 2 of section 2.4 “Load combination”
clearly depicts that the load combination as per
Please describe which code was used in actual BS standard are more conservative against the
2.4 Load Combinations Page
3 calculations in each condition (eg. SLS, ULS, ODE, NONO B SNI standard.
16/55
MDE) SNI or BS? Hence, BS standard has been used for design
load combination for each condition.
TWJO-STD-F28-revA PAGE 2 / 6
TOKYU-WIKA JOINT OPERATION
Construction of Jakarta Mass Rapid Transit Project
Surface Section CP101 & CP102
No. Date Reference The Engineer’s Comments Status* The Contractor’s Response
(Section)
26-02-2015 A total of 12 load combinations are reviewed in
OASYS for any given condition. The following
combinations form a part of the same.
Maximum Axial Compression
In design of pile, please justify the value of actual force. Maximum Axial Tension
For example, pile design of columns C20 & C22. Maximum Longitudinal Shear
Minimum Longitudinal Shear
Maximum Transverse Shear
Minimum Transverse Shear
TWJO-STD-F28-revA PAGE 3 / 6
TOKYU-WIKA JOINT OPERATION
Construction of Jakarta Mass Rapid Transit Project
Surface Section CP101 & CP102
No. Date Reference The Engineer’s Comments Status* The Contractor’s Response
(Section)
In OASYS, “Maxima” & “Minima” denote the
maximum & minimum interaction factors against
section check. Refer appendix 1 attached for the
12 interaction factors. It can be clearly seen that
the interaction factor values for maximum tensile
force is higher than the one picked up by
OASYS.
TWJO-STD-F28-revA PAGE 4 / 6
TOKYU-WIKA JOINT OPERATION
Construction of Jakarta Mass Rapid Transit Project
Surface Section CP101 & CP102
No. Date Reference The Engineer’s Comments Status* The Contractor’s Response
(Section)
26-02-2015 Pile bending moment does not affect the bending
moment of pile cap and hence it is not
considered in design.
Single Pile Group: Pilecap is acting as a
transition element to facilitate the reinforcement
interfacing from bored pile to station’s column.
Hence, no bending moment gets transferred to
In design of pile cap, please clarify the reason why bending
Appendix J Design pile cap.
5 moment of pile is not considered in calculation of bending NONO B
Calculations of pile & pile cap Multiple Pile Group: Pilecap is acting as transfer
moment of pile cap.
beam that spread the column loading to the
bored piles. Bending moment due to Pilecap-
bored pile rigid connection, has been accounted
in the design of pile itself while pilecap design
were based on bending theory. Hence, no
bending moment gets transferred to pile cap.
TWJO-STD-F28-revA PAGE 5 / 6
TOKYU-WIKA JOINT OPERATION
Construction of Jakarta Mass Rapid Transit Project
Surface Section CP101 & CP102
No. Date Reference The Engineer’s Comments Status* The Contractor’s Response
(Section)
26-02-2015 The detailed drawing shall be amended and
Please clarify the reason why “General Note of drawing –
resubmitted for the same.
Appendix drawing 1-CWD-GNL-0010 is not applied in the points below.
7 NONO B Drawing no 1/STN/STR/3021 has been revised
1/STN/STR/3021 6.5 Anchorage Length
to tally with general notes drawing
6.8 Spiral Reinforcement
1/CWD/GNL/0010
*Status (NOO: Notice of Objection with type A comments, NONO-B: Notice of No Objection with type B comments, NONO-C: Notice of No Objection with type C comments, NONO: Notice of No
Objection)
TWJO-STD-F28-revA PAGE 6 / 6
For lap lengths calculation Piles ultimate
references to EN92-1-1 & EN92-2 Tension 50% Lapped bars
Material properties
concrete
cc 1.0 refer to 3.1.6
ct 1.0 refer to 3.1.6
c 1.5 ultimate
c 1.0 service
0.8 depth of rectangular block
x depth to N.A.
reinforcement
anchorage length
*refer to 8.4.3-8.4.4
lb, req ( /4)( sd/fbd) basic development length
lbd= 5 lb, req>lb, min design development length
lb, min> max(0.3lb,rqd, 10 ,100)
l0 lap length
yield(fyk) 390
concrete(fck) 32
fctd 1.411 get from table at top
min cover 100 For piles. refer to Design Manual
clear spacing 80
cd 40
1 1 always 1 for lap calcs/ >19(hooked)
3 1
4 1 always 1 unless confined by welded reo
5 1 always 1 unless confined by transverse pressure
100 % of bars lapped within 1.3l0,min from the section considered
6(50%) 1.4 6=1, 1.15, 1.4, 1.5 for =25, 33, 50, 100% (50%)
to calculate the % refer to Fig.8.7
1 0.7 for development length calcs(hooked), if <19
6 1.5 for =100%. Refer to 8.7.3
laps rules
100% of bars at a location can be lapped provided requirements of 8.7.2 are met. Otherwise 50% can be lapped
50% can be lapped in all cases with rebar in more than one layer
transverse reo should be provided within the lap length. Total area equals one lapped bar area.
for bars >32 additional detailing rules should be met - refer to 8.8
in case of bundled bars with bar dia >32mm the lap joints shall be in accordance with
Clause 8.9.3 of EN-1991-1
For lap lengths calculation Pile Cap ultimate
references to EN92-1-1 & EN92-2 Tension 50% Lapped bars
Material properties
concrete
cc 1.0 refer to 3.1.6
ct 1.0 refer to 3.1.6
c 1.5 ultimate
c 1.0 service
0.8 depth of rectangular block
x depth to N.A.
reinforcement
anchorage length
*refer to 8.4.3-8.4.4
lb, req ( /4)( sd/fbd) basic development length
lbd= 5 lb, req>lb, min design development length
lb, min> max(0.3lb,rqd, 10 ,100)
l0 lap length
yield(fyk) 390
concrete(fck) 32
fctd 1.667 get from table at top
min cover 100 For piles. refer to Design Manual
clear spacing 80
cd 40
1 1 always 1 for lap calcs/ >19(hooked)
3 1
4 1 always 1 unless confined by welded reo
5 1 always 1 unless confined by transverse pressure
100 % of bars lapped within 1.3l0,min from the section considered
6(50%) 1.4 6=1, 1.15, 1.4, 1.5 for =25, 33, 50, 100% (50%)
to calculate the % refer to Fig.8.7
1 0.7 for development length calcs(hooked), if <19
6 1.5 for =100%. Refer to 8.7.3
laps rules
100% of bars at a location can be lapped provided requirements of 8.7.2 are met. Otherwise 50% can be lapped
50% can be lapped in all cases with rebar in more than one layer
transverse reo should be provided within the lap length. Total area equals one lapped bar area.
for bars >32 additional detailing rules should be met - refer to 8.8
in case of bundled bars with bar dia >32mm the lap joints shall be in accordance with
Clause 8.9.3 of EN-1991-1
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
DOCUMENT/DRAWING TECHNICAL
VERIFICATION AND REVISION RECORD
APPROVED
PREPARED
/DESIGNED
CHECKED
DATE OF
REV. No.
DESCRIPTION
* Delete as Appropriate
TWJO-1-TCD-ST1-0004-Rev B
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
CONTENTS
1. INTRODUCTION ............................................................................................................ 1
1.1 Scope of Report........................................................................................................ 1
1.2 Design Package Affiliation ........................................................................................ 1
2. DETAILED DESCRIPTION – LEBAK BULUS STATION .............................................. 2
2.1 Description of structure ............................................................................................. 2
2.2 Structural modelling .................................................................................................. 5
2.2.1 General ......................................................................................................... 5
2.2.2 Methodology.................................................................................................. 6
2.3 Loadings ................................................................................................................... 7
2.3.1 Dead Load..................................................................................................... 7
2.3.2 Super imposed Dead Load ............................................................................ 9
2.3.3 Live Load .................................................................................................... 10
2.3.4 Braking & Traction Load .............................................................................. 11
2.3.5 Temperature Load ....................................................................................... 12
2.3.6 Wind effects ................................................................................................ 12
2.3.7 Seismic Loadings ........................................................................................ 13
2.4 Load Combinations..................................................................................................16
3. STRUCTURAL ANALYSIS ...........................................................................................17
3.1 Seismic Response of structure ................................................................................17
3.2 Mode Shapes ..........................................................................................................17
3.3 Fundamental Time period ........................................................................................19
3.4 Seismic mass participation ......................................................................................19
3.5 Lateral Seismic Inter-storey drift ..............................................................................19
4. SUBSOIL CONDITIONS ...............................................................................................26
4.1 Stratification.............................................................................................................26
4.1.1 Stratum 1: Alluvial Fan (Unit Qav) ............................................................... 26
4.1.2 Stratum 2: Bojongmanik Formation (Unit Tmb) ............................................ 26
4.2 Groundwater Conditions ..........................................................................................27
4.2.1 Borehole Reference .................................................................................... 27
4.3 Reduction of Soil Properties due to Cyclic Loading ..................................................27
4.3.1 Reduction of Undrained Shear Strength ...................................................... 27
4.3.2 Reduction of Soil Stiffness ........................................................................... 27
4.4 Subsoil Properties ...................................................................................................29
TWJO-1-TCD-ST1-0004-Rev B
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
TWJO-1-TCD-ST1-0004-Rev B
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
APPENDICES
Appendix A : Geological Profile at CP102 Cipete Raya Station
Appendix B : Site Zoning and SPT-N Design Line
Appendix C : Pile Schedule
Appendix D : Calculation Sheet for Pile Axial Bearing Capacity
Appendix E : Summary of pile Settlement
Appendix F : List of Relevant Drawings
Appendix G : List of Reference Drawings
Appendix H : List of standards & codes
Appendix I : Loading Plan Drawing
Appendix J : Design Calculation of Pile & Pile Cap
List of Tables
Table 1 - Design Package Affiliation ...................................................................................... 1
Table 2 – Summary of Load Combinations ...........................................................................16
Table 3 – STAAD mass participation table ...........................................................................17
Table 4 – Drift Displacements from STAAD and amplified values in longitudinal direction ....20
Table 5 – comparison of displacements with inter-storey drift limits ......................................21
Table 6 – Drift Displacements from STAAD and amplified values in Transverse direction ....23
Table 7 – comparison of displacements with inter-storey drift limits ......................................24
Table 8 - Recommended Geotechnical Design Parameters .................................................29
Table 9 - List of published studies on Vs to SPT-N correlations............................................30
Table 10 - Site Zoning ..........................................................................................................30
Table 11 - Minimum Factor of Safety for Design ...................................................................33
Table 12 - Bored Pile Design Parameters* ...........................................................................34
Table 13 - Summary of Design Pile Length ..........................................................................40
Table 14 – Typical axial loads & moments for pile design.....................................................42
Table 15 – Typical analysis results of pile design .................................................................43
Table 16- Design moments in Pile Cap ................................................................................44
Table 17 – Stress Check from OASYS .................................................................................44
Table 18 – Recommended Allowable Settlement for Buildings*............................................47
Table 19 – Summary of Pile Settlement ...............................................................................49
List of Figures
Figure 1 – Typical section at the pier location of entire station ............................................... 2
Figure 2 – Typical platform layout of station. ......................................................................... 2
Figure 3 – Typical Section of Box Girder with Rail Plinth & Rolling Stock .............................. 3
Figure 4 – Typical Section at pier location supporting viaduct & precast girders. ................... 3
Figure 5 – Typical Plan at pier location supporting viaduct & precast girders ......................... 3
Figure 6 – Typical Elevation at pier location supporting viaduct & precast girders ................. 4
Figure 7 – Concourse floor layout of Lebak Bulus Station ..................................................... 4
Figure 8 – Column Layout at Ground Level ........................................................................... 5
Figure 9 – Beam Frame layout at Concourse Level ............................................................... 5
TWJO-1-TCD-ST1-0004-Rev B
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
TWJO-1-TCD-ST1-0004-Rev B
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
1. INTRODUCTION
The proposed rail based Jakarta Mass Rapid Transit (MRT) will consist of South-
North and East West Corridors. The construction of the South-North Corridor will be
completed in two stages. Stage 1 will be carried out to connect Cipete Raya with
Bunderan HI which comprises 15.7km of twin track rails, of which 4.8km passes
through twin tunnels with the remainder supported on elevated viaducts. There are
13 stations in total, of which 6 are underground, including a fully functional depot
covering approximately 8.3 hectares. Stage 2 will expand the South-North corridor
from Bunderan HI to Kampung Bandan.
Stage 1 of the project is divided into six civil contract packages (CP), in which
CP101 to CP103 are elevated sections and CP104 to CP106 are underground
section. There are two other contract packages; CP107 for the track work and
CP108 for the rolling stock.
CP101 and CP102 are the contract packages relevant to the elevated sections.
These comprise three elevated stations (lebak bulus, Fatmawati and Cipete Raya),
a depot, approach structures and a viaduct structure of approximately 5.95 km,
which stretches from chainage -0K576m714 to +5K369m249. From the depot at
Jalan Pasar Jumat, the alignment follows Jalan Kartini and Jalan Cipete Raya to the
north and towards the contract boundary with CP103 at the southern end of Haji
Nawi Station.
This report describes the structural and geotechnical design methodology of the
foundations for the Lebak Bulus Station of CP101 contract package.
The design of following structural elements is covered in this report
Bored Pile Foundation for Lebak Bulus Station
Pile Cap reinforcement design for Lebak Bulus Station.
Figure 3 – Typical Section of Box Girder with Rail Plinth & Rolling Stock
The platform level is supported via a cross pier head protruding from the main pier.
It is proposed that the tracks be made independent from the platform in order to
avoid continual vibrations being transferred to the main frame of station. This cross
arm pier head shall support precast girders as shown in the section below on both
sides.
Figure 4 – Typical Section at pier location supporting viaduct & precast girders.
Figure 5 – Typical Plan at pier location supporting viaduct & precast girders
Figure 6 – Typical Elevation at pier location supporting viaduct & precast girders
The platform slab shall be supported over these precast girders. The precast girders
are currently proposed with I sections and shall support the platform hollow core
slab and a 75mm concrete topping to provide in for a diaphragm type action in the
transverse direction. Further, the precast girders are proposed to be supported on
temporary steel work as shown in the above picture. Thereafter the central core
between the two girders & above the cross pier head shall be cast in cast – in – situ
concrete to provide a continuous junction. The reinforcement for negative moment
at this location shall be provided in the top 270mm cast – in – situ concrete.
A main concourse level is proposed beneath the main box girder to carry the
services pertaining to the station. The width of concourse is 22.3m. The columns
from concourse level to platform level only run on grid A & C of station as shown in
figure below.
2.3 Loadings
The basic loads & load combinations as defined in design manual have been
described and compared with relevant counterparts of Indonesian standard and it is
described that by adhering to the design manual parameter & EC8 guidelines a
conservative design has been envisaged.
2.3.1 Dead Load
The dead load of structure from various components can be described as follows:
Futher as per ACI the cracked inertia of RCC members may be taken as 70% of the gross inertia.
Therefore effective differential temperature for which the structure should be designed becomes
t= 2.08 x 0.7 = 1.46 o C for temp. rise & shrinkage With full
t= -14.58 x 0.7 = -10.21 o C for temp. fall & shrinkage value of E
X Z X Z
0° 0.86 11 7.568
90° -1.3 11 -11.44
0° 0.59 12.5 5.9
90° -1.3 12.5 -13
0° 0.85 11 7.48
90° -0.6 11 -5.28
0° 0.68 12.5 6.8
90° -0.4 12.5 -4
Note : Pressure Coefficient are taken from BS 6399-2:1997 (Table 26 & Table 37)
k) Seismic Performance I
Function of structure is retained without conducting repair after an earthquake, and
no excessive displacement occurs.
l) Seismic Performance II
Repair may be required after an earthquake, but function of structure can be
restored within a short period.
The damage levels of reinforced concrete structures are defined in regards to the
load-displacement curve of the structure. The load-displacement relationship of
reinforced concrete columns subjected to moderate axial force for which the failure
mode is expected to be in flexure is similar to the curve shown in Figure 11.
Damage Level 1
Longitudinal reinforcement yield point is set as the limit for damage level 1. This is
shown by point B on the graph. It is expected that within this limit no extensive
repair will be necessary for the structure as the structure will remain essentially
elastic. Durability of structure however should be ensured as the structure has
suffered cracking.
Damage Level 2
The maximum capacity point (point C on graph) is set as the limit for damage level
2. At this point the longitudinal reinforcement has passed the yield point and the
cracks are wider. Crack injection and/or patching may be necessary.
Damage Level 3
The limit is set at the maximum displacement with no reduction in yield capacity
(point D). At this point it is expected that further displacement will occur without any
increase in capacity. The repair method is expected to include patching of spalled
concrete and remediation of ties.
For MDE, in accordance with EC8, the following response reduction factor is used:-
For I = 1, R = 1.68,
For I = 1.4, R = 2.35.
In line of the details specified above a graphical representation of spectrums is
compared and shown below. The graph compares the ODE, MDE spectrums with
the reduced spectrum for nominal earthquake as per SNI1726: 2012 with different
Response reduction factor as per SNI1726.
0.70
SNI 1726 Design Spectrum
0.60
ODE - Soil Profile - A
0.50
Spectral Acceleration
0.20
0.10
0.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Time Period
1
SNI 1726 Design Spectrum * 1.5
0.9
MDE - Soil Profile A
0.8
SNI 1726 * 1.5 / (RRF = 8/Ie = 1.25)
Spectral Acceleration (g)
0.7
SNI 1726*1.5 / (RRF = 5 /Ie = 1.25)
0.6
MDE / (RRF 2.37/ I = 1.4)
0.5
0.4
0.3
0.2
0.1
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00
Time Period
Further it can also be seen that as defined earlier the Reduction factor of 2.35 with
Importance factor of 1.4 resulting in net reduction of MDE spectrum by 1.68 can be
further used to decrease the MDE design spectrum to provide for an economic
design. Please note that even after this reduction this MDE spectrum still is higher
that the Ultimate earthquake spectrum with reduction factors of either 5 or 8.
In conclusion, for the seismic loading conditions, using the ODE and MDE response
spectrum and criterion as directed by the “Supplemental Design Specification to
ODS 15: Seismic Loading” issued by the Engineer is more onerous than the
response spectrum from SNI1726:2012 as can be seen from Figure 13 and Figure
14.
From the table, under normal conditions the serviceability and ultimate limit state for
the load combination using the British code is more onerous. For the seismic
condition, ODE conditions, EC8 is more onerous. However, for MDE, based on load
combination factor, SNI is more onerous, but due to the higher response factor (E),
the design in accordance with EC8 is more onerous.
3. STRUCTURAL ANALYSIS
3.1 Seismic Response of structure
Response Spectrum Analysis is adopted to analyze the behavior of the entire
structure during a seismic event. This approach permits the multiple modes of
response of a structure to be taken into account. This is required in many building
codes for all except for very simple or very complex structures. The response of a
structure can be defined as a combination of many mode shapes. In this analysis,
STAAD Pro software is used to determine these modes for a structure. For each
mode, a response is read from the design spectrum, two design spectrums i.e. ODE
and MDE. It is based on the modal frequency and the modal mass, and they are
further combined to provide an estimate of the total response of the structure.
Combination methods include the complete quadratic combination (CQC).
TWJO-1-TCD-ST1-0004-Rev B PAGE 17 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
TWJO-1-TCD-ST1-0004-Rev B PAGE 18 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
With the site specific spectrum since we are following a reduction factor of 2.37 with
Importance factor 1.4 we should alter this amplification factor in proportionality to
make it on the same grounds for SNI1726:2012.
Mass center deflection on level x (δx) (mm) must be determined in accordance with
following equation:
𝐶𝑑 𝛿𝑥𝑒
𝛿𝑥 =
𝐼𝑒
Annotation:
Cd = deflection amplification factor in Table 9
δxe = deflection on required location in this article that determined by elastic
analysis
Ie = earthquake significance factor that determined in accordance with 4.1.2 of
SNI 1726:2012.
SNI 1726:2012 Design value
Design Spectrum (Sa/g) (Sa/g)SNI 1726:2012 (Sa/g)SOIL PROFILE A - MDE
Load Combination Factor 1.5 1.0
Importance Factor 1.5 1.4
Response Reduction 8.0 2.35
Factor
Deflection Amplification 5.5 To be evaluated (X)
factor
TWJO-1-TCD-ST1-0004-Rev B PAGE 19 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
For,
Time period (T) = 1.39604 seconds
(Sa/g)SNI 1726:2012 = 0.765 (including FOS = 1.5)
(Sa/g)SOIL PROFILE A – MDE = 0.33408
Hence
X = (0.765 * 1.5 * 5.5 / 8.0)/ (.33408*1.4/2.35) = 4.373 say 4.40
Following table gives the nodal displacements at different level including ground,
their amplified values and relative displacement between the floors compared to the
limits.
Table 4 – Drift Displacements from STAAD and amplified values in longitudinal
direction
Magnified Magnified
Nodal Drift Displacement Nodal Drift Displacement
from STAAD at lower from STAAD, at upper
δe2 concourse δe3 concourse
level, δ2 level, δ3
mm mm mm mm
51.988 152.50 72.981 214.08
52.587 154.26 73.361 215.19
50.194 147.24 73.183 214.67
52.628 154.38 73.087 214.39
49.907 146.39 73.166 214.62
52.669 154.50 73.019 214.19
49.991 146.64 73.144 214.56
52.764 154.77 73.121 214.49
49.853 146.24 73.378 215.24
53.356 156.51 73.406 215.32
50.200 147.25 73.632 215.99
53.483 156.88 73.526 215.68
50.178 147.19 73.627 215.97
53.189 156.02 73.466 215.50
50.201 147.26 73.605 215.91
53.137 155.87 73.491 215.57
50.302 147.55 73.598 215.89
TWJO-1-TCD-ST1-0004-Rev B PAGE 20 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
TWJO-1-TCD-ST1-0004-Rev B PAGE 21 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
TWJO-1-TCD-ST1-0004-Rev B PAGE 22 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
Magnified Magnified
Nodal Drift Displacement Nodal Drift Displacement
from STAAD at lower from STAAD, at upper
δe2 concourse δe3 concourse
level, δ2 level, δ3
mm mm mm mm
67.493 112.49 93.379 155.63
66.652 111.09 91.917 153.20
61.662 102.77 93.408 155.68
67.069 111.78 93.024 155.04
61.248 102.08 92.808 154.68
66.510 110.85 92.115 153.53
60.290 100.48 91.701 152.84
65.962 109.94 91.220 152.03
59.851 99.75 91.436 152.39
66.475 110.79 91.435 152.39
60.546 100.91 91.807 153.01
67.087 111.81 91.720 152.87
60.311 100.52 91.576 152.63
65.838 109.73 91.207 152.01
59.867 99.78 91.489 152.48
66.129 110.22 91.669 152.78
60.774 101.29 92.050 153.42
61.335 102.23 93.442 155.74
60.412 100.69 91.978 153.30
58.952 98.25 93.414 155.69
60.801 101.34 93.088 155.15
58.569 97.62 92.821 154.70
60.240 100.40 92.185 153.64
58.004 96.67 91.640 152.73
59.464 99.11 91.227 152.05
58.192 96.99 91.431 152.39
59.904 99.84 91.536 152.56
57.547 95.91 91.786 152.98
TWJO-1-TCD-ST1-0004-Rev B PAGE 23 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
TWJO-1-TCD-ST1-0004-Rev B PAGE 24 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
TWJO-1-TCD-ST1-0004-Rev B PAGE 25 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
4. SUBSOIL CONDITIONS
4.1 Stratification
The subsoil encountered at the Cipete Raya Station site generally consists of the
Alluvial Fan (Unit Qav) and the Bojongmanik Formation (Unit Tmb) as shown below.
The stratification of the project site can be found in Appendix A.
Detailed information of geotechnical condition at the project site is described in
Geotechnical Interpretative Report ((TWJO-CP12-TCD-DSR-0001-Rev 2)).
TWJO-1-TCD-ST1-0004-Rev B PAGE 26 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
TWJO-1-TCD-ST1-0004-Rev B PAGE 27 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
TWJO-1-TCD-ST1-0004-Rev B PAGE 28 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak bulus Station Foundation Design
a d
Based on Stroud (1989) Based on Toha and Sengara (2009)
b e
Based on Bjerrum and Simons (1960) Based on Casagrande (1938)
c f
Based on Peck et al. (1974) Based on common correlation of c’ = 0.2 N (using average SPT-N of 30 for AC3 and 50 for TC)
TWJO-1-TCD-ST1-0004-Rev B PAGE 29 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
TWJO-1-TCD-ST1-0004-Rev B PAGE 30 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Vs (m/s)
100 150 200 250 300 350
0
10
Depth below Ground Level (mbgl)
15
20
25
30
35
40
Group A (Layer A thickness <=10m)
Group B (Layer A thickness = 10-15m)
45
Group C (Layer A thickness > 15m)
50
TWJO-1-TCD-ST1-0004-Rev B PAGE 31 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
0.4
Spectral Acceleration (g)
0.4
0.3
0.2
0.2
0.1
0.1
0.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 3.8 4.0
Period (sec)
Figure 21 - Design Spectra for ODE case
1.0
Design Spectra - Group A
Design Spectra - Group B
0.9
Design Spectra - Group C
0.8
Spectral Acceleration (g)
0.7
0.6
0.4
0.3
0.2
0.1
0.0
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4 2.6 2.8 3.0 3.2 3.4 3.6 3.8 4.0
Period (sec)
Figure 22 - Design Spectra for MDE case
TWJO-1-TCD-ST1-0004-Rev B PAGE 32 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
The value of ultimate bearing capacity, Qu, unit frictional resistance, fs, and unit base
resistance, qb, can be determined by following.
c) Ultimate Bearing Capacity
The ultimate geotechnical bearing capacity for compression pile is given by the
following equation:
Qu = Qsp + Qb
= fs As + qb Ab
where:
Qsp : is the ultimate positive shaft resistance
Qb : is the ultimate end bearing resistance
fs : is the average skin friction or adhesion per unit area of the shaft at
the condition of full mobilization of frictional resistance;
TWJO-1-TCD-ST1-0004-Rev B PAGE 33 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
qb : is the ultimate value of the resistance per unit area of base due to the
shearing strength of the soil;
As : is the surface of the pile shaft;
Ab : is the plan area of the base.
TWJO-1-TCD-ST1-0004-Rev B PAGE 34 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Figure 23 – Bearing capacity factor (after Meyerhof) and shape factor (Meyerhof-
Skempton
TWJO-1-TCD-ST1-0004-Rev B PAGE 35 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Based on the analysis, the ultimate bearing capacity of the soil block is significantly
higher than the sum of working load on the pile groups.
TWJO-1-TCD-ST1-0004-Rev B PAGE 36 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
TWJO-1-TCD-ST1-0004-Rev B PAGE 37 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Figure 25 – Idealized variation of limiting resistance with depth (after Fleming et al,
2009)
12 𝐸𝑠 𝐵 4 𝐸𝑠
𝑘 ′ 𝑠 = 0.65 √
𝐸𝑓 𝐼𝑓 1 − 𝜇2
where,
k’s : modulus of subgrade reaction, in units of Es,
Es and Ef : modulus of soil and foundation structures, respectively; inconsistent
units,
B and If : foundation width and its moment of inertia based on cross section;
inconsistent units,
: Poisson ratio of soil.
TWJO-1-TCD-ST1-0004-Rev B PAGE 38 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
8. Design of Foundation
TWJO-1-TCD-ST1-0004-Rev B PAGE 39 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
TWJO-1-TCD-ST1-0004-Rev B PAGE 40 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
TWJO-1-TCD-ST1-0004-Rev B PAGE 41 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
27 L27 2241 90
28 L28 2507 79
29 L29 2062 65
30 L30 1642 5
31 L31 2241 131
32 L32 2507 103
33 L33 1642 12
34 L34 2062 91
35 L35 2241 131
36 L36 2507 103
1
The negative values depicted in here refer to the tensile force in piles.
TWJO-1-TCD-ST1-0004-Rev B PAGE 42 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
SLS Stresses
Permissible Stresses Concrete 0.5fcu 20.000 Mpa
Steel 0.75fy 292.500 Mpa
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)
Stress in
Stress in Concrete
Case Reinforcement
[N/mm²] [N/mm²]
Maxima 2.63 OK 17.92 OK
Minima 1.141 OK 8.637 OK
TWJO-1-TCD-ST1-0004-Rev B PAGE 43 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Moment in
Pile Cap
1 2
Lever arm
3 4
PIER
PILE
LOAD
TWJO-1-TCD-ST1-0004-Rev B PAGE 44 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
The lateral or longitudinal deflections of entire structure have been depicted under
MDE conditions. The values are well acceptable under inter storey drift limits.
Lateral Displacement
No. of Pile at Pile Top (mm)
S. No. Column No(s). Piles / Diameter
Column (m) ODE
X Z
1 C1 1 1.0 29.612 39.675
2 C2 1 1.0 31.203 37.846
3 C3 1 1.0 30.285 39.29
4 C4 1 1.0 30.431 37.602
5 C5 1 1.0 29.946 38.93
6 C6 1 1.0 28.555 37.254
7 C7 1 1.0 32.231 38.405
8 C8 1 1.0 30.578 37.419
9 C9 1 1.0 30.345 38.726
10 C10 1 1.0 32.098 36.906
11 C11 1 1.0 31.568 38.344
12 C12 1 1.0 32.353 37.758
13 C13 1 1.0 30.113 36.313
14 C14 1 1.0 31.554 35.297
15 C15 1 1.0 31.659 38.495
16 C16 1 1.0 32.003 37.387
17 C17 1 1.0 30.209 39.079
18 C18 4 1.2 40.315 50.088
TWJO-1-TCD-ST1-0004-Rev B PAGE 45 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
TWJO-1-TCD-ST1-0004-Rev B PAGE 46 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
9. SETTLEMENT OF PILES
TWJO-1-TCD-ST1-0004-Rev B PAGE 47 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
𝑅𝑠 = 𝑛𝜔
Where n is the number of piles and is an exponent which lies between 0.4 and 0.6
for most pile groups.
TWJO-1-TCD-ST1-0004-Rev B PAGE 48 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
C52, C54
to C56 &
1 1000 1 ABH-4 1.3 0.0 C
C58 to
C60
C25, C27,
C29 & 1 1000 1 ABH-4 2.3 0.0 D
C31
C19, C21
1 1000 1 ABH-4 2.6 0.0 E
& C23
C17 &
1 1000 1 ABH-4 3.8 0.0 F
C51
C5, C6 &
1 1000 1 ABH-4 3.8 0.0 F
C39
C2, C3,
C4, C36,
1 1000 1 ABH-4 3.8 0.0 F
C37 &
C38
TWJO-1-TCD-ST1-0004-Rev B PAGE 49 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
C7, C9 to
C12 & 1 1000 1 ABH-4 5.0 0.0 G
C14
C15, C16,
C49 & 1 1000 1 ABH-4 5.9 0.0 H
C50
C41, C44,
C46 & 1 1200 1 ABH-4 3.1 0.0 J
C47
C42, C43,
C45 & 1 1200 1 ABH-4 3.5 0.0 K
C48
C24, C26,
C28 & 4 1200 1 ABH-4 2.4 4.8 M
C30
C20 &
4 1200 1 ABH-4 2.7 5.4 N
C22
TWJO-1-TCD-ST1-0004-Rev B PAGE 50 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
TWJO-1-TCD-ST1-0004-Rev B PAGE 51 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
TWJO-1-TCD-ST1-0004-Rev B PAGE 52 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
10. CONCLUSION
All edge grid columns (along grids A & C) are founded on 1000/1200mm diameter
bored mono piles. Along grid B, viaduct-supporting columns are founded on groups
of four 1200mm diameter bored piles each, and the rest of the columns are founded
on 1200mm diameter piles. The design pile loads are summarized below.
The diameter and no. of piles to be provided for each column has been deciphered
based on the above loads and the available pile capacities. The moments from
STAAD PRO have been combined with these axial effects to design the
reinforcement for each pile using OASYS. The design calculations have been
attached with this report as appendices.
Factor of safety for axial bearing capacity of pile foundation has been designed to
comply with BS 8004 and Jakarta’s regulation of Structural and Geotechnical Design
Guidelines for Buildings (Dinas Penataan dan Pengawasan Bangunan DKI Jakarta,
2007).
Allowable lateral displacements for piles is designed be consistent with the function
and type of structure, the anticipated service life, and the consequences of
unacceptable displacements on the performance of the structure.
The anticipated total and differential pile settlement due to soil conditions are
designed to be less that those values considered in the design of the structure for
serviceability. There would be negligible consolidation settlement of the group since
the piles in groups are designed to be embedded in hard soils (SPT-N > 50), and no
soft to stiff compressible clay layer found in 3 times of pile group length below the
pile toe.
TWJO-1-TCD-ST1-0004-Rev B PAGE 53 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
11. REFERENCES
TWJO-1-TCD-ST1-0004-Rev B PAGE 54 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
19) Stroud, M A (1989). The Standard Penetration Test – Its Application and
Interpretation, Proceedings of ICE Conference, Birmingham.
20) Toha, F.X. and Sengara, I.W. (2009). Consolidation Settlements of Deep Clay
Layers under High Rise Buildings in Jakarta, Development of Geotechnical
Engineering in Civil Construction, Bali, Indonesia, pp 22-36.
21) Tomlinson, M.J., (1994). Pile Design and Construction Practice, 4th Ed., Taylor
& Francis, Oxon.
22) Vesic, A. S. (1961a). Bending Beams Resting on Isotropic Elastic Solid, Jour.
Eng. Mech. Division, ASCE, vol. 87, EM 2, April, pp. 35-53.
23) Vesic, A. S. (1961b). Beams on Elastic Subgrade and the Winkler’s Hypothesis,
5th ICSMFE, vil 1, pp. 845-850.
TWJO-1-TCD-ST1-0004-Rev B PAGE 55 / 55
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Appendix A
TWJO-1-TCD-ST1-0004-Rev B Appendix A
E-100
1ABH-4 1ABH-6 E-140
1ABH-5
1ABH-3 E-150
1ABH-2
E-110 Gate House
Fence(Type1)
Shop in Track
E-120
E-130
AE-03 (Gantry Crane)
(Stock Yard) CO
AE-04 NC
RE
T
AE-02 Back Gate
E
Car Parking
Motorbike Parking2 (Space for future)
1AD-8
Fence(Type1)
Workshop Main Building
AE-01 D-110 Fence(Type1)
Workshop
Emergency Exit Office
Building
Site Administration Car Garage1 Fuel Tank
Office
Car Parking Car Parking
9. -1
7. -2
9. -3
8. -4
6. -6
9. -5
6. 1
0. 2
+3 100
+3 110
+3 120
+2 B H
+3 B H
+3 B H
+3 B H
+2 E-0
+3 E-0
+3 B H
8
+3 B H
32
67
+3 130
+3 140
+3 150
3
29
92
50
12
51
36
83
4
51
1A
1A
1A
1A
41
E-
E-
E-
61
61
58
1A
A
1A
5.
4.
8.
E-
E-
E-
9.
5.
7.
NOTES:
Appendix B
TWJO-1-TCD-ST1-0004-Rev B Appendix B
SPT-N Value
0 5 10 15 20 25 30 35 40 45 50 55 60
0
10
15
Depth below Ground Level (mbgl)
20
25
30
35
40 E-120
1ABH4
1ABH5
45
Moderately Conservative Design Line
50
Oct-14
SOIL LATERAL SPRING CONSTANT - LEBAK BULUS STATION
Appendix C
Pile Schedule
TWJO-1-TCD-ST1-0004-Rev B Appendix C
PILE SCHEDULE FOR STATIONS
SUMMARY_ LEBAK BULUS STATION
BORED PILE SCHEDULE
STATIC WORKING LOAD / PILE ODE LOAD / PILE MDE LOAD / PILE MIN. PILE SOCKET
MIN PILE
PILE NEGATIVE SKIN PILE CUT-OFF MIN. PILE LENGTH INTO
NO. OF BOREHOLE LENGTH
COLUMN NO. DIAMETER FRICTION LEVEL TOE LEVEL BEARING LAYER
PILES REFERENCE COMPRESSION TENSION COMPRESSION TENSION COMPRESSION TENSION (FROM COL)
SPT-N > 50
(mm) (kN) (kN) (kN) (kN) (kN) (kN) (kN) (mRL) (mRL) (m) (m)
PG1B 1 1.0 1 ABH-4 692 - 802 - 1150 - 0 35.275 24.275 11.0 0.0
C53 1 1.0 1 ABH-4 1121 - 3217 1270 3948 1694 0 35.275 13.775 21.5 0.0
C57 1 1.0 1 ABH-4 2132 - 4054 718 6757 2271 0 35.275 11.275 24.0 1.1
C52, C54 to C56 &
1 1.0 1 ABH-4 2293 - 3642 - 5740 687 0 35.275 11.275 24.0 1.1
C58 to C60
C25, C27, C29 & C31 1 1.0 1 ABH-4 3633 - 3633 - 4307 - 0 35.275 8.775 26.5 3.6
C33 1 1.0 1 ABH-4 3671 - 3671 - 4476 - 0 35.275 8.775 26.5 3.6
C1 & C35 1 1.0 1 ABH-4 3781 - 4528 - 5425 - 0 35.275 8.775 26.5 3.6
C19, C21 & C23 1 1.0 1 ABH-4 4157 - 4157 - 5203 - 0 35.275 7.275 28.0 5.1
C17 & C51 1 1.0 1 ABH-4 4947 - 6086 - 7210 - 0 35.275 2.775 32.5 9.6
C5, C6 & C39 1 1.0 1 ABH-4 5047 - 6278 - 8851 - 0 35.275 2.775 32.5 9.6
C8 & C13 1 1.0 1 ABH-4 5089 - 5376 - 6378 - 0 35.275 2.775 32.5 9.6
C7, C9 to C12 & C14 1 1.0 1 ABH-4 6076 - 7004 - 8260 - 0 35.275 -0.725 36.0 13.1
C15, C16, C49 & C50 1 1.0 1 ABH-4 6618 - 7175 - 8401 - 0 35.275 -3.725 39.0 16.1
C40 1 1.2 1 ABH-4 5105 - 5105 - 6149 - 0 34.975 6.975 28.0 5.4
C41, C44, C46 & C47 1 1.2 1 ABH-4 6137 - 6848 - 10153 - 0 34.975 3.475 31.5 8.9
C42, C43, C45 & C48 1 1.2 1 ABH-4 6673 - 7925 - 10764 - 0 34.975 1.975 33.0 10.4
PG2A 2 1.2 1 ABH-4 2507 - 5870 2277 7204 3053 0 34.975 8.975 26.0 3.4
PG2 2 1.2 1 ABH-4 2761 - 5427 1963 7594 3570 0 34.975 8.975 26.0 3.4
C34 4 1.2 1 ABH-4 4613 - 8284 1863 10294 2608 0 34.975 3.975 31.0 8.4
C18 4 1.2 1 ABH-4 4789 - 8364 1912 11226 3480 0 34.975 3.975 31.0 8.4
C24, C26, C28 & C30 4 1.2 1 ABH-4 4869 - 8397 1859 10423 2826 0 34.975 3.975 31.0 8.4
C32 4 1.2 1 ABH-4 5189 - 8709 1516 10697 2224 0 34.975 2.475 32.5 9.9
C20 & C22 4 1.2 1 ABH-4 5219 - 8500 1803 11299 2558 0 34.975 2.475 32.5 9.9
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Appendix D
TWJO-1-TCD-ST1-0004-Rev B Appendix D
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category: 1x1000 Load Category: A
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
w : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : 24.28 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 24.28 37 0.1 148 148 41 41 1
B) END BEARING
Pile Depth 11.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe AC3 Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 45
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 1,303 745 947 3,188 496 710 947
E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 745 kN Static (kN) 692 OK 0
ODE 947 kN ODE (kN) 802 OK 0
MDE 3,188 kN MDE (kN) 1150 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category: 1x1000 Load Category: A
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) 2
+2 (1 )
= +
2 4
B) END BEARING
Pile Depth 21.5 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TS Unit End Bearing 3000 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 60
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 2,949 2,508 3,298 7,303 1,672 2,473 3,298
E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 2,508 kN Static (kN) 1121 OK 0
ODE 3,298 kN ODE (kN) 3217 OK 1270 OK
MDE 7,303 kN MDE (kN) 3948 OK 1694 OK
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category : 1x1000 Load Category: B
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) 2
+2 (1 )
= +
2 4
B) END BEARING
Pile Depth 24.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 45
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 3,298 3,239 4,274 8,178 2,160 3,205 4,274
E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 3,239 kN Static (kN) 2293 OK 0
ODE 4,274 kN ODE (kN) 4054 OK 718 OK
MDE 8,178 kN MDE (kN) 6757 OK 2271 OK
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category : 1x1000 Load Category: C
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) 2
+2 (1 )
= +
2 4
B) END BEARING
Pile Depth 26.5 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 45
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 3,797 3,863 5,105 9,425 2,575 3,829 5,105
E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 3,797 kN Static (kN) 3781 OK 0
ODE 5,105 kN ODE (kN) 4528 OK 0
MDE 9,425 kN MDE (kN) 5425 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category : 1x1000 Load Category: D
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) 2
+2 (1 )
= +
2 4
B) END BEARING
Pile Depth 28.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 45
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 4,165 4,323 5,718 10,344 2,882 4,288 5,718
E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 4,165 kN Static (kN) 4157 OK 0
ODE 5,718 kN ODE (kN) 4157 OK 0
MDE 10,344 kN MDE (kN) 5203 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category : 1x1000 Load Category: E
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) 2
+2 (1 )
= +
2 4
Load in the pile shaft Ws 4,157 kN
Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 0.79 m²
Cross-sectional area of the base Ab 0.79 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 28.0 m
Pile width B 1.00 m
Poisson’s ratio of the soil 0.3
Influence factor related to the ratio of L/B IP 0.8
Site Location : Lebak Bulus station Pile Group Category : 1x1000 Load Category: F
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
w : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : 2.78 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 22.36 37 2.0 148 148 930 930 1
AC3 22.36 21.91 47 0.4 188 188 266 266 1
AC3 21.91 16.86 16.5 5.1 66 66 1,047 1,047 1
TS 16.86 13.36 45.5 3.5 137 137 1,501 1,501 1
TC 13.36 12.36 48 1.0 192 192 603 603 1
TC 12.36 11.36 50 1.0 200 200 628 628 1
TS 11.36 9.36 50 2.0 150 150 942 942 1
TC 9.36 2.78 48.75 6.6 195 195 4,036 4,036 1
B) END BEARING
Pile Depth 32.5 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 45
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 5,268 5,701 7,556 13,101 3,801 5,667 7,556
E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 5,268 kN Static (kN) 5180 OK 0
ODE 7,556 kN ODE (kN) 6278 OK 0
MDE 12,566 kN MDE (kN) 8851 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category : 1x1000 Load Category: F
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) 2
+2 (1 )
= +
2 4
Site Location : Lebak Bulus station Pile Group Category :1x1000 Load Category: G
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
w : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : -0.73 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 22.36 37 2.0 148 148 930 930 1
AC3 22.36 21.91 47 0.4 188 188 266 266 1
AC3 21.91 16.86 16.5 5.1 66 66 1,047 1,047 1
TS 16.86 13.36 45.5 3.5 137 137 1,501 1,501 1
TC 13.36 12.36 48 1.0 192 192 603 603 1
TC 12.36 11.36 50 1.0 200 200 628 628 1
TS 11.36 9.36 50 2.0 150 150 942 942 1
TC 9.36 2.36 48.75 7.0 195 195 4,288 4,288 1
TS 2.36 -0.73 45.25 3.1 136 136 1,317 1,317 1
B) END BEARING
Pile Depth 36.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TS Unit End Bearing 3000 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 60
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 6,131 6,486 8,602 15,259 4,324 6,451 8,602
E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 6,131 kN Static (kN) 6076 OK 0
ODE 7,854 kN ODE (kN) 7004 OK 0
MDE 12,566 kN MDE (kN) 8260 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category : 1x1000 Load Category: G
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) (1 2)
+2
= +
2 4
Site Location : Lebak Bulus station Pile Group Category : 1x1000 Load Category: H
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
w : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : -3.73 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 22.36 37 2.0 148 148 930 930 1
AC3 22.36 21.91 47 0.4 188 188 266 266 1
AC3 21.91 16.86 16.5 5.1 66 66 1,047 1,047 1
TS 16.86 13.36 45.5 3.5 137 137 1,501 1,501 1
TC 13.36 12.36 48 1.0 192 192 603 603 1
TC 12.36 11.36 50 1.0 200 200 628 628 1
TS 11.36 9.36 50 2.0 150 150 942 942 1
TC 9.36 2.36 48.75 7.0 195 195 4,288 4,288 1
TS 2.36 -3.73 45.25 6.1 136 136 2,597 2,597 1
B) END BEARING
Pile Depth 39.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TS Unit End Bearing 3000 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 0.79 m²
End Bearing Multiplier 60
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 6,643 7,125 9,455 16,538 4,750 7,091 9,455
E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 6,643 kN Static (kN) 6618 OK 0
ODE 7,854 kN ODE (kN) 7175 OK 0
MDE 12,566 kN MDE (kN) 8401 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category : 1x1000 Load Category: H
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) 2
+2 (1 )
= +
2 4
Site Location : Lebak Bulus station Pile Group Category:1x1200 Load Category: I
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.20 m
w : 9.8 kN/m3 Pile Cut-off Level : 34.975 mRL
Pile Toe Level : 6.98 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 34.98 28.36 3.5 6.6 16 13 393 314 1
AC3 28.36 24.36 22 4.0 88 88 1,327 1,327 1
AC3 24.36 22.36 37 2.0 148 148 1,116 1,116 1
AC3 22.36 21.91 47 0.4 188 188 319 319 1
AC3 21.91 16.86 16.5 5.1 66 66 1,257 1,257 1
TS 16.86 13.36 45.5 3.5 137 137 1,801 1,801 1
TC 13.36 12.36 48 1.0 192 192 724 724 1
TC 12.36 11.36 50 1.0 200 200 754 754 1
TS 11.36 9.36 50 2.0 150 150 1,131 1,131 1
TC 9.36 6.98 48.75 2.4 195 195 1,756 1,756 1
B) END BEARING
Pile Depth 28.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 1.13 m²
End Bearing Multiplier 45
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 5,249 5,288 6,999 13,043 3,526 5,249 6,999
E) STRUCTURAL CAPACITY
Static 11,310 kN
ODE 11,310 kN
MDE 18,096 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 5,249 kN Static (kN) 5105 OK 0
ODE 6,999 kN ODE (kN) 5105 OK 0
MDE 13,043 kN MDE (kN) 6149 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category: 1x1200 Load Category: I
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) (1 2)
+2
= +
2 4
B) END BEARING
Pile Depth 31.5 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 1.13 m²
End Bearing Multiplier 45
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 6,278 6,575 8,714 15,616 4,383 6,536 8,714
E) STRUCTURAL CAPACITY
Static 11,310 kN
ODE 11,310 kN
MDE 18,096 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 6,278 kN Static (kN) 6137 OK 0
ODE 8,714 kN ODE (kN) 6848 OK 0
MDE 15,616 kN MDE (kN) 10153 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category : 1x1200 Load Category: J
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) 2
+2 (1 )
= +
2 4
Site Location : Lebak Bulus station Pile Group Category: 1x1200 Load Category: K
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.20 m
w : 9.8 kN/m3 Pile Cut-off Level : 34.975 mRL
Pile Toe Level : 1.98 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 34.98 28.36 3.5 6.6 16 13 393 314 1
AC3 28.36 24.36 22 4.0 88 88 1,327 1,327 1
AC3 24.36 22.36 37 2.0 148 148 1,116 1,116 1
AC3 22.36 21.91 47 0.4 188 188 319 319 1
AC3 21.91 16.86 16.5 5.1 66 66 1,257 1,257 1
TS 16.86 13.36 45.5 3.5 137 137 1,801 1,801 1
TC 13.36 12.36 48 1.0 192 192 724 724 1
TC 12.36 11.36 50 1.0 200 200 754 754 1
TS 11.36 9.36 50 2.0 150 150 1,131 1,131 1
TC 9.36 2.36 48.75 7.0 195 195 5,146 5,146 1
TS 2.36 1.98 45.25 0.4 136 136 199 199 1
B) END BEARING
Pile Depth 33.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TS Unit End Bearing 3000 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 1.13 m²
End Bearing Multiplier 60
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 7,023 7,083 9,391 17,480 4,722 7,044 9,391
E) STRUCTURAL CAPACITY
Static 11,310 kN
ODE 11,310 kN
MDE 18,096 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 7,023 kN Static (kN) 6673 OK 0
ODE 9,391 kN ODE (kN) 7925 OK 0
MDE 17,480 kN MDE (kN) 10764 OK 0
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category: 1x1200 Load Category: K
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) 2
+2 (1 )
= +
2 4
Site Location : Lebak Bulus station Pile Group Category:2x1200 Load Category: L
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.20 m
w : 9.8 kN/m3 Pile Cut-off Level : 34.975 mRL
Pile Toe Level : 8.98 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 34.98 28.36 3.5 6.6 16 13 393 314 1
AC3 28.36 24.36 22 4.0 88 88 1,327 1,327 1
AC3 24.36 22.36 37 2.0 148 148 1,116 1,116 1
AC3 22.36 21.91 47 0.4 188 188 319 319 1
AC3 21.91 16.86 16.5 5.1 66 66 1,257 1,257 1
TS 16.86 13.36 45.5 3.5 137 137 1,801 1,801 1
TC 13.36 12.36 48 1.0 192 192 724 724 1
TC 12.36 11.36 50 1.0 200 200 754 754 1
TS 11.36 9.36 50 2.0 150 150 1,131 1,131 1
TC 9.36 8.98 48.75 0.4 195 195 286 286 1
B) END BEARING
Pile Depth 26.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 1.13 m²
End Bearing Multiplier 45
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 4,661 4,553 6,019 11,573 3,036 4,514 6,019
E) STRUCTURAL CAPACITY
Static 11,310 kN
ODE 11,310 kN
MDE 18,096 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 4,553 kN Static (kN) 2761 OK 0
ODE 6,019 kN ODE (kN) 5870 OK 2277 OK
MDE 11,573 kN MDE (kN) 7594 OK 3570 OK
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category: 2x1200 Load Category: L
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) 2
+2 (1 )
= +
2 4
Rs=
Rs=
Sg=Rs x Single Pile Settlement
Group Settlement Ratio Rs 1.41
Pile Group Settlement Sg 1.60 mm
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category : 4x1200 Load Category: M
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.20 m
w : 9.8 kN/m3 Pile Cut-off Level : 34.975 mRL
Pile Toe Level : 3.98 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 34.98 28.36 3.5 6.6 16 13 393 314 1
AC3 28.36 24.36 22 4.0 88 88 1,327 1,327 1
AC3 24.36 22.36 37 2.0 148 148 1,116 1,116 1
AC3 22.36 21.91 47 0.4 188 188 319 319 1
AC3 21.91 16.86 16.5 5.1 66 66 1,257 1,257 1
TS 16.86 13.36 45.5 3.5 137 137 1,801 1,801 1
TC 13.36 12.36 48 1.0 192 192 724 724 1
TC 12.36 11.36 50 1.0 200 200 754 754 1
TS 11.36 9.36 50 2.0 150 150 1,131 1,131 1
TC 9.36 3.98 48.75 5.4 195 195 3,962 3,962 1
B) END BEARING
Pile Depth 31.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 1.13 m²
End Bearing Multiplier 45
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 6,131 6,391 8,469 15,249 4,261 6,352 8,469
E) STRUCTURAL CAPACITY
Static 11,310 kN
ODE 11,310 kN
MDE 18,096 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 6,131 kN Static (kN) 4869 OK 0
ODE 8,469 kN ODE (kN) 8397 OK 1912 OK
MDE 15,249 kN MDE (kN) 11226 OK 3480 OK
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category : 4x1200 Load Category: M
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) 2
+2 (1 )
= +
2 4
Rs=
Rs=
Sg=Rs x Single Pile Settlement
Group Settlement Ratio Rs 2.00
Pile Group Settlement Sg 4.77 mm
Project : JMRT CP101
Designed : KYKQ
PILE BEARING CAPACITY Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category :4x1200 Load Category: N
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
BH Elevation : 38.4 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.20 m
w : 9.8 kN/m3 Pile Cut-off Level : 34.975 mRL
Pile Toe Level : 2.48 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 34.98 28.36 3.5 6.6 16 13 393 314 1
AC3 28.36 24.36 22 4.0 88 88 1,327 1,327 1
AC3 24.36 22.36 37 2.0 148 148 1,116 1,116 1
AC3 22.36 21.91 47 0.4 188 188 319 319 1
AC3 21.91 16.86 16.5 5.1 66 66 1,257 1,257 1
TS 16.86 13.36 45.5 3.5 137 137 1,801 1,801 1
TC 13.36 12.36 48 1.0 192 192 724 724 1
TC 12.36 11.36 50 1.0 200 200 754 754 1
TS 11.36 9.36 50 2.0 150 150 1,131 1,131 1
TC 9.36 2.48 48.75 6.9 195 195 5,064 5,064 1
B) END BEARING
Pile Depth 32.5 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2250 kN/m2
SPT-N Value at Pile Toe 50 Area of Toe 1.13 m²
End Bearing Multiplier 45
D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 6,572 6,943 9,204 16,351 4,628 6,903 9,204
E) STRUCTURAL CAPACITY
Static 11,310 kN
ODE 11,310 kN
MDE 18,096 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 6,572 kN Static (kN) 5219 OK 0
ODE 9,204 kN ODE (kN) 8709 OK 1803 OK
MDE 16,351 kN MDE (kN) 11299 OK 2558 OK
Project : JMRT CP101
Designed : KYKQ
PILE SETTLEMENT Checked : DAP
Date : 8-Dec-2014
Site Location : Lebak Bulus station Pile Group Category : 4x1200 Load Category: N
BH Ref. : 1 ABH-4 Pile Type : Bored Pile
( ) 2
+2 (1 )
= +
2 4
Rs=
Rs=
Sg=Rs x Single Pile Settlement
Group Settlement Ratio Rs 2.00
Pile Group Settlement Sg 5.36 mm
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Appendix E
TWJO-1-TCD-ST1-0004-Rev B Appendix E
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design
B
PG1A 1 1000 1 ABH-4 0.2 0.0 A
C52, C54
to C56 &
1 1000 1 ABH-4 1.3 0.0 C
C58 to
C60
C25, C27,
C29 & 1 1000 1 ABH-4 2.3 0.0 D
C31
C19, C21
1 1000 1 ABH-4 2.6 0.0 E
& C23
C17 &
1 1000 1 ABH-4 3.8 0.0 F
C51
C5, C6 &
1 1000 1 ABH-4 3.8 0.0 F
C39
C2, C3,
C4, C36,
1 1000 1 ABH-4 3.8 0.0 F
C37 &
C38
C7, C9 to
C12 & 1 1000 1 ABH-4 5.0 0.0 G
C14
C15, C16,
C49 & 1 1000 1 ABH-4 5.9 0.0 H
C50
C41, C44,
C46 & 1 1200 1 ABH-4 3.1 0.0 J
C47
C42, C43,
C45 & 1 1200 1 ABH-4 3.5 0.0 K
C48
C24, C26,
C28 & 4 1200 1 ABH-4 2.4 4.8 M
C30
C20 &
4 1200 1 ABH-4 2.7 5.4 N
C22
Appendix F
TWJO-1-TCD-ST1-0004-Rev B Appendix F
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
TWJO-1-TCD-ST1-0004-Rev B Appendix F
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Appendix G
TWJO-1-TCD-ST1-0004-Rev B Appendix G
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
TWJO-1-TCD-ST1-0004-Rev B Appendix G
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Appendix H
TWJO-1-TCD-ST1-0004-Rev B Appendix H
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Table 1
Alternative Codes to be
No. Item Code (specified)
Used
1 Viaducts
a Train Loads ODS ODS
BD37/01, BD60/04,
b Other Loads Japanese Standards
BS6779
c Load Factors Japanese Standards BD37/01
BS5400 Part 4, Part 7
d Concrete Member Design Japanese Standards
and Part 8
e Steel Member Design Japanese Standards BS5400 Part 3 and Part 6
2 Stations
a Loadings SNI 03-1727-1989 BS6339
Load Factors and Concrete
b SNI 03-2847-2002 BS8110
Member Design
Load Factors and Steel
c SNI 03-1729-2002 BS 5950
Member design
3 Depot
a Loadings SNI 03-1727-1989 BS6339
Load Factors and Concrete
b SNI 03-2847-2002 BS8110
Member Design
Load Factors and Steel
c SNI 03-1729-2002 BS 5950
Member design
4 Seismic
a Earthquake response SNI 03-2833-2008 PTLAPI ITB report
b Earthquake response SNI 03-1726-2002 PTLAPI ITB report
Structural response and
c DSRSC-SD Eurocode 8
design of structures
d Level 1 displacement limits DSRSC-DL DSRSC-DL
5 Others
Foundations Indonesian Code BS 8004
Retaining Walls Indonesian Code BS 8002 and BS 8006
TWJO-1-TCD-ST1-0004-Rev B Appendix H
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
BD37/01 Design Manual for Roads and Bridges Loads for Highway Bridges (UK
Department of Transport enactment of BS5400 Part 2)
BS6399 Loading for Buildings (only where loads are not covered by SNI
documents)
TWJO-1-TCD-ST1-0004-Rev B Appendix H
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Appendix I
TWJO-1-TCD-ST1-0004-Rev B Appendix I
1 2 3 4 5 6 7 8 9 10 11
A1
NOTES:
A1
NOTES:
A1
2 IMPOSED DEAD LOAD ( FLOOR FINISH 100 MM THK. ) THIS IMPOSED LOAD IS BASED ON:-
S.N. TITLE DRAWING REV. DATE REMARKS
LOAD AREA NO.
2.4 kN/m² 3518m² LEBAK BULUS STATION
1 PLATFORM CP101-CP102-SK-032 R0 MAY;2012
OVERALL LAYOUT
LEGEND LOADS AREA
4 kN/m² 41.52 m²
2 CLAUSE NO-5.2(TABLE 17) OF DESIGN MANUAL
5 kN/m² 3518.92 m²
NOTES:
A1
2 IMPOSED DEAD LOAD ( FLOOR FINISH 100 MM THK. ) THIS IMPOSED LOAD IS BASED ON:-
S.N. TITLE DRAWING REV. DATE REMARKS
LOAD AREA NO.
2.4 kN/m² 3960m² LEBAK BULUS STATION
1 UPPER CONCOURSE CP101-CP102-SK-038 R0 MAY;2012
OVERALL LAYOUT
LEGEND LOADS AREA
4 kN/m² 41.52 m²
2 CLAUSE NO-5.2(TABLE 17) OF DESIGN MANUAL
5 kN/m² 3518.92 m²
NOTES:
Appendix J
TWJO-1-TCD-ST1-0004-Rev B Appendix J
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Design of Pile
TWJO-1-TCD-ST1-0004-Rev B Appendix J
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26066 1004 1DL25004
+ 1SIDL 3780.264
+ 1CL + 1PLB +-6.134
1.1TLB - 1.1BTB
-1.789 0.013 12.851 -8.045
Min Fx 23920 1003 1DL22688
+ 1SIDL 3193.937
+ 1CL + 1PLB + 1.77
1.1TLB + 1.1BTB
1.364 -0.645 7.218 -55.406
Max Fy 23949 1005 1DL22687
+ 1SIDL 3604.581
+ 1CL + 1PLA 22.293
+ 1PLB + 1.1TLA1.779
+ 1.1TLB
-0.587
+ 1.1BTA-15.062
+ 1.1BTB -34.846
Min Fy 26095 1006 1DL25003
+ 1SIDL 3780.254
+ 1CL + 1PLA-19.433
+ 1PLB + 1.1TLA
-2.791
+ 1.1TLB0.068
- 1.1BTA -11.592
1.1BTB -28.144
Max Fz 23949 1006 1DL22687
+ 1SIDL +3716.99
1CL + 1PLA-14.068
+ 1PLB + 1.1TLA5.472
+ 1.1TLB
-0.572
- 1.1BTA --18.43
1.1BTB -7.173
Min Fz 26095 1001 1DL25003
+ 1SIDL 3206.697
+ 1CL + 1PLA +6.722
1.1TLA + -5.903
1.1BTA 0.104 -3.604 -52.206
Max Mx 26066 1001 1DL25004
+ 1SIDL 3206.697
+ 1CL + 1PLA +-1.409
1.1TLA + -1.731
1.1BTA 0.104 -16.671 -63.022
Min Mx 23920 1003 1DL22688
+ 1SIDL 3193.937
+ 1CL + 1PLB + 1.77
1.1TLB + 1.1BTB
1.364 -0.645 7.218 -55.406
Max My 26095 1004 1DL25003
+ 1SIDL 3780.264
+ 1CL + 1PLB-10.815
+ 1.1TLB - 1.1BTB
-1.574 0.013 17.932 -35.549
Min My 23949 1002 1DL22687
+ 1SIDL 3755.154
+ 1CL + 1PLA +-5.221
1.1TLA - 1.1BTA
2.246 -0.5 -23.15 -14.458
Max Mz 26070 1006 1DL25009
+ 1SIDL 3780.254
+ 1CL + 1PLA +-0.678
1PLB + 1.1TLA
-0.796
+ 1.1TLB0.068
- 1.1BTA --1.904
1.1BTB 39.105
Min Mz 26066 1005 1DL25005
+ 1SIDL 3642.964
+ 1CL + 1PLA +1.849
1PLB + 1.1TLA
-2.197
+ 1.1TLB
-0.023
+ 1.1BTA +-5.015
1.1BTB -91.402
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 1104 880.3 1045 0.842 OK
Minima 5042 102.3 1762 0.058 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26073 1004 1DL25011
+ 1SIDL 3780.264
+ 1CL + 1PLB +-0.013
1.1TLB - 1.1BTB
-1.015 0.013 1.804 14.817
Min Fx 23927 1003 1DL22695
+ 1SIDL 3193.937
+ 1CL + 1PLB +-5.554
1.1TLB + -0.864
1.1BTB -0.645 8.548 -37.938
Max Fy 26076 1006 1DL25014
+ 1SIDL 3780.254
+ 1CL + 1PLA +4.616
1PLB + 1.1TLA0.315
+ 1.1TLB0.068
- 1.1BTA --3.014
1.1BTB 26.559
Min Fy 23928 1005 1DL22696
+ 1SIDL 3604.581
+ 1CL + 1PLA +-9.042
1PLB + 1.1TLA0.495
+ 1.1TLB
-0.587
+ 1.1BTA +0.311
1.1BTB -55.54
Max Fz 26075 1001 1DL25013
+ 1SIDL 3206.697
+ 1CL + 1PLA +-5.059
1.1TLA + 1.1BTA
2.042 0.104 -11.396 -20.808
Min Fz 23930 1004 1DL22698
+ 1SIDL 3258.799
+ 1CL + 1PLB + 1.074
1.1TLB - -1.129
1.1BTB -0.45 5.992 7.534
Max Mx 26073 1001 1DL25011
+ 1SIDL 3206.697
+ 1CL + 1PLA +-5.892
1.1TLA + 1.1BTA
1.82 0.104 -15.227 -32.269
Min Mx 23927 1003 1DL22695
+ 1SIDL 3193.937
+ 1CL + 1PLB +-5.554
1.1TLB + -0.864
1.1BTB -0.645 8.548 -37.938
Max My 23927 1004 1DL22695
+ 1SIDL 3258.799
+ 1CL + 1PLB + 0.22
1.1TLB - 1.1BTB
-0.849 -0.45 9.011 9.341
Min My 26073 1001 1DL25011
+ 1SIDL 3206.697
+ 1CL + 1PLA +-5.892
1.1TLA + 1.1BTA
1.82 0.104 -15.227 -32.269
Max Mz 26073 1006 1DL25011
+ 1SIDL 3780.254
+ 1CL + 1PLA +2.815
1PLB + 1.1TLA
-0.195
+ 1.1TLB0.068
- 1.1BTA --3.072
1.1BTB 37.714
Min Mz 23927 1005 1DL22695
+ 1SIDL 3604.581
+ 1CL + 1PLA + -8.56
1PLB + 1.1TLA0.734
+ 1.1TLB
-0.587
+ 1.1BTA +-0.422
1.1BTB -64.1
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
ODE MDE
Maximum Tension Force (kN) 1090.22 1104.106
Skin Friction (kN) 1722.67
Final Axial Load (kN) 0.00 0.00
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 1104 740.1 885.8 0.836 OK
Minima 5142 631.3 1658 0.381 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.7645 m
Hence de = 0.743 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 527 kN
Corresponding axial compressive force, N = 2886 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 4536 mm2
Effective area of tensile steel = 50% of total steel = As = 0.0023 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.339 %
Horizontal shear force, Vu = 527 kN
Shear stress (vv = Vu /(bv . dv) = 787.26 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.515 Mpa
= 515 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 478.933 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/Ac) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.18
Modified shear strength of concrete (n s vc ) = 566.94 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 147.40 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.61 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
PILE DESIGN FOR COLUMNS C2, C3, C4, C36, C37 & C38
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
PILE DESIGN FOR COLUMN C2, C3, C4, C36, C37 & C38
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26099 1003 1DL25037
+ 1SIDL 5179.702
+ 1CL + 1PLB + 6.187
1.1TLB + -10.173
1.1BTB -0.519 26.283 -50.148
Min Fx 23986 1004 1DL22754
+ 1SIDL 4188.322
+ 1CL + 1PLB + 1.457
1.1TLB - 1.1BTB
5.945 -0.295 -2.882 5.694
Max Fy 24015 1005 1DL22753
+ 1SIDL 4938.095
+ 1CL + 1PLA +33.616
1PLB + 1.1TLA
14.538
+ 1.1TLB-0.31
+ 1.1BTA-63.843
+ 1.1BTB 5.136
Min Fy 24048 1006 1DL22786
+ 1SIDL +5070.26
1CL + 1PLA -20.736
+ 1PLB + 1.1TLA
14.386
+ 1.1TLB
-0.498
- 1.1BTA - -54.11
1.1BTB -32.961
Max Fz 23982 1006 1DL22720
+ 1SIDL 4972.904
+ 1CL + 1PLA -14.953
+ 1PLB + 1.1TLA
18.375
+ 1.1TLB
-0.334
- 1.1BTA -66.173
- 1.1BTB -10.835
Min Fz 26161 1005 1DL25069
+ 1SIDL 5038.289
+ 1CL + 1PLA +33.556
1PLB + 1.1TLA
-19.904
+ 1.1TLB-0.39
+ 1.1BTA +60.767
1.1BTB 2.99
Max Mx 23953 1001 1DL22721
+ 1SIDL 5047.399
+ 1CL + 1PLA + 5.624
1.1TLA + 1.1BTA
9.469 -0.06 -37.011 -50.478
Min Mx 26099 1003 1DL25037
+ 1SIDL 5179.702
+ 1CL + 1PLB + 6.187
1.1TLB + -10.173
1.1BTB -0.519 26.283 -50.148
Max My 26128 1004 1DL25036
+ 1SIDL 5167.435
+ 1CL + 1PLB +-2.892
1.1TLB - -15.939
1.1BTB -0.264 68.954 -7.5
Min My 23982 1001 1DL22720
+ 1SIDL 5047.399
+ 1CL + 1PLA +18.622
1.1TLA + 12.997
1.1BTA -0.06 -72.585 -9.057
Max Mz 24023 1006 1DL22792
+ 1SIDL +5070.26
1CL + 1PLA +-0.994
1PLB + 1.1TLA
3.581
+ 1.1TLB
-0.498
- 1.1BTA -12.593
1.1BTB 40.287
Min Mz 26134 1005 1DL25073
+ 1SIDL 5038.289
+ 1CL + 1PLA + 2.443
1PLB + 1.1TLA
-6.653
+ 1.1TLB-0.39
+ 1.1BTA-15.707
+ 1.1BTB -93.678
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 1935 887.4 1117 0.795 OK
Minima 2882 123.9 1339 0.093 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.766 m
Hence de = 0.744 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 545 kN
Corresponding axial compressive force, N = 4208 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 3217 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0016 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.240 %
Horizontal shear force, Vu = 545 kN
Shear stress (vv = Vu /(bv . dv) = 814.49 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.459 Mpa
= 459 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 426.930 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.27
Modified shear strength of concrete (n s vc ) = 541.31 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 182.88 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.78 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24085 1005 1DL22853
+ 1SIDL +5046.94
1CL + 1PLA +4.428
1PLB + 1.1TLA
16.89
+ 1.1TLB
-0.232
+ 1.1BTA-42.082
+ 1.1BTB -86.254
Min Fx 26198 1001 1DL25136
+ 1SIDL 3884.959
+ 1CL + 1PLA +12.247
1.1TLA + -8.116
1.1BTA -0.186 -6.764 -40.341
Max Fy 24081 1005 1DL22819
+ 1SIDL 4691.158
+ 1CL + 1PLA 41.485
+ 1PLB + 1.1TLA
16.232
+ 1.1TLB
-0.102
+ 1.1BTA-73.097
+ 1.1BTB 32.054
Min Fy 24114 1006 1DL22852
+ 1SIDL 4597.792
+ 1CL + 1PLA-15.859
+ 1PLB + 1.1TLA
17.355
+ 1.1TLB
-0.192
- 1.1BTA-67.197
- 1.1BTB -17.874
Max Fz 24114 1005 1DL22852
+ 1SIDL +5046.94
1CL + 1PLA +21.661
1PLB + 1.1TLA
26.784
+ 1.1TLB
-0.232
+ 1.1BTA
-112.241
+ 1.1BTB -40.615
Min Fz 26227 1005 1DL25135
+ 1SIDL 4598.165
+ 1CL + 1PLA +41.148
1PLB + 1.1TLA
-21.815
+ 1.1TLB
-0.446
+ 1.1BTA 64.559
+ 1.1BTB 29.672
Max Mx 24052 1001 1DL22820
+ 1SIDL 4763.942
+ 1CL + 1PLA +12.833
1.1TLA + 10.466
1.1BTA 0.09 -39.687 -39.395
Min Mx 26198 1003 1DL25136
+ 1SIDL 4680.227
+ 1CL + 1PLB +12.511
1.1TLB +-11.212
1.1BTB -0.535 23.062 -39.979
Max My 26227 1004 1DL25135
+ 1SIDL 4685.487
+ 1CL + 1PLB + 9.818
1.1TLB - -17.577
1.1BTB -0.347 71.073 36.671
Min My 24114 1005 1DL22852
+ 1SIDL +5046.94
1CL + 1PLA +21.661
1PLB + 1.1TLA
26.784
+ 1.1TLB
-0.232
+ 1.1BTA
-112.241
+ 1.1BTB -40.615
Max Mz 24081 1006 1DL22850
+ 1SIDL 4659.811
+ 1CL + 1PLA + -0.07
1PLB + 1.1TLA
18.57
+ 1.1TLB
-0.148
- 1.1BTA-51.757
- 1.1BTB 40.6
Min Mz 26201 1005 1DL25140
+ 1SIDL 4598.165
+ 1CL + 1PLA +1.537
1PLB + 1.1TLA
-5.289
+ 1.1TLB
-0.446
+ 1.1BTA-23.885
+ 1.1BTB -98.841
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 1199 937.6 1071 0.876 OK
Minima 2880 96.52 1470 0.066 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24092 1005 1DL22860
+ 1SIDL +5046.94
1CL + 1PLA +-8.854
1PLB + 1.1TLA1.953
+ 1.1TLB
-0.232
+ 1.1BTA 29.183
+ 1.1BTB -64.381
Min Fx 26205 1001 1DL25143
+ 1SIDL 3884.959
+ 1CL + 1PLA +-5.405
1.1TLA + 1.1BTA
1.66 -0.186 -29.76 -62.477
Max Fy 24095 1006 1DL22863
+ 1SIDL 4597.792
+ 1CL + 1PLA +4.002
1PLB + 1.1TLA
-2.183
+ 1.1TLB
-0.192
- 1.1BTA -19.263
1.1BTB 22.215
Min Fy 26208 1005 1DL25146
+ 1SIDL 4598.165
+ 1CL + 1PLA-11.155
+ 1PLB + 1.1TLA3.662
+ 1.1TLB
-0.446
+ 1.1BTA-26.322
+ 1.1BTB -59.408
Max Fz 26209 1005 1DL25147
+ 1SIDL 4598.165
+ 1CL + 1PLA-10.661
+ 1PLB + 1.1TLA 3.87
+ 1.1TLB
-0.446
+ 1.1BTA-22.661
+ 1.1BTB -48.252
Min Fz 24098 1005 1DL22866
+ 1SIDL +5046.94
1CL + 1PLA +-5.885
1PLB + 1.1TLA
-3.794
+ 1.1TLB
-0.232
+ 1.1BTA 18.515
+ 1.1BTB -14.326
Max Mx 24059 1001 1DL22827
+ 1SIDL 4763.942
+ 1CL + 1PLA +-5.387
1.1TLA + 1.1BTA
2.521 0.09 10.145 -63.788
Min Mx 26205 1003 1DL25143
+ 1SIDL 4680.227
+ 1CL + 1PLB +-5.403
1.1TLB + -0.827
1.1BTB -0.535 -22.214 -63.107
Max My 24092 1005 1DL22861
+ 1SIDL +5046.94
1CL + 1PLA +-8.854
1PLB + 1.1TLA1.953
+ 1.1TLB
-0.232
+ 1.1BTA 31.136
+ 1.1BTB -55.527
Min My 26205 1005 1DL25143
+ 1SIDL 4598.165
+ 1CL + 1PLA +-8.336
1PLB + 1.1TLA0.542
+ 1.1TLB
-0.446
+ 1.1BTA-32.105
+ 1.1BTB -89.143
Max Mz 24092 1006 1DL22860
+ 1SIDL 4597.792
+ 1CL + 1PLA +2.702
1PLB + 1.1TLA0.826
+ 1.1TLB
-0.192
- 1.1BTA -20.626
1.1BTB 32.359
Min Mz 24059 1005 1DL22827
+ 1SIDL 4691.158
+ 1CL + 1PLA +-8.235
1PLB + 1.1TLA1.587
+ 1.1TLB
-0.102
+ 1.1BTA 16.111
+ 1.1BTB -89.209
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
ODE MDE
Maximum Tension Force (kN) 1477.01 1198.575
Skin Friction (kN) 1722.67
Final Axial Load (kN) 0.00 0.00
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 1199 721.9 915.1 0.789 OK
Minima 5742 591 1701 0.348 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.7645 m
Hence de = 0.743 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 542 kN
Corresponding axial compressive force, N = 3940 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 4536 mm2
Effective area of tensile steel = 50% of total steel = As = 0.0023 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.339 %
Horizontal shear force, Vu = 542 kN
Shear stress (vv = Vu /(bv . dv) = 810.20 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.515 Mpa
= 515 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 478.933 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/Ac) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.25
Modified shear strength of concrete (n s vc ) = 599.06 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 141.26 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.61 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30628 1001 1DL29632
+ 1SIDL 6075.359
+ 1CL + 1PLA +28.587
1.1TLA + 29.307
1.1BTA -0.111 -73.01 -10.642
Min Fx 24151 1004 1DL22919
+ 1SIDL +4009.49
1CL + 1PLB +10.801
1.1TLB - 1.1BTB
-0.593 -0.583 -0.8 23.473
Max Fy 30645 1005 1DL29631
+ 1SIDL 6034.443
+ 1CL + 1PLA +68.805
1PLB + 1.1TLA
48.185
+ 1.1TLB
-0.107
+ 1.1BTA
-188.613
+ 1.1BTB 131.345
Min Fy 24147 1006 1DL22885
+ 1SIDL 5004.774
+ 1CL + 1PLA -23.417
+ 1PLB + 1.1TLA
20.965
+ 1.1TLB
-1.707
- 1.1BTA -86.091
- 1.1BTB -40.731
Max Fz 30645 1005 1DL29631
+ 1SIDL 6034.443
+ 1CL + 1PLA +68.805
1PLB + 1.1TLA
48.185
+ 1.1TLB
-0.107
+ 1.1BTA
-188.613
+ 1.1BTB 131.345
Min Fz 30640 1005 1DL29644
+ 1SIDL 6034.443
+ 1CL + 1PLA -14.162
+ 1PLB + 1.1TLA
-7.189
+ 1.1TLB
-0.107
+ 1.1BTA +40.432
1.1BTB -60.952
Max Mx 24217 1005 1DL22985
+ 1SIDL 5451.829
+ 1CL + 1PLA +11.021
1PLB + 1.1TLA
5.651
+ 1.1TLB 2.62
+ 1.1BTA-21.721
+ 1.1BTB -73.4
Min Mx 24118 1006 1DL22886
+ 1SIDL 5004.774
+ 1CL + 1PLA -10.734
+ 1PLB + 1.1TLA
13.097
+ 1.1TLB
-1.707
- 1.1BTA -31.323
- 1.1BTB 15.758
Max My 30635 1005 1DL29640
+ 1SIDL 6034.443
+ 1CL + 1PLA +-7.449
1PLB + 1.1TLA
2.457
+ 1.1TLB
-0.107
+ 1.1BTA +59.087
1.1BTB -116.242
Min My 30645 1001 1DL29631
+ 1SIDL 6075.359
+ 1CL + 1PLA +57.651
1.1TLA + 46.476
1.1BTA -0.111 -194.751 131.031
Max Mz 30645 1005 1DL29631
+ 1SIDL 6034.443
+ 1CL + 1PLA +68.805
1PLB + 1.1TLA
48.185
+ 1.1TLB
-0.107
+ 1.1BTA
-188.613
+ 1.1BTB 131.345
Min Mz 30633 1005 1DL29638
+ 1SIDL 6034.443
+ 1CL + 1PLA + 1.727
1PLB + 1.1TLA
10.062
+ 1.1TLB
-0.107
+ 1.1BTA +48.619
1.1BTB -124.601
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 5644 1298 1695 0.766 OK
Minima 4426 286.2 1588 0.180 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.766 m
Hence de = 0.744 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 580 kN
Corresponding axial compressive force, N = 5644 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 3217 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0016 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.240 %
Horizontal shear force, Vu = 580 kN
Shear stress (vv = Vu /(bv . dv) = 866.79 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.459 Mpa
= 459 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 426.930 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.36
Modified shear strength of concrete (n s vc ) = 580.32 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 191.78 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.78 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24448 1001 1DL23218
+ 1SIDL 5089.116
+ 1CL + 1PLA +12.119
1.1TLA + 1.1BTA
10.9 0.013 -39.814 -43.224
Min Fx 30590 1004 1DL29593
+ 1SIDL 3518.528
+ 1CL + 1PLB -19.398
+ 1.1TLB - 1.1BTB
6.775 -0.68 -16.064 -29.82
Max Fy 24477 1005 1DL23217
+ 1SIDL 5037.427
+ 1CL + 1PLA +40.983
1PLB + 1.1TLA
16.288
+ 1.1TLB0.041
+ 1.1BTA-74.096
+ 1.1BTB 26.356
Min Fy 30607 1006 1DL29592
+ 1SIDL 3945.906
+ 1CL + 1PLA -50.228
+ 1PLB + 1.1TLA
9.386
+ 1.1TLB-1.05
- 1.1BTA -56.122
- 1.1BTB -135.465
Max Fz 24477 1006 1DL23217
+ 1SIDL 4989.827
+ 1CL + 1PLA +-2.254
1PLB + 1.1TLA
22.257
+ 1.1TLB
-0.768
- 1.1BTA -85.424
- 1.1BTB 31.498
Min Fz 24460 1006 1DL23230
+ 1SIDL 4989.827
+ 1CL + 1PLA + 1.475
1PLB + 1.1TLA
-3.369
+ 1.1TLB
-0.768
- 1.1BTA -18.716
1.1BTB 2.832
Max Mx 30590 1005 1DL29593
+ 1SIDL 4088.083
+ 1CL + 1PLA -12.826
+ 1PLB + 1.1TLA
9.322
+ 1.1TLB0.068
+ 1.1BTA-27.934
+ 1.1BTB -114.899
Min Mx 30590 1006 1DL29593
+ 1SIDL 3945.906
+ 1CL + 1PLA -26.403
+ 1PLB + 1.1TLA
7.098
+ 1.1TLB-1.05
- 1.1BTA -30.118
- 1.1BTB -10.234
Max My 24455 1006 1DL23226
+ 1SIDL 4989.827
+ 1CL + 1PLA + 3.087
1PLB + 1.1TLA + 11.1TLB
-0.768
- 1.1BTA -27.686
1.1BTB 12.078
Min My 24477 1002 1DL23217
+ 1SIDL 5064.582
+ 1CL + 1PLA + 8.507
1.1TLA - 18.524
1.1BTA -0.519 -87.271 30.283
Max Mz 30596 1006 1DL29600
+ 1SIDL 3945.906
+ 1CL + 1PLA +-2.878
1PLB + 1.1TLA
3.295
+ 1.1TLB-1.05
- 1.1BTA - 1.1BTB
5.015 78.01
Min Mz 30607 1001 1DL29592
+ 1SIDL 4086.324
+ 1CL + 1PLA -18.942
+ 1.1TLA + 11.387
1.1BTA 0.009 -67.425 -144.947
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 3001 997.2 1361 0.733 OK
Minima 3607 462.1 1469 0.315 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.766 m
Hence de = 0.744 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 543 kN
Corresponding axial compressive force, N = 4700 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 3217 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0016 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.240 %
Horizontal shear force, Vu = 543 kN
Shear stress (vv = Vu /(bv . dv) = 810.92 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.459 Mpa
= 459 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 426.930 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.30
Modified shear strength of concrete (n s vc ) = 554.67 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 171.55 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.78 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24316 1002 1DL23084
+ 1SIDL 6618.186
+ 1CL + 1PLA +-4.901
1.1TLA - 23.408
1.1BTA -0.769 -74.851 -5.363
Min Fx 26429 1002 1DL25367
+ 1SIDL 3755.331
+ 1CL + 1PLA +-0.817
1.1TLA - -8.292
1.1BTA -0.772 -16.033 -1.87
Max Fy 26491 1005 1DL25399
+ 1SIDL 4564.023
+ 1CL + 1PLA +33.475
1PLB + 1.1TLA
-24.813
+ 1.1TLB-0.16
+ 1.1BTA 74.585
+ 1.1BTB 3.185
Min Fy 24312 1006 1DL23050
+ 1SIDL 5983.984
+ 1CL + 1PLA-21.629
+ 1PLB + 1.1TLA
43.893
+ 1.1TLB
-0.997
- 1.1BTA
-189.696
- 1.1BTB -33.121
Max Fz 24312 1005 1DL23050
+ 1SIDL 5977.864
+ 1CL + 1PLA +22.374
1PLB + 1.1TLA
48.365
+ 1.1TLB
-0.024
+ 1.1BTA
-189.696
+ 1.1BTB -36.324
Min Fz 26491 1006 1DL25399
+ 1SIDL 4573.755
+ 1CL + 1PLA-10.229
+ 1PLB + 1.1TLA
-29.616
+ 1.1TLB
-0.929
- 1.1BTA -72.287
1.1BTB 1.486
Max Mx 24316 1005 1DL23084
+ 1SIDL 6557.012
+ 1CL + 1PLA + 6.712
1PLB + 1.1TLA
25.133
+ 1.1TLB0.038
+ 1.1BTA +-56.57
1.1BTB -81.082
Min Mx 24283 1006 1DL23051
+ 1SIDL 5983.984
+ 1CL + 1PLA +-9.598
1PLB + 1.1TLA
28.084
+ 1.1TLB
-0.997
- 1.1BTA-74.235
- 1.1BTB 18.676
Max My 26491 1003 1DL25399
+ 1SIDL 4610.402
+ 1CL + 1PLB + 22.41
1.1TLB +-24.224
1.1BTB -0.396 80.137 2.632
Min My 24312 1002 1DL23050
+ 1SIDL 6045.939
+ 1CL + 1PLA-10.666
+ 1.1TLA - 43.663
1.1BTA -0.79 -196.431 -34.01
Max Mz 24287 1006 1DL23056
+ 1SIDL 5983.984
+ 1CL + 1PLA +-0.921
1PLB + 1.1TLA
13.201
+ 1.1TLB
-0.997
- 1.1BTA -26.333
1.1BTB 42.641
Min Mz 26464 1005 1DL25403
+ 1SIDL 4564.023
+ 1CL + 1PLA + 2.455
1PLB + 1.1TLA-8.19
+ 1.1TLB-0.16
+ 1.1BTA-20.372
+ 1.1BTB -93.315
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 4277 1167 1569 0.744 OK
Minima 2762 130.2 1313 0.099 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.127 mm OK
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.766 m
Hence de = 0.744 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 543 kN
Corresponding axial compressive force, N = 4277 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 3217 mm2
Effective area of tensile steel = 50% of total steel = As = 0.0016 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.240 %
Horizontal shear force, Vu = 543 kN
Shear stress (vv = Vu /(bv . dv) = 811.06 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.459 Mpa
= 459 kN/m2
1/4
Depth Factor, s = (500/d) or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 426.930 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/Ac) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.27
Modified shear strength of concrete (n s vc ) = 543.17 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 179.34 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.78 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24184 1001 1DL22952
+ 1SIDL +4947.235
1CL + 1PLA +24.857
1.1TLA + 1.1BTA
8.349 0.476 -37.68 -17.951
Min Fx 26330 1002 1DL25268
+ 1SIDL +2706.082
1CL + 1PLA + 9.254
1.1TLA - 1.1BTA
-5.913 -1.203 -25.365 15.522
Max Fy 24213 1005 1DL22951
+ 1SIDL +4942.872
1CL + 1PLA +60.595
1PLB + 1.1TLA
12.722
+ 1.1TLB 0.626
+ 1.1BTA +-61.461
1.1BTB 100.894
Min Fy 24194 1005 1DL22962
+ 1SIDL +4942.872
1CL + 1PLA -13.789
+ 1PLB + 1.1TLA
-1.037
+ 1.1TLB 0.626
+ 1.1BTA +12.828
1.1BTB -81.424
Max Fz 24213 1005 1DL22951
+ 1SIDL +4942.872
1CL + 1PLA +60.595
1PLB + 1.1TLA
12.722
+ 1.1TLB 0.626
+ 1.1BTA +-61.461
1.1BTB 100.894
Min Fz 26359 1006 1DL25267
+ 1SIDL + 3100.71
1CL + 1PLA + 1PLB
5.972+ 1.1TLA
-17.332
+ 1.1TLB-1.526
- 1.1BTA - 1.1BTB
24.137 59.621
Max Mx 24184 1005 1DL22952
+ 1SIDL +4942.872
1CL + 1PLA +27.459
1PLB + 1.1TLA
8.595
+ 1.1TLB0.626
+ 1.1BTA +-27.448
1.1BTB -44.901
Min Mx 26330 1006 1DL25268
+ 1SIDL + 3100.71
1CL + 1PLA + 1PLB
6.197+ 1.1TLA
-7.522
+ 1.1TLB-1.526
- 1.1BTA --17.165
1.1BTB 41.055
Max My 26359 1003 1DL25267
+ 1SIDL +3272.583
1CL + 1PLB + 32.83
1.1TLB + -11.345
1.1BTB -0.99 31.937 39.802
Min My 24213 1001 1DL22951
+ 1SIDL +4947.235
1CL + 1PLA +51.437
1.1TLA + 1.1BTA
10.7 0.476 -67.634 107.671
Max Mz 24213 1006 1DL22951
+ 1SIDL +4847.166
1CL + 1PLA +22.771
1PLB + 1.1TLA5.28
+ 1.1TLB-0.334
- 1.1BTA --57.633
1.1BTB 126.212
Min Mz 24189 1005 1DL22958
+ 1SIDL +4942.872
1CL + 1PLA + 1PLB
0.167+ 1.1TLA
3.725
+ 1.1TLB 0.626
+ 1.1BTA + 1.1BTB
8.174 -115.644
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 1337 973.7 1095 0.889 OK
Minima 1515 86.31 1141 0.076 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 24199 1001 1DL22967
+ 1SIDL +4947.235
1CL + 1PLA +-6.691
1.1TLA + 1.1BTA
-1.136 0.476 5.346 -17.264
Min Fx 26345 1002 1DL25283
+ 1SIDL +2706.082
1CL + 1PLA +-1.927
1.1TLA - 1.1BTA
2.128 -1.203 -4.325 -6.197
Max Fy 28632 1005 1DL27616
+ 1SIDL +4942.872
1CL + 1PLA + 1PLB
1.337+ 1.1TLA0.09
+ 1.1TLB 0.626
+ 1.1BTA + 1.1BTB
-0.45 4.347
Min Fy 24199 1005 1DL22967
+ 1SIDL +4942.872
1CL + 1PLA +-8.029
1PLB + 1.1TLA
-1.458
+ 1.1TLB 0.626
+ 1.1BTA + 1.1BTB
5.621 -19.331
Max Fz 26345 1006 1DL25283
+ 1SIDL + 3100.71
1CL + 1PLA +-0.511
1PLB + 1.1TLA
2.323
+ 1.1TLB-1.526
- 1.1BTA - 1.1BTB
-5.346 -3.833
Min Fz 24199 1005 1DL22967
+ 1SIDL +4942.872
1CL + 1PLA +-8.029
1PLB + 1.1TLA
-1.458
+ 1.1TLB 0.626
+ 1.1BTA + 1.1BTB
5.621 -19.331
Max Mx 24199 1005 1DL22967
+ 1SIDL +4942.872
1CL + 1PLA +-8.029
1PLB + 1.1TLA
-1.458
+ 1.1TLB0.626
+ 1.1BTA + 1.1BTB
5.621 -19.331
Min Mx 26345 1006 1DL25283
+ 1SIDL + 3100.71
1CL + 1PLA +-0.511
1PLB + 1.1TLA
2.323
+ 1.1TLB-1.526
- 1.1BTA - 1.1BTB
-5.346 -3.833
Max My 24199 1005 1DL22967
+ 1SIDL +4942.872
1CL + 1PLA +-8.029
1PLB + 1.1TLA
-1.458
+ 1.1TLB 0.626
+ 1.1BTA + 1.1BTB
5.621 -19.331
Min My 26345 1006 1DL25283
+ 1SIDL + 3100.71
1CL + 1PLA +-0.511
1PLB + 1.1TLA
2.323
+ 1.1TLB-1.526
- 1.1BTA - 1.1BTB
-5.346 -3.833
Max Mz 28629 1005 1DL27614
+ 1SIDL +4942.872
1CL + 1PLA +-0.667
1PLB + 1.1TLA
-0.421
+ 1.1TLB 0.626
+ 1.1BTA + -0.257
1.1BTB 5.858
Min Mz 24199 1005 1DL22967
+ 1SIDL +4942.872
1CL + 1PLA +-8.029
1PLB + 1.1TLA
-1.458
+ 1.1TLB 0.626
+ 1.1BTA + 1.1BTB
5.621 -19.331
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 4876 194.5 1634 0.119 OK
Minima 4942 40.21 1641 0.025 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.7645 m
Hence de = 0.743 m and dv = 0.669 m
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28079 1005 1DL27059
+ 1SIDL 4789.497
+ 1CL + 1PLA105.253
+ 1PLB + 1.1TLA
-28.287
+ 1.1TLB
-0.888
+ 1.1BTA183.639
+ 1.1BTB 477.983
Min Fx 28080 1001 1DL27060
+ 1SIDL 3372.254
+ 1CL + 1PLA +50.093
1.1TLA + 1.1BTA
0.085 -0.602 -60.892 149.067
Max Fy 28079 1005 1DL27059
+ 1SIDL 4789.497
+ 1CL + 1PLA105.253
+ 1PLB + 1.1TLA
-28.287
+ 1.1TLB
-0.888
+ 1.1BTA183.639
+ 1.1BTB 477.983
Min Fy 28080 1006 1DL27060
+ 1SIDL 4514.154
+ 1CL + 1PLA + 1PLB
-22+ 1.1TLA
9.496
+ 1.1TLB
-0.722
- 1.1BTA -93.518
- 1.1BTB -119.259
Max Fz 28084 1006 1DL27064
+ 1SIDL 4514.154
+ 1CL + 1PLA -19.963
+ 1PLB + 1.1TLA
9.537
+ 1.1TLB
-0.722
- 1.1BTA -84.023
- 1.1BTB -97.258
Min Fz 28079 1005 1DL27059
+ 1SIDL 4789.497
+ 1CL + 1PLA105.253
+ 1PLB + 1.1TLA
-28.287
+ 1.1TLB
-0.888
+ 1.1BTA183.639
+ 1.1BTB 477.983
Max Mx 28081 1004 1DL27061
+ 1SIDL 3862.219
+ 1CL + 1PLB +25.558
1.1TLB - 1.1BTB
8.169 -0.183 -70.015 174.674
Min Mx 28078 1002 1DL27058
+ 1SIDL 3942.867
+ 1CL + 1PLA + 0.355
1.1TLA - -17.554
1.1BTA -1.062 116.458 -34.975
Max My 28079 1005 1DL27059
+ 1SIDL 4789.497
+ 1CL + 1PLA105.253
+ 1PLB + 1.1TLA
-28.287
+ 1.1TLB
-0.888
+ 1.1BTA183.639
+ 1.1BTB 477.983
Min My 28080 1002 1DL27060
+ 1SIDL +3794.16
1CL + 1PLA + 0.651
1.1TLA - 1.1BTA
8.228 -1.035 -95.514 -32.551
Max Mz 28081 1005 1DL27061
+ 1SIDL 4732.899
+ 1CL + 1PLA105.251
+ 1PLB + 1.1TLA
1.788
+ 1.1TLB
-0.701
+ 1.1BTA-63.476
+ 1.1BTB 477.985
Min Mz 28080 1006 1DL27060
+ 1SIDL 4514.154
+ 1CL + 1PLA + 1PLB
-22+ 1.1TLA
9.496
+ 1.1TLB
-0.722
- 1.1BTA -93.518
- 1.1BTB -119.259
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -2079 4176 5300 0.788 OK
Minima 45.79 3112 5810 0.536 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 29311 1005 1DL28295
+ 1SIDL 4789.497
+ 1CL + 1PLA -13.721
+ 1PLB + 1.1TLA
3.399
+ 1.1TLB
-0.888
+ 1.1BTA-14.392
+ 1.1BTB -46.435
Min Fx 29320 1001 1DL28304
+ 1SIDL 3372.254
+ 1CL + 1PLA +-6.941
1.1TLA + 1.1BTA
0.306 -0.602 2.135 -19.382
Max Fy 29320 1006 1DL28304
+ 1SIDL 4514.154
+ 1CL + 1PLA + 2.767
1PLB + 1.1TLA
-0.974
+ 1.1TLB
-0.722
- 1.1BTA - 1.1BTB
5.936 10.377
Min Fy 29311 1005 1DL28295
+ 1SIDL 4789.497
+ 1CL + 1PLA -13.721
+ 1PLB + 1.1TLA
3.399
+ 1.1TLB
-0.888
+ 1.1BTA-14.392
+ 1.1BTB -46.435
Max Fz 29311 1005 1DL28295
+ 1SIDL 4789.497
+ 1CL + 1PLA -13.721
+ 1PLB + 1.1TLA
3.399
+ 1.1TLB
-0.888
+ 1.1BTA-14.392
+ 1.1BTB -46.435
Min Fz 29320 1006 1DL28304
+ 1SIDL 4514.154
+ 1CL + 1PLA + 2.767
1PLB + 1.1TLA
-0.974
+ 1.1TLB
-0.722
- 1.1BTA - 1.1BTB
5.936 10.377
Max Mx 29329 1004 1DL28313
+ 1SIDL 3862.219
+ 1CL + 1PLB +-3.025
1.1TLB - 1.1BTB
-0.893 -0.183 4.745 -13.307
Min Mx 29311 1002 1DL28295
+ 1SIDL 3867.649
+ 1CL + 1PLA +-3.102
1.1TLA - 1.1BTA
2.063 -1.053 -8.847 -13.549
Max My 29320 1006 1DL28304
+ 1SIDL 4514.154
+ 1CL + 1PLA + 2.767
1PLB + 1.1TLA
-0.974
+ 1.1TLB
-0.722
- 1.1BTA - 1.1BTB
5.936 10.377
Min My 29311 1005 1DL28295
+ 1SIDL 4789.497
+ 1CL + 1PLA -13.721
+ 1PLB + 1.1TLA
3.399
+ 1.1TLB
-0.888
+ 1.1BTA-14.392
+ 1.1BTB -46.435
Max Mz 29320 1006 1DL28304
+ 1SIDL 4514.154
+ 1CL + 1PLA + 2.767
1PLB + 1.1TLA
-0.974
+ 1.1TLB
-0.722
- 1.1BTA - 1.1BTB
5.936 10.377
Min Mz 29311 1005 1DL28295
+ 1SIDL 4789.497
+ 1CL + 1PLA -13.721
+ 1PLB + 1.1TLA
3.399
+ 1.1TLB
-0.888
+ 1.1BTA-14.392
+ 1.1BTB -46.435
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
ODE MDE
Maximum Tension Force (kN) -1662.40 -3479.51
Skin Friction (kN) 3631.33
Final Axial Load (kN) 0.00 0.00
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 442.7 885.8 0.500 OK
Minima 9773 413.9 2997 0.138 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.954 m
Hence de = 0.904 m and dv = 0.813 m
Horizontal resultant shear force at the section, Vu = 1232 kN
Corresponding axial compressive force, N = 11183 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 40212 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0201 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 2.060 %
Horizontal shear force, Vu = 1232 kN
Shear stress (vv = Vu /(bv . dv) = 1261.88 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.940 Mpa
= 940 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 832.311 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.49
Modified shear strength of concrete (n s vc ) = 1243.79 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 17.66 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 390.38 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28117 1005 1DL27100
+ 1SIDL 4789.497
+ 1CL + 1PLA -14.532
+ 1PLB + 1.1TLA
1.434
+ 1.1TLB
-0.888
+ 1.1BTA-31.442
+ 1.1BTB -142.569
Min Fx 28135 1001 1DL27118
+ 1SIDL 3372.254
+ 1CL + 1PLA -10.428
+ 1.1TLA + 1.1BTA
2.698 -0.602 -7.422 -77.622
Max Fy 28153 1006 1DL27136
+ 1SIDL 4073.679
+ 1CL + 1PLA + 2.944
1PLB + 1.1TLA
0.921
+ 1.1TLB
-0.711
- 1.1BTA - 1.1BTB
5.744 1.459
Min Fy 28135 1005 1DL27118
+ 1SIDL 3716.364
+ 1CL + 1PLA -15.297
+ 1PLB + 1.1TLA
2.199
+ 1.1TLB
-0.728
+ 1.1BTA +-5.791
1.1BTB -116.919
Max Fz 28153 1001 1DL27136
+ 1SIDL 4026.568
+ 1CL + 1PLA +-9.761
1.1TLA + 1.1BTA
2.718 -0.577 -6.608 -99.988
Min Fz 28099 1004 1DL27082
+ 1SIDL 3799.384
+ 1CL + 1PLB +-1.585
1.1TLB - 1.1BTB
-0.335 -0.218 -15.871 -4.483
Max Mx 28153 1004 1DL27136
+ 1SIDL 3862.219
+ 1CL + 1PLB +-0.904
1.1TLB - 1.1BTB
0.346 -0.183 6.965 -27.319
Min Mx 28099 1002 1DL27082
+ 1SIDL 3942.867
+ 1CL + 1PLA +-1.687
1.1TLA - 1.1BTA
0.778 -1.062 -19.202 -5.038
Max My 28135 1004 1DL27119
+ 1SIDL 3942.465
+ 1CL + 1PLB +-1.595
1.1TLB - 1.1BTB
0.355 -0.192 7.592 -2.557
Min My 28117 1005 1DL27100
+ 1SIDL 4789.497
+ 1CL + 1PLA -14.532
+ 1PLB + 1.1TLA
1.434
+ 1.1TLB
-0.888
+ 1.1BTA-31.442
+ 1.1BTB -142.569
Max Mz 28135 1006 1DL27118
+ 1SIDL 4514.154
+ 1CL + 1PLA + 2.171
1PLB + 1.1TLA
0.946
+ 1.1TLB
-0.722
- 1.1BTA - 1.1BTB
6.584 27.39
Min Mz 28117 1005 1DL27100
+ 1SIDL 4789.497
+ 1CL + 1PLA -14.532
+ 1PLB + 1.1TLA
1.434
+ 1.1TLB
-0.888
+ 1.1BTA-31.442
+ 1.1BTB -142.569
ODE MDE
Maximum Tension Force (kN) -1912.48 -3479.51
Skin Friction (kN) 2584.00
Final Axial Load (kN) 0.00 -895.51
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -895.5 1520 2933 0.518 OK
Minima 9196 1410 4556 0.309 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 25800 1003 1DL24670
+ 1SIDL +4157.118
1CL + 1PLB + 0.179
1.1TLB + 1.1BTB
0.785 -0.496 3.43 -60.283
Min Fx 25833 1001 1DL24703
+ 1SIDL +3468.241
1CL + 1PLA + 6.063
1.1TLA + 1.1BTA
-2.929 0.237 -16.416 -51.592
Max Fy 25796 1005 1DL24636
+ 1SIDL +3949.919
1CL + 1PLA +34.229
1PLB + 1.1TLA
-3.621
+ 1.1TLB-0.367
+ 1.1BTA + 1.1BTB
3.24 6.777
Min Fy 25829 1006 1DL24669
+ 1SIDL +4142.218
1CL + 1PLA -27.966
+ 1PLB + 1.1TLA
-0.571
+ 1.1TLB-0.258
- 1.1BTA - 1.1BTB
0.051 -59.744
Max Fz 25829 1004 1DL24669
+ 1SIDL +4151.417
1CL + 1PLB +-15.578
1.1TLB - 1.1BTB
2.807 -0.314 -1.392 -53.557
Min Fz 25796 1001 1DL24636
+ 1SIDL +3949.397
1CL + 1PLA +21.823
1.1TLA + 1.1BTA
-8.388 -0.228 4.83 2.244
Max Mx 25833 1001 1DL24703
+ 1SIDL +3468.241
1CL + 1PLA + 6.063
1.1TLA + 1.1BTA
-2.929 0.237 -16.416 -51.592
Min Mx 25800 1003 1DL24670
+ 1SIDL +4157.118
1CL + 1PLB + 0.179
1.1TLB + 1.1BTB
0.785 -0.496 3.43 -60.283
Max My 25769 1004 1DL24640
+ 1SIDL +3927.273
1CL + 1PLB + -1.274
1.1TLB - 1.1BTB
0.045 -0.161 8.676 4.251
Min My 25835 1001 1DL24706
+ 1SIDL +3468.241
1CL + 1PLA + 0.595
1.1TLA + 1.1BTA
-0.744 0.237 -21.806 -61.265
Max Mz 25806 1006 1DL24677
+ 1SIDL +4142.218
1CL + 1PLA +-0.199
1PLB + 1.1TLA
0.101
+ 1.1TLB-0.258
- 1.1BTA - 1.1BTB
-1.349 48.303
Min Mz 25835 1005 1DL24706
+ 1SIDL +3493.401
1CL + 1PLA + 1PLB
1.912+ 1.1TLA
-0.806
+ 1.1TLB-0.034
+ 1.1BTA + -12.73
1.1BTB -93.521
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 2434 1243 1379 0.902 OK
Minima 5204 81.95 1775 0.046 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 25813 1003 1DL24683
+ 1SIDL +4157.118
1CL + 1PLB + -3.093
1.1TLB + 1.1BTB
-0.447 -0.496 1.385 -6.108
Min Fx 25846 1001 1DL24716
+ 1SIDL +3468.241
1CL + 1PLA +-4.715
1.1TLA + 1.1BTA
1.85 0.237 -5.519 -13.14
Max Fy 25813 1006 1DL24683
+ 1SIDL +4142.218
1CL + 1PLA + 1PLB
5.193+ 1.1TLA
0.131
+ 1.1TLB-0.258
- 1.1BTA - 1.1BTB
-0.383 19.049
Min Fy 25780 1005 1DL24650
+ 1SIDL +3949.919
1CL + 1PLA +-7.779
1PLB + 1.1TLA
0.769
+ 1.1TLB-0.367
+ 1.1BTA + -2.444
1.1BTB -22.988
Max Fz 25846 1001 1DL24716
+ 1SIDL +3468.241
1CL + 1PLA +-4.715
1.1TLA + 1.1BTA
1.85 0.237 -5.519 -13.14
Min Fz 25780 1004 1DL24650
+ 1SIDL +3927.273
1CL + 1PLB + 0.725
1.1TLB - 1.1BTB
-0.655 -0.161 1.799 2.86
Max Mx 25846 1001 1DL24716
+ 1SIDL +3468.241
1CL + 1PLA +-4.715
1.1TLA + 1.1BTA
1.85 0.237 -5.519 -13.14
Min Mx 25813 1003 1DL24683
+ 1SIDL +4157.118
1CL + 1PLB + -3.093
1.1TLB + 1.1BTB
-0.447 -0.496 1.385 -6.108
Max My 25813 1004 1DL24683
+ 1SIDL +4151.417
1CL + 1PLB + 2.458
1.1TLB - 1.1BTB
-0.62 -0.314 1.889 10.711
Min My 25780 1001 1DL24650
+ 1SIDL +3949.397
1CL + 1PLA +-5.004
1.1TLA + 1.1BTA
1.838 -0.228 -5.649 -14.646
Max Mz 25813 1006 1DL24683
+ 1SIDL +4142.218
1CL + 1PLA + 1PLB
5.193+ 1.1TLA
0.131
+ 1.1TLB-0.258
- 1.1BTA - 1.1BTB
-0.383 19.049
Min Mz 25780 1005 1DL24650
+ 1SIDL +3949.919
1CL + 1PLA +-7.779
1PLB + 1.1TLA
0.769
+ 1.1TLB-0.367
+ 1.1BTA + -2.444
1.1BTB -22.988
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 2434 384.1 1239 0.310 OK
Minima 5204 11.25 1664 0.007 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.7645 m
Hence de = 0.743 m and dv = 0.669 m
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30775 1005 1DL29831
+ 1SIDL 5218.422
+ 1CL + 1PLA +111.81
1PLB + 1.1TLA
-27.341
+ 1.1TLB-0.83
+ 1.1BTA181.146
+ 1.1BTB 516.536
Min Fx 30900 1001 1DL29956
+ 1SIDL 3595.392
+ 1CL + 1PLA +58.027
1.1TLA + 1.1BTA
7.191 -0.038 -101.582 185.481
Max Fy 30899 1005 1DL29955
+ 1SIDL 5139.809
+ 1CL + 1PLA116.062
+ 1PLB + 1.1TLA
-28.861
+ 1.1TLB
-0.564
+ 1.1BTA184.935
+ 1.1BTB 536.173
Min Fy 30776 1006 1DL29832
+ 1SIDL 4884.015
+ 1CL + 1PLA -29.073
+ 1PLB + 1.1TLA
13.912
+ 1.1TLB
-0.682
- 1.1BTA -122.36
- 1.1BTB -160.145
Max Fz 30776 1002 1DL29832
+ 1SIDL 4093.257
+ 1CL + 1PLA +-2.034
1.1TLA - 15.568
1.1BTA -0.592 -138.192 -50.37
Min Fz 30899 1005 1DL29955
+ 1SIDL 5139.809
+ 1CL + 1PLA116.062
+ 1PLB + 1.1TLA
-28.861
+ 1.1TLB
-0.564
+ 1.1BTA184.935
+ 1.1BTB 536.173
Max Mx 30901 1001 1DL29957
+ 1SIDL 4245.533
+ 1CL + 1PLA +84.621
1.1TLA + 1.1BTA
7.994 -0.025 -108.078 404.115
Min Mx 30774 1003 1DL29830
+ 1SIDL +3773.78
1CL + 1PLB +51.726
1.1TLB + -24.721
1.1BTB -1.06 175.409 153.844
Max My 30899 1003 1DL29955
+ 1SIDL 4338.941
+ 1CL + 1PLB +83.758
1.1TLB + -28.672
1.1BTB -0.701 193.512 400.884
Min My 30776 1002 1DL29832
+ 1SIDL 4093.257
+ 1CL + 1PLA +-2.034
1.1TLA - 15.568
1.1BTA -0.592 -138.192 -50.37
Max Mz 30899 1005 1DL29955
+ 1SIDL 5139.809
+ 1CL + 1PLA116.062
+ 1PLB + 1.1TLA
-28.861
+ 1.1TLB
-0.564
+ 1.1BTA184.935
+ 1.1BTB 536.173
Min Mz 30933 1005 1DL29993
+ 1SIDL 5139.809
+ 1CL + 1PLA + 1PLB
7.28+ 1.1TLA
-5.473
+ 1.1TLB
-0.564
+ 1.1BTA-28.932
+ 1.1BTB -178.416
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 11300 5004 6453 0.775 OK
Minima 9979 2934 6563 0.447 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30817 1005 1DL29876
+ 1SIDL 5218.422
+ 1CL + 1PLA -17.206
+ 1PLB + 1.1TLA
3.388
+ 1.1TLB-0.83
+ 1.1BTA-20.816
+ 1.1BTB -82.825
Min Fx 30959 1001 1DL30018
+ 1SIDL 3595.392
+ 1CL + 1PLA -10.163
+ 1.1TLA + -0.085
1.1BTA -0.038 6.029 -42.137
Max Fy 30835 1006 1DL29894
+ 1SIDL 4884.015
+ 1CL + 1PLA + 4.088
1PLB + 1.1TLA
-1.273
+ 1.1TLB
-0.682
- 1.1BTA -10.901
1.1BTB 21.801
Min Fy 30941 1005 1DL30000
+ 1SIDL 5139.809
+ 1CL + 1PLA +-17.86
1PLB + 1.1TLA3.67
+ 1.1TLB
-0.564
+ 1.1BTA-21.909
+ 1.1BTB -85.974
Max Fz 30941 1005 1DL30000
+ 1SIDL 5139.809
+ 1CL + 1PLA +-17.86
1PLB + 1.1TLA3.67
+ 1.1TLB
-0.564
+ 1.1BTA-21.909
+ 1.1BTB -85.974
Min Fz 30876 1002 1DL29916
+ 1SIDL 4093.257
+ 1CL + 1PLA + 0.05
1.1TLA - 1.1BTA
-1.676 -0.592 9.208 2.323
Max Mx 30977 1001 1DL30036
+ 1SIDL 4245.533
+ 1CL + 1PLA -12.825
+ 1.1TLA + -0.167
1.1BTA -0.025 6.652 -62.819
Min Mx 30799 1003 1DL29858
+ 1SIDL +3773.78
1CL + 1PLB +-9.232
1.1TLB + 1.1BTB
2.89 -1.06 -18.94 -37.444
Max My 30835 1002 1DL29894
+ 1SIDL 4093.257
+ 1CL + 1PLA +-0.299
1.1TLA - 1.1BTA
-1.405 -0.592 12.212 1.927
Min My 30941 1005 1DL30000
+ 1SIDL 5139.809
+ 1CL + 1PLA +-17.86
1PLB + 1.1TLA3.67
+ 1.1TLB
-0.564
+ 1.1BTA-21.909
+ 1.1BTB -85.974
Max Mz 30835 1006 1DL29894
+ 1SIDL 4884.015
+ 1CL + 1PLA + 4.088
1PLB + 1.1TLA
-1.273
+ 1.1TLB
-0.682
- 1.1BTA -10.901
1.1BTB 21.801
Min Mz 30941 1005 1DL30000
+ 1SIDL 5139.809
+ 1CL + 1PLA +-17.86
1PLB + 1.1TLA3.67
+ 1.1TLB
-0.564
+ 1.1BTA-21.909
+ 1.1BTB -85.974
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
ODE MDE
Maximum Tension Force (kN) -1802.72 -2557.09
Skin Friction (kN) 2904.67
Final Axial Load (kN) 0.00 0.00
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 744.8 885.6 0.841 OK
Minima 9878 544.8 2996 0.182 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.954 m
Hence de = 0.904 m and dv = 0.813 m
Horizontal resultant shear force at the section, Vu = 1225 kN
Corresponding axial compressive force, N = 11298 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 40212 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0201 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 2.060 %
Horizontal shear force, Vu = 1225 kN
Shear stress (vv = Vu /(bv . dv) = 1255.64 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.940 Mpa
= 940 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 832.311 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.50
Modified shear strength of concrete (n s vc ) = 1248.05 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 7.41 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 390.38 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30810 1005 1DL29869
+ 1SIDL 5218.422
+ 1CL + 1PLA +-1.524
1PLB + 1.1TLA
-3.187
+ 1.1TLB-0.83
+ 1.1BTA-25.628
+ 1.1BTB -171.879
Min Fx 30952 1001 1DL30011
+ 1SIDL 3595.392
+ 1CL + 1PLA +-6.152
1.1TLA + 1.1BTA
4.34 -0.038 -9.39 -113.902
Max Fy 30846 1006 1DL29905
+ 1SIDL 4462.643
+ 1CL + 1PLA + 5.714
1PLB + 1.1TLA
3.398
+ 1.1TLB
-0.677
- 1.1BTA - 1.1BTB
3.62 22.345
Min Fy 30940 1005 1DL29999
+ 1SIDL 5139.809
+ 1CL + 1PLA +-18.62
1PLB + 1.1TLA
3.507
+ 1.1TLB
-0.564
+ 1.1BTA-25.415
+ 1.1BTB -104.594
Max Fz 30846 1001 1DL29905
+ 1SIDL 4346.796
+ 1CL + 1PLA +-0.231
1.1TLA + 1.1BTA
4.531 -0.159 -7.739 -119
Min Fz 30792 1004 1DL29851
+ 1SIDL 4122.935
+ 1CL + 1PLB +-2.612
1.1TLB - 1.1BTB
-3.833 -0.553 -17.465 -8.04
Max Mx 30970 1001 1DL30029
+ 1SIDL 4245.533
+ 1CL + 1PLA +-0.297
1.1TLA + 1.1BTA
4.51 -0.025 -8.99 -126.138
Min Mx 30792 1003 1DL29851
+ 1SIDL +3773.78
1CL + 1PLB +-6.231
1.1TLB + -3.636
1.1BTB -1.06 -19.696 -104.974
Max My 30832 1002 1DL29892
+ 1SIDL 4093.257
+ 1CL + 1PLA +-1.282
1.1TLA - 1.1BTA
0.242 -0.592 13.794 0.474
Min My 30935 1005 1DL29995
+ 1SIDL 5139.809
+ 1CL + 1PLA +-8.101
1PLB + 1.1TLA
-0.99
+ 1.1TLB
-0.564
+ 1.1BTA-32.878
+ 1.1BTB -168.733
Max Mz 30828 1006 1DL29888
+ 1SIDL 4884.015
+ 1CL + 1PLA +-1.281
1PLB + 1.1TLA
3.582
+ 1.1TLB
-0.682
- 1.1BTA - 1.1BTB
7.593 38.247
Min Mz 30934 1005 1DL29993
+ 1SIDL 5139.809
+ 1CL + 1PLA +-1.582
1PLB + 1.1TLA
-2.957
+ 1.1TLB
-0.564
+ 1.1BTA-28.932
+ 1.1BTB -178.416
ODE MDE
Maximum Tension Force (kN) -1802.72 -2557.09
Skin Friction (kN) 1110.67
Final Axial Load (kN) -692.05 -1446.42
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -154.3 2004 3161 0.634 OK
Minima 9808 1033 4537 0.228 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31147 1005 1DL30203
+ 1SIDL +4868.12
1CL + 1PLA109.082
+ 1PLB + 1.1TLA
-24.827
+ 1.1TLB0.155
+ 1.1BTA160.926
+ 1.1BTB 496.237
Min Fx 31024 1001 1DL30080
+ 1SIDL 3223.753
+ 1CL + 1PLA +55.233
1.1TLA + 1.1BTA
6.399 0.685 -92.775 174.488
Max Fy 31023 1005 1DL30079
+ 1SIDL 4755.201
+ 1CL + 1PLA110.299
+ 1PLB + 1.1TLA
-27.557
+ 1.1TLB0.087
+ 1.1BTA172.984
+ 1.1BTB 501.115
Min Fy 31394 1006 1DL30450
+ 1SIDL 4519.729
+ 1CL + 1PLA -41.307
+ 1PLB + 1.1TLA
-25.029
+ 1.1TLB
-2.598
- 1.1BTA152.644
- 1.1BTB -217.905
Max Fz 31397 1001 1DL30453
+ 1SIDL 3912.368
+ 1CL + 1PLA +69.642
1.1TLA + 16.109
1.1BTA -0.349 -145.658 324.402
Min Fz 31023 1005 1DL30079
+ 1SIDL 4755.201
+ 1CL + 1PLA110.299
+ 1PLB + 1.1TLA
-27.557
+ 1.1TLB0.087
+ 1.1BTA172.984
+ 1.1BTB 501.115
Max Mx 31025 1001 1DL30081
+ 1SIDL 3895.881
+ 1CL + 1PLA +79.133
1.1TLA + 1.1BTA
7.292 0.696 -100.018 370.976
Min Mx 31396 1006 1DL30452
+ 1SIDL 4302.634
+ 1CL + 1PLA -40.911
+ 1PLB + 1.1TLA
3.961
+ 1.1TLB
-2.653
- 1.1BTA -85.637
- 1.1BTB -214.666
Max My 31023 1003 1DL30079
+ 1SIDL 4003.445
+ 1CL + 1PLB + 78.42
1.1TLB + -27.258
1.1BTB -0.496 181.054 368.665
Min My 31397 1001 1DL30453
+ 1SIDL 3912.368
+ 1CL + 1PLA +69.642
1.1TLA + 16.109
1.1BTA -0.349 -145.658 324.402
Max Mz 31023 1005 1DL30079
+ 1SIDL 4755.201
+ 1CL + 1PLA110.299
+ 1PLB + 1.1TLA
-27.557
+ 1.1TLB0.087
+ 1.1BTA172.984
+ 1.1BTB 501.115
Min Mz 31394 1006 1DL30450
+ 1SIDL 4519.729
+ 1CL + 1PLA -41.307
+ 1PLB + 1.1TLA
-25.029
+ 1.1TLB
-2.598
- 1.1BTA152.644
- 1.1BTB -217.905
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -2215 4110 4607 0.892 OK
Minima 9635 2902 6145 0.472 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31239 1005 1DL30287
+ 1SIDL +4868.12
1CL + 1PLA -14.216
+ 1PLB + 1.1TLA
2.984
+ 1.1TLB0.155
+ 1.1BTA-12.623
+ 1.1BTB -48.155
Min Fx 31124 1001 1DL30164
+ 1SIDL 3223.753
+ 1CL + 1PLA + 1.1TLA
-7.6 + 1.1BTA-0.5 0.685 5.032 -21.721
Max Fy 31478 1006 1DL30534
+ 1SIDL 4519.729
+ 1CL + 1PLA + 5.226
1PLB + 1.1TLA
3.059
+ 1.1TLB
-2.598
- 1.1BTA -12.393
- 1.1BTB 19.275
Min Fy 31115 1005 1DL30163
+ 1SIDL 4755.201
+ 1CL + 1PLA -14.378
+ 1PLB + 1.1TLA
3.342
+ 1.1TLB0.087
+ 1.1BTA-13.816
+ 1.1BTB -48.669
Max Fz 31115 1005 1DL30163
+ 1SIDL 4755.201
+ 1CL + 1PLA -14.378
+ 1PLB + 1.1TLA
3.342
+ 1.1TLB0.087
+ 1.1BTA-13.816
+ 1.1BTB -48.669
Min Fz 31505 1001 1DL30537
+ 1SIDL 3912.368
+ 1CL + 1PLA +-9.036
1.1TLA + 1.1BTA
-1.72 -0.349 9.62 -31.007
Max Mx 31133 1001 1DL30165
+ 1SIDL 3895.881
+ 1CL + 1PLA -10.255
+ 1.1TLA + 1.1BTA
-0.6 0.696 5.536 -35.314
Min Mx 31496 1006 1DL30536
+ 1SIDL 4302.634
+ 1CL + 1PLA + 5.182
1PLB + 1.1TLA
-0.162
+ 1.1TLB
-2.653
- 1.1BTA - 1.1BTB
4.093 19.05
Max My 31505 1001 1DL30537
+ 1SIDL 3912.368
+ 1CL + 1PLA +-9.036
1.1TLA + 1.1BTA
-1.72 -0.349 9.62 -31.007
Min My 31115 1003 1DL30163
+ 1SIDL 4003.445
+ 1CL + 1PLB -10.157
+ 1.1TLB + 1.1BTB
3.253 -0.496 -14.011 -35.032
Max Mz 31478 1006 1DL30534
+ 1SIDL 4519.729
+ 1CL + 1PLA + 5.226
1PLB + 1.1TLA
3.059
+ 1.1TLB
-2.598
- 1.1BTA -12.393
- 1.1BTB 19.275
Min Mz 31115 1005 1DL30163
+ 1SIDL 4755.201
+ 1CL + 1PLA -14.378
+ 1PLB + 1.1TLA
3.342
+ 1.1TLB0.087
+ 1.1BTA-13.816
+ 1.1BTB -48.669
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
ODE MDE
Maximum Tension Force (kN) -1858.53 -2825.82
Skin Friction (kN) 3631.33
Final Axial Load (kN) 0.00 0.00
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 432.2 885.2 0.488 OK
Minima 9856 273.6 2996 0.091 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.954 m
Hence de = 0.904 m and dv = 0.813 m
Horizontal resultant shear force at the section, Vu = 1222 kN
Corresponding axial compressive force, N = 10364 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 40212 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0201 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 2.060 %
Horizontal shear force, Vu = 1222 kN
Shear stress (vv = Vu /(bv . dv) = 1252.11 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.940 Mpa
= 940 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 832.311 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.46
Modified shear strength of concrete (n s vc ) = 1213.67 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 37.51 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 390.38 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31184 1005 1DL30243
+ 1SIDL +4868.12
1CL + 1PLA -12.292
+ 1PLB + 1.1TLA
0.332
+ 1.1TLB0.155
+ 1.1BTA-27.959
+ 1.1BTB -159.939
Min Fx 31078 1001 1DL30137
+ 1SIDL 3223.753
+ 1CL + 1PLA -10.169
+ 1.1TLA + 1.1BTA
2.55 0.685 -1.82 -94.493
Max Fy 31432 1006 1DL30491
+ 1SIDL 4134.326
+ 1CL + 1PLA + 5.298
1PLB + 1.1TLA
0.873
+ 1.1TLB
-2.576
- 1.1BTA -29.355
- 1.1BTB 31.695
Min Fy 31042 1005 1DL30101
+ 1SIDL 3728.086
+ 1CL + 1PLA -14.606
+ 1PLB + 1.1TLA0.76
+ 1.1TLB0.061
+ 1.1BTA-30.832
+ 1.1BTB -138.683
Max Fz 31450 1006 1DL30509
+ 1SIDL 4302.634
+ 1CL + 1PLA + 3.143
1PLB + 1.1TLA
3.028
+ 1.1TLB
-2.653
- 1.1BTA - 1.1BTB
-6.09 54.96
Min Fz 31042 1006 1DL30101
+ 1SIDL +4450.45
1CL + 1PLA + 2.087
1PLB + 1.1TLA
-0.77
+ 1.1TLB
-0.377
- 1.1BTA -15.372
- 1.1BTB 39.951
Max Mx 31096 1001 1DL30155
+ 1SIDL 3895.881
+ 1CL + 1PLA +-8.353
1.1TLA + 1.1BTA
2.613 0.696 -1.071 -114.094
Min Mx 31450 1006 1DL30509
+ 1SIDL 4302.634
+ 1CL + 1PLA + 3.143
1PLB + 1.1TLA
3.028
+ 1.1TLB
-2.653
- 1.1BTA - 1.1BTB
-6.09 54.96
Max My 31468 1001 1DL30528
+ 1SIDL 3912.368
+ 1CL + 1PLA +-7.458
1.1TLA + 1.1BTA
1.903 -0.349 12.789 -93.318
Min My 31060 1005 1DL30119
+ 1SIDL 4755.201
+ 1CL + 1PLA -12.463
+ 1PLB + 1.1TLA
0.659
+ 1.1TLB0.087
+ 1.1BTA-32.026
+ 1.1BTB -161.839
Max Mz 31414 1006 1DL30473
+ 1SIDL 4519.729
+ 1CL + 1PLA + 3.114
1PLB + 1.1TLA
0.828
+ 1.1TLB
-2.598
- 1.1BTA -29.874
- 1.1BTB 55.288
Min Mz 31060 1005 1DL30119
+ 1SIDL 4755.201
+ 1CL + 1PLA -12.463
+ 1PLB + 1.1TLA
0.659
+ 1.1TLB0.087
+ 1.1BTA-32.026
+ 1.1BTB -161.839
ODE MDE
Maximum Tension Force (kN) -1858.53 -2825.82
Skin Friction (kN) 2318.00
Final Axial Load (kN) 0.00 -507.82
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -507.8 1493 3055 0.489 OK
Minima 9640 1353 4543 0.298 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 25932 1006 1DL24802
+ 1SIDL +3633.26
1CL + 1PLA +-5.975
1PLB + 1.1TLA0.21
+ 1.1TLB
-1.118
- 1.1BTA - -21.94
1.1BTB 22.671
Min Fx 25866 1001 1DL24736
+ 1SIDL 2846.256
+ 1CL + 1PLA + 8.147
1.1TLA + -1.293
1.1BTA -0.061 -18.103 -47.65
Max Fy 25994 1005 1DL24834
+ 1SIDL 3029.437
+ 1CL + 1PLA +38.635
1PLB + 1.1TLA
-2.483
+ 1.1TLB0.164
+ 1.1BTA +-6.135
1.1BTB 19.835
Min Fy 25961 1006 1DL24801
+ 1SIDL +3633.26
1CL + 1PLA -15.127
+ 1PLB + 1.1TLA
-2.889
+ 1.1TLB
-1.118
- 1.1BTA -16.816
- 1.1BTB -12.667
Max Fz 25928 1003 1DL24768
+ 1SIDL 3050.474
+ 1CL + 1PLB +25.625
1.1TLB + 1.1BTB
6.106 -0.359 -23.916 16.306
Min Fz 25895 1001 1DL24735
+ 1SIDL 2846.256
+ 1CL + 1PLA +23.144
1.1TLA + -5.259
1.1BTA -0.061 -6.762 5.221
Max Mx 25965 1001 1DL24835
+ 1SIDL 2919.116
+ 1CL + 1PLA + 9.919
1.1TLA + -0.418
1.1BTA 0.282 -19.706 -45.425
Min Mx 25899 1006 1DL24769
+ 1SIDL 3089.231
+ 1CL + 1PLA +-3.736
1PLB + 1.1TLA
2.253
+ 1.1TLB
-1.201
- 1.1BTA - 1.1BTB
-18.4 26.998
Max My 25906 1003 1DL24777
+ 1SIDL 3050.474
+ 1CL + 1PLB +-5.364
1.1TLB + 1.1BTB
0.312 -0.359 7.485 -50.824
Min My 25932 1002 1DL24803
+ 1SIDL 3589.374
+ 1CL + 1PLA +-1.432
1.1TLA - 1.1BTA
-0.348 -0.826 -28.162 0.719
Max Mz 25935 1006 1DL24806
+ 1SIDL +3633.26
1CL + 1PLA +-0.726
1PLB + 1.1TLA
1.624
+ 1.1TLB
-1.118
- 1.1BTA -17.977
- 1.1BTB 35.308
Min Mz 25968 1005 1DL24839
+ 1SIDL 3029.437
+ 1CL + 1PLA + 0.708
1PLB + 1.1TLA
0.634
+ 1.1TLB0.164
+ 1.1BTA-10.593
+ 1.1BTB -97.49
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 2668 1251 1430 0.875 OK
Minima 4307 45.61 1692 0.027 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 25945 1006 1DL24815
+ 1SIDL +3633.26
1CL + 1PLA + 1PLB
3.23+ 1.1TLA
1.029
+ 1.1TLB
-1.118
- 1.1BTA - -1.855
1.1BTB 10.207
Min Fx 25879 1001 1DL24749
+ 1SIDL 2846.256
+ 1CL + 1PLA +-5.246
1.1TLA + 1.1BTA
1.362 -0.061 -3.493 -15.547
Max Fy 25945 1006 1DL24815
+ 1SIDL +3633.26
1CL + 1PLA + 1PLB
3.23+ 1.1TLA
1.029
+ 1.1TLB
-1.118
- 1.1BTA - -1.855
1.1BTB 10.207
Min Fy 25978 1005 1DL24848
+ 1SIDL 3029.437
+ 1CL + 1PLA +-8.519
1PLB + 1.1TLA
0.706
+ 1.1TLB0.164
+ 1.1BTA +-1.635
1.1BTB -26.007
Max Fz 25945 1002 1DL24815
+ 1SIDL 3589.374
+ 1CL + 1PLA + 0.465
1.1TLA - 1.1BTA
1.52 -0.826 -3.174 1.847
Min Fz 25912 1003 1DL24782
+ 1SIDL 3050.474
+ 1CL + 1PLB +-5.583
1.1TLB + -0.901
1.1BTB -0.359 4.213 -17.265
Max Mx 25978 1001 1DL24848
+ 1SIDL 2919.116
+ 1CL + 1PLA +-5.754
1.1TLA + 1.1BTA
1.137 0.282 -2.478 -17.702
Min Mx 25912 1006 1DL24782
+ 1SIDL 3089.231
+ 1CL + 1PLA + 2.665
1PLB + 1.1TLA
0.137
+ 1.1TLB
-1.201
- 1.1BTA - 1.1BTB
1.225 7.631
Max My 25912 1003 1DL24782
+ 1SIDL 3050.474
+ 1CL + 1PLB +-5.583
1.1TLB + -0.901
1.1BTB -0.359 4.213 -17.265
Min My 25879 1001 1DL24749
+ 1SIDL 2846.256
+ 1CL + 1PLA +-5.246
1.1TLA + 1.1BTA
1.362 -0.061 -3.493 -15.547
Max Mz 25945 1006 1DL24815
+ 1SIDL +3633.26
1CL + 1PLA + 1PLB
3.23+ 1.1TLA
1.029
+ 1.1TLB
-1.118
- 1.1BTA - -1.855
1.1BTB 10.207
Min Mz 25978 1005 1DL24848
+ 1SIDL 3029.437
+ 1CL + 1PLA +-8.519
1PLB + 1.1TLA
0.706
+ 1.1TLB0.164
+ 1.1BTA +-1.635
1.1BTB -26.007
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 2668 385.7 1293 0.298 OK
Minima 4307 15.6 1572 0.010 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.7645 m
Hence de = 0.743 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 566 kN
Corresponding axial compressive force, N = 2668 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 4536 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0023 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.339 %
Horizontal shear force, Vu = 566 kN
Shear stress (vv = Vu /(bv . dv) = 845.84 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.515 Mpa
= 515 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 478.933 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.17
Modified shear strength of concrete (n s vc ) = 560.27 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 191.05 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.61 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31519 1005 1DL30575
+ 1SIDL 5188.017
+ 1CL + 1PLA +97.098
1PLB + 1.1TLA
-22.016
+ 1.1TLB
-0.255
+ 1.1BTA149.808
+ 1.1BTB 440.298
Min Fx 31520 1001 1DL30576
+ 1SIDL 3576.077
+ 1CL + 1PLA +41.983
1.1TLA + 1.1BTA
12.61 -0.223 -129.703 103.922
Max Fy 31519 1005 1DL30575
+ 1SIDL 5188.017
+ 1CL + 1PLA +97.098
1PLB + 1.1TLA
-22.016
+ 1.1TLB
-0.255
+ 1.1BTA149.808
+ 1.1BTB 440.298
Min Fy 31518 1006 1DL30574
+ 1SIDL 4920.688
+ 1CL + 1PLA +-45.07
1PLB + 1.1TLA
-35.57
+ 1.1TLB
-2.255
- 1.1BTA203.104
- 1.1BTB -242.084
Max Fz 31525 1001 1DL30581
+ 1SIDL 4264.383
+ 1CL + 1PLA +61.129
1.1TLA + 13.795
1.1BTA -0.222 -124.555 253.815
Min Fz 31518 1006 1DL30574
+ 1SIDL 4920.688
+ 1CL + 1PLA +-45.07
1PLB + 1.1TLA
-35.57
+ 1.1TLB
-2.255
- 1.1BTA203.104
- 1.1BTB -242.084
Max Mx 31521 1005 1DL30577
+ 1SIDL 5039.345
+ 1CL + 1PLA +96.812
1PLB + 1.1TLA
10.731
+ 1.1TLB
-0.087
+ 1.1BTA
-119.281
+ 1.1BTB 437.954
Min Mx 31520 1006 1DL30576
+ 1SIDL 4635.832
+ 1CL + 1PLA -44.607
+ 1PLB + 1.1TLA
-3.854
+ 1.1TLB
-2.316
- 1.1BTA -57.587
- 1.1BTB -238.309
Max My 31518 1004 1DL30574
+ 1SIDL +4121.32
1CL + 1PLB -14.089
+ 1.1TLB - 1.1BTB
-33.7 -1.545 204.457 -112.033
Min My 31521 1001 1DL30577
+ 1SIDL 4264.383
+ 1CL + 1PLA +68.555
1.1TLA + 13.655
1.1BTA -0.222 -138.21 322.369
Max Mz 31519 1005 1DL30575
+ 1SIDL 5188.017
+ 1CL + 1PLA +97.098
1PLB + 1.1TLA
-22.016
+ 1.1TLB
-0.255
+ 1.1BTA149.808
+ 1.1BTB 440.298
Min Mz 31518 1006 1DL30574
+ 1SIDL 4920.688
+ 1CL + 1PLA +-45.07
1PLB + 1.1TLA
-35.57
+ 1.1TLB
-2.255
- 1.1BTA203.104
- 1.1BTB -242.084
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %
Reinforcement Provided
N M Mu
Eff. N M Mu M/Mu Governing Neutral Neutral M/Mu
[kN] [kNm] [kNm]
Maxima 10700 4986 6517 0.765 OK
Minima 9899 2808 6567 0.428 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31561 1005 1DL30620
+ 1SIDL 5188.017
+ 1CL + 1PLA -15.065
+ 1PLB + 1.1TLA
2.669
+ 1.1TLB
-0.255
+ 1.1BTA-16.802
+ 1.1BTB -71.842
Min Fx 31579 1001 1DL30638
+ 1SIDL 3576.077
+ 1CL + 1PLA +-7.806
1.1TLA + -0.873
1.1BTA -0.223 10.074 -30.175
Max Fy 31543 1006 1DL30602
+ 1SIDL 4920.688
+ 1CL + 1PLA + 6.429
1PLB + 1.1TLA
4.894
+ 1.1TLB
-2.255
- 1.1BTA -26.747
- 1.1BTB 33.734
Min Fy 31561 1005 1DL30620
+ 1SIDL 5188.017
+ 1CL + 1PLA -15.065
+ 1PLB + 1.1TLA
2.669
+ 1.1TLB
-0.255
+ 1.1BTA-16.802
+ 1.1BTB -71.842
Max Fz 31543 1006 1DL30602
+ 1SIDL 4920.688
+ 1CL + 1PLA + 6.429
1PLB + 1.1TLA
4.894
+ 1.1TLB
-2.255
- 1.1BTA -26.747
- 1.1BTB 33.734
Min Fz 31630 1001 1DL30689
+ 1SIDL 4264.383
+ 1CL + 1PLA +-7.973
1.1TLA + 1.1BTA
-1.43 -0.222 7.285 -21.748
Max Mx 31597 1005 1DL30656
+ 1SIDL 5039.345
+ 1CL + 1PLA -15.037
+ 1PLB + 1.1TLA
-0.61
+ 1.1TLB
-0.087
+ 1.1BTA +8.664
1.1BTB -71.619
Min Mx 31579 1006 1DL30638
+ 1SIDL 4635.832
+ 1CL + 1PLA + 6.383
1PLB + 1.1TLA1.72
+ 1.1TLB
-2.316
- 1.1BTA - -2.081
1.1BTB 33.374
Max My 31597 1001 1DL30656
+ 1SIDL 4264.383
+ 1CL + 1PLA -10.465
+ 1.1TLA + -0.979
1.1BTA -0.222 10.886 -50.841
Min My 31543 1006 1DL30602
+ 1SIDL 4920.688
+ 1CL + 1PLA + 6.429
1PLB + 1.1TLA
4.894
+ 1.1TLB
-2.255
- 1.1BTA -26.747
- 1.1BTB 33.734
Max Mz 31543 1006 1DL30602
+ 1SIDL 4920.688
+ 1CL + 1PLA + 6.429
1PLB + 1.1TLA
4.894
+ 1.1TLB
-2.255
- 1.1BTA -26.747
- 1.1BTB 33.734
Min Mz 31561 1005 1DL30620
+ 1SIDL 5188.017
+ 1CL + 1PLA -15.065
+ 1PLB + 1.1TLA
2.669
+ 1.1TLB
-0.255
+ 1.1BTA-16.802
+ 1.1BTB -71.842
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
ODE MDE
Maximum Tension Force (kN) -1515.17 3576.077
Skin Friction (kN) 2904.67
Final Axial Load (kN) 0.00 0.00
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Eff. N M Mu M/Mu Governing Neutral Neutral M/Mu
[kN] [kNm] [kNm]
Maxima 0 73.79 885.4 0.083 OK
Minima 4921 43.06 2495 0.017 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.954 m
Hence de = 0.904 m and dv = 0.813 m
Horizontal resultant shear force at the section, Vu = 1211 kN
Corresponding axial compressive force, N = 10696 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 40212 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0201 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 2.060 %
Horizontal shear force, Vu = 1211 kN
Shear stress (vv = Vu /(bv . dv) = 1240.65 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.940 Mpa
= 940 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 832.311 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.47
Modified shear strength of concrete (n s vc ) = 1225.89 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 14.40 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 390.38 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31554 1005 1DL30613
+ 1SIDL 5188.017
+ 1CL + 1PLA + 1PLB
-1.86+ 1.1TLA
-2.822
+ 1.1TLB
-0.255
+ 1.1BTA-19.458
+ 1.1BTB -151.736
Min Fx 31572 1001 1DL30631
+ 1SIDL 3576.077
+ 1CL + 1PLA +-6.417
1.1TLA + 1.1BTA
4.466 -0.223 -1.984 -91.463
Max Fy 31554 1006 1DL30613
+ 1SIDL 4547.937
+ 1CL + 1PLA + 5.372
1PLB + 1.1TLA
-1.909
+ 1.1TLB
-2.215
- 1.1BTA -42.806
- 1.1BTB 44.599
Min Fy 31536 1005 1DL30595
+ 1SIDL 4141.595
+ 1CL + 1PLA +-8.777
1PLB + 1.1TLA
-2.475
+ 1.1TLB
-0.267
+ 1.1BTA-18.681
+ 1.1BTB -137.275
Max Fz 31572 1002 1DL30631
+ 1SIDL 3883.671
+ 1CL + 1PLA +-2.792
1.1TLA - 1.1BTA
5.069 -1.737 -18.172 6.897
Min Fz 31554 1003 1DL30613
+ 1SIDL 4428.214
+ 1CL + 1PLB +-0.464
1.1TLB + -3.006
1.1BTB -0.924 -30.035 -102.907
Max Mx 31590 1005 1DL30649
+ 1SIDL 5039.345
+ 1CL + 1PLA +-1.923
1PLB + 1.1TLA
4.379
+ 1.1TLB
-0.087
+ 1.1BTA +-4.353
1.1BTB -151.602
Min Mx 31572 1006 1DL30631
+ 1SIDL 4635.832
+ 1CL + 1PLA +-1.485
1PLB + 1.1TLA
4.947
+ 1.1TLB
-2.316
- 1.1BTA -28.474
- 1.1BTB 58.931
Max My 31590 1001 1DL30650
+ 1SIDL 4264.383
+ 1CL + 1PLA +-0.567
1.1TLA + 1.1BTA
4.691 -0.222 3.211 -103.125
Min My 31536 1006 1DL30596
+ 1SIDL 4920.688
+ 1CL + 1PLA +-1.585
1PLB + 1.1TLA
-2.033
+ 1.1TLB
-2.255
- 1.1BTA -45.115
- 1.1BTB 60.737
Max Mz 31536 1006 1DL30596
+ 1SIDL 4920.688
+ 1CL + 1PLA +-1.585
1PLB + 1.1TLA
-2.033
+ 1.1TLB
-2.255
- 1.1BTA -45.115
- 1.1BTB 60.737
Min Mz 31554 1005 1DL30613
+ 1SIDL 5188.017
+ 1CL + 1PLA + 1PLB
-1.86+ 1.1TLA
-2.822
+ 1.1TLB
-0.255
+ 1.1BTA-19.458
+ 1.1BTB -151.736
ODE MDE
Maximum Tension Force (kN) -1515.17 -2223.06
Skin Friction (kN) 1110.67
Final Axial Load (kN) -404.50 -1112.39
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -1112 1982 2865 0.692 OK
Minima 9944 1597 4532 0.353 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26779 1002 1DL25729
+ 1SIDL 3671.011
+ 1CL + 1PLA +-0.593
1.1TLA - -0.471
1.1BTA -0.78 -32.612 0.457
Min Fx 26779 1005 1DL25729
+ 1SIDL 3630.198
+ 1CL + 1PLA +13.848
1PLB + 1.1TLA
2.337
+ 1.1TLB
-0.043
+ 1.1BTA-16.206
+ 1.1BTB -68.356
Max Fy 26808 1005 1DL25728
+ 1SIDL 3630.198
+ 1CL + 1PLA +37.437
1PLB + 1.1TLA
2.144
+ 1.1TLB
-0.043
+ 1.1BTA-23.005
+ 1.1BTB 17.971
Min Fy 26808 1006 1DL25728
+ 1SIDL 3668.137
+ 1CL + 1PLA-13.422
+ 1PLB + 1.1TLA
-3.386
+ 1.1TLB
-0.973
- 1.1BTA-22.683
- 1.1BTB -6.72
Max Fz 26808 1003 1DL25728
+ 1SIDL 3649.374
+ 1CL + 1PLB +23.992
1.1TLB + 1.1BTB
4.625 -0.35 -24.263 9.684
Min Fz 26808 1002 1DL25728
+ 1SIDL 3671.011
+ 1CL + 1PLA +-1.231
1.1TLA - 1.1BTA
-5.83 -0.78 -21.195 -2.547
Max Mx 26779 1005 1DL25729
+ 1SIDL 3630.198
+ 1CL + 1PLA +13.848
1PLB + 1.1TLA
2.337
+ 1.1TLB
-0.043
+ 1.1BTA-16.206
+ 1.1BTB -68.356
Min Mx 26779 1006 1DL25729
+ 1SIDL 3668.137
+ 1CL + 1PLA +-4.984
1PLB + 1.1TLA
0.456
+ 1.1TLB
-0.973
- 1.1BTA-28.437
- 1.1BTB 24.253
Max My 26787 1003 1DL25738
+ 1SIDL 3649.374
+ 1CL + 1PLB +-6.514
1.1TLB + 1.1BTB
0.271 -0.35 4.521 -42.36
Min My 26779 1002 1DL25730
+ 1SIDL 3671.011
+ 1CL + 1PLA +-0.593
1.1TLA - -0.471
1.1BTA -0.78 -33.082 1.05
Max Mz 26782 1006 1DL25733
+ 1SIDL 3668.137
+ 1CL + 1PLA + 1PLB
-0.23 + 1.1TLA
2.176
+ 1.1TLB
-0.973
- 1.1BTA-22.806
- 1.1BTB 33.968
Min Mz 26782 1005 1DL25733
+ 1SIDL 3630.198
+ 1CL + 1PLA + 0.572
1PLB + 1.1TLA
2.046
+ 1.1TLB
-0.043
+ 1.1BTA +-7.384
1.1BTB -95.197
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 3582 1245 1465 0.850 OK
Minima 3973 96.51 1526 0.063 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.766 m
Hence de = 0.744 m and dv = 0.669 m
Horizontal resultant shear force at the section, Vu = 565 kN
Corresponding axial compressive force, N = 3582 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 3217 mm2
Effective area of tensile steel = 50% of total steel = As = 0.0016 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.240 %
Horizontal shear force, Vu = 565 kN
Shear stress (vv = Vu /(bv . dv) = 843.83 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.459 Mpa
= 459 kN/m2
1/4
Depth Factor, s = (500/d) or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 426.930 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/Ac) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.23
Modified shear strength of concrete (n s vc ) = 524.28 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 213.92 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.78 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30339 1005 1DL29383
+ 1SIDL 4612.376
+ 1CL + 1PLA +93.247
1PLB + 1.1TLA
-9.834
+ 1.1TLB
-0.473
+ 1.1BTA +80.393
1.1BTB 414.166
Min Fx 30340 1001 1DL29384
+ 1SIDL 3049.483
+ 1CL + 1PLA +46.065
1.1TLA + 12.309
1.1BTA -0.07 -123.659 130.658
Max Fy 30339 1005 1DL29383
+ 1SIDL 4612.376
+ 1CL + 1PLA +93.247
1PLB + 1.1TLA
-9.834
+ 1.1TLB
-0.473
+ 1.1BTA +80.393
1.1BTB 414.166
Min Fy 30338 1006 1DL29382
+ 1SIDL 4359.919
+ 1CL + 1PLA -36.022
+ 1PLB + 1.1TLA
-28.561
+ 1.1TLB
-2.367
- 1.1BTA -153.81
1.1BTB -188.831
Max Fz 30341 1005 1DL29385
+ 1SIDL 4432.949
+ 1CL + 1PLA +92.795
1PLB + 1.1TLA
18.525
+ 1.1TLB
-0.309
+ 1.1BTA
-152.627
+ 1.1BTB 410.439
Min Fz 30338 1006 1DL29382
+ 1SIDL 4359.919
+ 1CL + 1PLA -36.022
+ 1PLB + 1.1TLA
-28.561
+ 1.1TLB
-2.367
- 1.1BTA -153.81
1.1BTB -188.831
Max Mx 30340 1001 1DL29384
+ 1SIDL 3049.483
+ 1CL + 1PLA +46.065
1.1TLA + 12.309
1.1BTA -0.07 -123.659 130.658
Min Mx 30340 1006 1DL29384
+ 1SIDL 3984.184
+ 1CL + 1PLA -35.307
+ 1PLB + 1.1TLA-1.35
+ 1.1TLB
-2.413
- 1.1BTA -69.863
- 1.1BTB -182.972
Max My 30338 1006 1DL29382
+ 1SIDL 4359.919
+ 1CL + 1PLA -36.022
+ 1PLB + 1.1TLA
-28.561
+ 1.1TLB
-2.367
- 1.1BTA -153.81
1.1BTB -188.831
Min My 30341 1005 1DL29385
+ 1SIDL 4432.949
+ 1CL + 1PLA +92.795
1PLB + 1.1TLA
18.525
+ 1.1TLB
-0.309
+ 1.1BTA
-152.627
+ 1.1BTB 410.439
Max Mz 30339 1005 1DL29383
+ 1SIDL 4612.376
+ 1CL + 1PLA +93.247
1PLB + 1.1TLA
-9.834
+ 1.1TLB
-0.473
+ 1.1BTA +80.393
1.1BTB 414.166
Min Mz 30338 1006 1DL29382
+ 1SIDL 4359.919
+ 1CL + 1PLA -36.022
+ 1PLB + 1.1TLA
-28.561
+ 1.1TLB
-2.367
- 1.1BTA -153.81
1.1BTB -188.831
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -2291 4102 5242 0.783 OK
Minima -2608 3068 5151 0.596 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30381 1005 1DL29428
+ 1SIDL 4612.376
+ 1CL + 1PLA -14.597
+ 1PLB + 1.1TLA
0.991
+ 1.1TLB
-0.473
+ 1.1BTA +-7.643
1.1BTB -68.904
Min Fx 30399 1001 1DL29446
+ 1SIDL 3049.483
+ 1CL + 1PLA +-8.316
1.1TLA + -0.896
1.1BTA -0.07 9.803 -33.28
Max Fy 30363 1006 1DL29410
+ 1SIDL 4359.919
+ 1CL + 1PLA + 5.208
1PLB + 1.1TLA
4.068
+ 1.1TLB
-2.367
- 1.1BTA -21.382
- 1.1BTB 26.914
Min Fy 30381 1005 1DL29428
+ 1SIDL 4612.376
+ 1CL + 1PLA -14.597
+ 1PLB + 1.1TLA
0.991
+ 1.1TLB
-0.473
+ 1.1BTA +-7.643
1.1BTB -68.904
Max Fz 30363 1006 1DL29410
+ 1SIDL 4359.919
+ 1CL + 1PLA + 5.208
1PLB + 1.1TLA
4.068
+ 1.1TLB
-2.367
- 1.1BTA -21.382
- 1.1BTB 26.914
Min Fz 30449 1005 1DL29469
+ 1SIDL 4432.949
+ 1CL + 1PLA -12.155
+ 1PLB + 1.1TLA
-2.056
+ 1.1TLB
-0.309
+ 1.1BTA +10.547
1.1BTB -40.559
Max Mx 30399 1001 1DL29446
+ 1SIDL 3049.483
+ 1CL + 1PLA +-8.316
1.1TLA + -0.896
1.1BTA -0.07 9.803 -33.28
Min Mx 30399 1006 1DL29446
+ 1SIDL 3984.184
+ 1CL + 1PLA + 5.136
1PLB + 1.1TLA
1.345
+ 1.1TLB
-2.413
- 1.1BTA - -0.219
1.1BTB 26.358
Max My 30417 1005 1DL29464
+ 1SIDL 4432.949
+ 1CL + 1PLA -14.552
+ 1PLB + 1.1TLA
-1.849
+ 1.1TLB
-0.309
+ 1.1BTA +14.411
1.1BTB -68.552
Min My 30363 1006 1DL29410
+ 1SIDL 4359.919
+ 1CL + 1PLA + 5.208
1PLB + 1.1TLA
4.068
+ 1.1TLB
-2.367
- 1.1BTA -21.382
- 1.1BTB 26.914
Max Mz 30363 1006 1DL29410
+ 1SIDL 4359.919
+ 1CL + 1PLA + 5.208
1PLB + 1.1TLA
4.068
+ 1.1TLB
-2.367
- 1.1BTA -21.382
- 1.1BTB 26.914
Min Mz 30381 1005 1DL29428
+ 1SIDL 4612.376
+ 1CL + 1PLA -14.597
+ 1PLB + 1.1TLA
0.991
+ 1.1TLB
-0.473
+ 1.1BTA +-7.643
1.1BTB -68.904
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
ODE MDE
Maximum Tension Force (kN) -1862.74 -2607.59
Skin Friction (kN) 2904.67
Final Axial Load (kN) 0.00 0.00
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 750.3 884.6 0.848 OK
Minima 9786 538 2997 0.180 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.954 m
Hence de = 0.904 m and dv = 0.813 m
Horizontal resultant shear force at the section, Vu = 1210 kN
Corresponding axial compressive force, N = 10294 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 40212 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0201 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 2.060 %
Horizontal shear force, Vu = 1210 kN
Shear stress (vv = Vu /(bv . dv) = 1239.77 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.940 Mpa
= 940 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 832.311 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.46
Modified shear strength of concrete (n s vc ) = 1211.09 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 27.99 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 390.38 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30374 1005 1DL29421
+ 1SIDL 4612.376
+ 1CL + 1PLA +-2.349
1PLB + 1.1TLA
-2.136
+ 1.1TLB
-0.473
+ 1.1BTA + 1.1BTB
-4.66 -148.312
Min Fx 30392 1001 1DL29439
+ 1SIDL 3049.483
+ 1CL + 1PLA +-5.961
1.1TLA + 1.1BTA
4.169 -0.07 -1.056 -95.384
Max Fy 30362 1006 1DL29409
+ 1SIDL 4359.919
+ 1CL + 1PLA + 5.291
1PLB + 1.1TLA
4.106
+ 1.1TLB
-2.367
- 1.1BTA -25.488
- 1.1BTB 32.205
Min Fy 30379 1005 1DL29426
+ 1SIDL 4612.376
+ 1CL + 1PLA -15.396
+ 1PLB + 1.1TLA
0.537
+ 1.1TLB
-0.473
+ 1.1BTA +-8.997
1.1BTB -99.621
Max Fz 30392 1002 1DL29439
+ 1SIDL 3328.963
+ 1CL + 1PLA +-2.237
1.1TLA - 1.1BTA
4.993 -1.553 -23.187 -3.04
Min Fz 30374 1003 1DL29421
+ 1SIDL +3933.48
1CL + 1PLB +-0.843
1.1TLB + -2.235
1.1BTB -1.408 -14.404 -104.919
Max Mx 30392 1001 1DL29439
+ 1SIDL 3049.483
+ 1CL + 1PLA +-5.961
1.1TLA + 1.1BTA
4.169 -0.07 -1.056 -95.384
Min Mx 30392 1006 1DL29439
+ 1SIDL 3984.184
+ 1CL + 1PLA +-0.808
1PLB + 1.1TLA
4.959
+ 1.1TLB
-2.413
- 1.1BTA -24.835
- 1.1BTB 48.335
Max My 30413 1005 1DL29461
+ 1SIDL 4432.949
+ 1CL + 1PLA -13.303
+ 1PLB + 1.1TLA0.51
+ 1.1TLB
-0.309
+ 1.1BTA +17.07
1.1BTB -113.756
Min My 30356 1006 1DL29404
+ 1SIDL 4359.919
+ 1CL + 1PLA +-0.964
1PLB + 1.1TLA
-1.03
+ 1.1TLB
-2.367
- 1.1BTA -38.397
- 1.1BTB 49.635
Max Mz 30356 1006 1DL29404
+ 1SIDL 4359.919
+ 1CL + 1PLA +-0.964
1PLB + 1.1TLA
-1.03
+ 1.1TLB
-2.367
- 1.1BTA -38.397
- 1.1BTB 49.635
Min Mz 30374 1005 1DL29421
+ 1SIDL 4612.376
+ 1CL + 1PLA +-2.349
1PLB + 1.1TLA
-2.136
+ 1.1TLB
-0.473
+ 1.1BTA + 1.1BTB
-4.66 -148.312
ODE MDE
Maximum Tension Force (kN) -1862.74 -2607.59
Skin Friction (kN) 1110.67
Final Axial Load (kN) -752.07 -1496.92
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -741.5 2002 2982 0.671 OK
Minima 9786 854.9 4538 0.188 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26231 1004 1DL25169
+ 1SIDL 5104.091
+ 1CL + 1PLB + 0.519
1.1TLB - 1.1BTB
-6.476 -0.315 20.395 1.561
Min Fx 26231 1001 1DL25169
+ 1SIDL 4573.149
+ 1CL + 1PLA + 9.57
1.1TLA + -7.053
1.1BTA 0.055 -22.729 -84.046
Max Fy 26260 1005 1DL25168
+ 1SIDL 5081.438
+ 1CL + 1PLA +38.972
1PLB + 1.1TLA
-15.828
+ 1.1TLB
-0.109
+ 1.1BTA +35.54
1.1BTB -34.446
Min Fy 26242 1005 1DL25180
+ 1SIDL 5081.438
+ 1CL + 1PLA -15.279
+ 1PLB + 1.1TLA3.66
+ 1.1TLB
-0.109
+ 1.1BTA-29.634
+ 1.1BTB -94.425
Max Fz 26243 1001 1DL25181
+ 1SIDL 4573.149
+ 1CL + 1PLA +-9.618
1.1TLA + 1.1BTA
4.355 0.055 -26.08 -50.703
Min Fz 26260 1005 1DL25168
+ 1SIDL 5081.438
+ 1CL + 1PLA +38.972
1PLB + 1.1TLA
-15.828
+ 1.1TLB
-0.109
+ 1.1BTA +35.54
1.1BTB -34.446
Max Mx 26231 1001 1DL25169
+ 1SIDL 4573.149
+ 1CL + 1PLA + 9.57
1.1TLA + -7.053
1.1BTA 0.055 -22.729 -84.046
Min Mx 26231 1006 1DL25169
+ 1SIDL 5084.389
+ 1CL + 1PLA +-4.416
1PLB + 1.1TLA
-7.522
+ 1.1TLB
-0.459
- 1.1BTA - 1.1BTB
8.067 42.032
Max My 26260 1004 1DL25168
+ 1SIDL 5104.091
+ 1CL + 1PLB + 0.746
1.1TLB - 1.1BTB
-9.219 -0.315 45.253 3.567
Min My 26236 1001 1DL25175
+ 1SIDL 4573.149
+ 1CL + 1PLA +-2.813
1.1TLA + -0.554
1.1BTA 0.055 -43.037 -98.97
Max Mz 26234 1006 1DL25173
+ 1SIDL 5084.389
+ 1CL + 1PLA +-0.096
1PLB + 1.1TLA
-4.214
+ 1.1TLB
-0.459
- 1.1BTA -15.093
- 1.1BTB 50.481
Min Mz 26234 1005 1DL25173
+ 1SIDL 5081.438
+ 1CL + 1PLA + 1.449
1PLB + 1.1TLA-4.27
+ 1.1TLB
-0.109
+ 1.1BTA-30.419
+ 1.1BTB -157.801
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 6043 1948 2707 0.720 OK
Minima 5115 335.2 2535 0.132 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.9645 m
Hence de = 0.907 m and dv = 0.816 m
Horizontal resultant shear force at the section, Vu = 594 kN
Corresponding axial compressive force, N = 4510 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 4536 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0023 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.232 %
Horizontal shear force, Vu = 594 kN
Shear stress (vv = Vu /(bv . dv) = 606.00 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.454 Mpa
= 454 kN/m2
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26264 1004 1DL25202
+ 1SIDL 6136.562
+ 1CL + 1PLB +-7.447
1.1TLB - -13.914
1.1BTB -1.393 27.946 -12.794
Min Fx 26561 1001 1DL25499
+ 1SIDL 3641.237
+ 1CL + 1PLA + 5.858
1.1TLA + -0.803
1.1BTA 0.283 -32.014 -90.604
Max Fy 26326 1005 1DL25234
+ 1SIDL 5631.835
+ 1CL + 1PLA +51.606
1PLB + 1.1TLA
-28.087
+ 1.1TLB
-0.458
+ 1.1BTA +81.908
1.1BTB 15.104
Min Fy 26293 1006 1DL25201
+ 1SIDL 6116.799
+ 1CL + 1PLA -24.016
+ 1PLB + 1.1TLA
-24.557
+ 1.1TLB
-2.015
- 1.1BTA -75.883
1.1BTB -31.969
Max Fz 26590 1004 1DL25498
+ 1SIDL 4043.936
+ 1CL + 1PLB +-5.231
1.1TLB - 1.1BTB
8.51 -0.461 -20.531 -19.41
Min Fz 26326 1005 1DL25234
+ 1SIDL 5631.835
+ 1CL + 1PLA +51.606
1PLB + 1.1TLA
-28.087
+ 1.1TLB
-0.458
+ 1.1BTA +81.908
1.1BTB 15.104
Max Mx 26264 1005 1DL25202
+ 1SIDL 6008.191
+ 1CL + 1PLA + 8.286
1PLB + 1.1TLA
-15.158
+ 1.1TLB0.334
+ 1.1BTA +7.331
1.1BTB -137.332
Min Mx 26297 1006 1DL25235
+ 1SIDL 5200.492
+ 1CL + 1PLA + 1.493
1PLB + 1.1TLA
-13.206
+ 1.1TLB
-3.158
- 1.1BTA - -1.184
1.1BTB 50.871
Max My 26293 1004 1DL25201
+ 1SIDL 6136.562
+ 1CL + 1PLB -11.632
+ 1.1TLB - -21.342
1.1BTB -1.393 84.241 -43.317
Min My 26600 1002 1DL25539
+ 1SIDL 4224.246
+ 1CL + 1PLA + 0.296
1.1TLA - 1.1BTA
-2.007 -1.754 -68.554 -3.319
Max Mz 26270 1006 1DL25209
+ 1SIDL 6116.799
+ 1CL + 1PLA +-0.739
1PLB + 1.1TLA
-4.145
+ 1.1TLB
-2.015
- 1.1BTA -49.008
- 1.1BTB 66.763
Min Mz 26301 1005 1DL25240
+ 1SIDL 5631.835
+ 1CL + 1PLA + 2.632
1PLB + 1.1TLA
-7.115
+ 1.1TLB
-0.458
+ 1.1BTA-48.289
+ 1.1BTB -170.318
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 3161 1970 2133 0.924 OK
Minima 4496 150.9 2474 0.061 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.9645 m
Hence de = 0.907 m and dv = 0.816 m
Horizontal resultant shear force at the section, Vu = 625 kN
Corresponding axial compressive force, N = 6880 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 5104 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0026 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.260 %
Horizontal shear force, Vu = 625 kN
Shear stress (vv = Vu /(bv . dv) = 637.55 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.472 Mpa
= 472 kN/m2
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26363 1003 1DL25301
+ 1SIDL 6672.765
+ 1CL + 1PLB + 11.55
1.1TLB + -14.18
1.1BTB -4.964 23.646 -79.266
Min Fx 26396 1001 1DL25334
+ 1SIDL +4645.65
1CL + 1PLA + 8.194
1.1TLA + -8.473
1.1BTA -0.3 -20.126 -85.518
Max Fy 26557 1005 1DL25465
+ 1SIDL 5766.438
+ 1CL + 1PLA +43.119
1PLB + 1.1TLA
-21.019
+ 1.1TLB 1.32
+ 1.1BTA +55.105
1.1BTB -20.665
Min Fy 26539 1005 1DL25477
+ 1SIDL 5766.438
+ 1CL + 1PLA -16.008
+ 1PLB + 1.1TLA
4.455
+ 1.1TLB 1.32
+ 1.1BTA-37.963
+ 1.1BTB -101.402
Max Fz 26375 1001 1DL25313
+ 1SIDL 5789.656
+ 1CL + 1PLA +-9.646
1.1TLA + 1.1BTA
6.041 -3.386 -40.564 -51.29
Min Fz 26392 1005 1DL25300
+ 1SIDL 6671.388
+ 1CL + 1PLA +39.294
1PLB + 1.1TLA
-25.956
+ 1.1TLB
-3.932
+ 1.1BTA +74.484
1.1BTB -30.22
Max Mx 26528 1005 1DL25466
+ 1SIDL 5766.438
+ 1CL + 1PLA +18.073
1PLB + 1.1TLA
-12.238
+ 1.1TLB 1.32
+ 1.1BTA +1.365
1.1BTB -122.733
Min Mx 26363 1006 1DL25301
+ 1SIDL 6342.342
+ 1CL + 1PLA +-1.185
1PLB + 1.1TLA
-11.594
+ 1.1TLB
-7.219
- 1.1BTA - 1.1BTB
2.919 47.65
Max My 26392 1003 1DL25300
+ 1SIDL 6672.765
+ 1CL + 1PLB +27.637
1.1TLB + -22.219
1.1BTB -4.964 81.898 -13.884
Min My 26369 1001 1DL25308
+ 1SIDL 5789.656
+ 1CL + 1PLA +-3.671
1.1TLA + -2.265
1.1BTA -3.386 -59.467 -95.328
Max Mz 26400 1006 1DL25339
+ 1SIDL 5196.907
+ 1CL + 1PLA +-0.308
1PLB + 1.1TLA
-3.925
+ 1.1TLB
-2.204
- 1.1BTA -53.019
- 1.1BTB 53.302
Min Mz 26531 1005 1DL25470
+ 1SIDL 5766.438
+ 1CL + 1PLA + 1PLB
2.9+ 1.1TLA
-6.259
+ 1.1TLB 1.32
+ 1.1BTA-35.022
+ 1.1BTB -162.732
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 3793 1588 2215 0.717 OK
Minima 7204 289.1 2852 0.101 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.966 m
Hence de = 0.907 m and dv = 0.817 m
Horizontal resultant shear force at the section, Vu = 591 kN
Corresponding axial compressive force, N = 5270 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 4423 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0022 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.226 %
Horizontal shear force, Vu = 591 kN
Shear stress (vv = Vu /(bv . dv) = 602.79 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.450 Mpa
= 450 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 397.815 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.23
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
PILE DESIGN FOR GROUP C52, C54 TO C56 & C58 TO C60
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13500 1005 1DL11562
+ 1SIDL 2292.735
+ 1CL + 1PLA +13.717
1PLB + 1.1TLA
27.134
+ 1.1TLB
-0.048
+ 1.1BTA-59.199
+ 1.1BTB -68.593
Min Fx 13302 1001 1DL11364
+ 1SIDL 1482.021
+ 1CL + 1PLA + 7.669
1.1TLA + 17.912
1.1BTA 0.292 -52.973 -48.29
Max Fy 13529 1005 1DL11561
+ 1SIDL 2292.735
+ 1CL + 1PLA +37.215
1PLB + 1.1TLA
44.293
+ 1.1TLB
-0.048
+ 1.1BTA-174.264
+ 1.1BTB 17.164
Min Fy 13529 1006 1DL11561
+ 1SIDL 1933.417
+ 1CL + 1PLA +-11.38
1PLB + 1.1TLA
35.355
+ 1.1TLB
-0.904
- 1.1BTA-145.686
- 1.1BTB -8.973
Max Fz 13463 1004 1DL11495
+ 1SIDL 2243.635
+ 1CL + 1PLB +-1.232
1.1TLB - 1.1BTB
50.934 -0.476 -179.914 -7.385
Min Fz 13446 1004 1DL11508
+ 1SIDL 2243.635
+ 1CL + 1PLB + 0.111
1.1TLB - 1.1BTB
-8.149 -0.476 43.193 0.974
Max Mx 13302 1001 1DL11364
+ 1SIDL 1482.021
+ 1CL + 1PLA + 7.669
1.1TLA + 17.912
1.1BTA 0.292 -52.973 -48.29
Min Mx 13566 1006 1DL11628
+ 1SIDL 1689.226
+ 1CL + 1PLA +-0.014
1PLB + 1.1TLA
23.262
+ 1.1TLB
-1.502
- 1.1BTA -62.696
- 1.1BTB 25.839
Max My 13441 1004 1DL11504
+ 1SIDL 2243.635
+ 1CL + 1PLB +-0.266
1.1TLB - 1.1BTB
1.051 -0.476 66.954 0.918
Min My 13463 1004 1DL11495
+ 1SIDL 2243.635
+ 1CL + 1PLB +-1.232
1.1TLB - 1.1BTB
50.934 -0.476 -179.914 -7.385
Max Mz 13371 1006 1DL11434
+ 1SIDL 2075.256
+ 1CL + 1PLA +-0.142
1PLB + 1.1TLA
13.855
+ 1.1TLB-0.46
- 1.1BTA -28.965
1.1BTB 28.943
Min Mz 13503 1005 1DL11566
+ 1SIDL 2292.735
+ 1CL + 1PLA + 0.504
1PLB + 1.1TLA
14.696
+ 1.1TLB
-0.048
+ 1.1BTA +23.275
1.1BTB -95.042
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -434.5 1165 1316 0.885 OK
Minima 1542 493.1 1808 0.273 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.103 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13513 1005 1DL11575
+ 1SIDL 2292.735
+ 1CL + 1PLA +-8.247
1PLB + 1.1TLA
-6.518
+ 1.1TLB
-0.048
+ 1.1BTA +30.563
1.1BTB -25.042
Min Fx 13315 1001 1DL11377
+ 1SIDL 1482.021
+ 1CL + 1PLA +-5.111
1.1TLA + -3.604
1.1BTA 0.292 18.822 -14.969
Max Fy 13381 1006 1DL11443
+ 1SIDL 2075.256
+ 1CL + 1PLA + 2.508
1PLB + 1.1TLA
-6.743
+ 1.1TLB-0.46
- 1.1BTA -30.602
1.1BTB 7.606
Min Fy 13513 1005 1DL11575
+ 1SIDL 2292.735
+ 1CL + 1PLA +-8.247
1PLB + 1.1TLA
-6.518
+ 1.1TLB
-0.048
+ 1.1BTA +30.563
1.1BTB -25.042
Max Fz 28516 1004 1DL27500
+ 1SIDL 2243.635
+ 1CL + 1PLB +-0.008
1.1TLB - 1.1BTB
0.777 -0.476 -1.89 -0.025
Min Fz 13447 1004 1DL11509
+ 1SIDL 2243.635
+ 1CL + 1PLB + 0.127
1.1TLB - 1.1BTB
-7.934 -0.476 35.044 0.862
Max Mx 13315 1001 1DL11377
+ 1SIDL 1482.021
+ 1CL + 1PLA +-5.111
1.1TLA + -3.604
1.1BTA 0.292 18.822 -14.969
Min Mx 13579 1006 1DL11641
+ 1SIDL 1689.226
+ 1CL + 1PLA + 1.304
1PLB + 1.1TLA
-4.987
+ 1.1TLB
-1.502
- 1.1BTA -25.039
1.1BTB 2.534
Max My 13447 1004 1DL11509
+ 1SIDL 2243.635
+ 1CL + 1PLB + 0.127
1.1TLB - 1.1BTB
-7.934 -0.476 35.044 0.862
Min My 28513 1004 1DL27498
+ 1SIDL 2243.635
+ 1CL + 1PLB + 0.027
1.1TLB - 1.1BTB
-0.275 -0.476 -2.901 -0.017
Max Mz 13513 1006 1DL11575
+ 1SIDL 1933.417
+ 1CL + 1PLA + 2.442
1PLB + 1.1TLA
-5.061
+ 1.1TLB
-0.904
- 1.1BTA -24.428
1.1BTB 7.676
Min Mz 13513 1005 1DL11575
+ 1SIDL 2292.735
+ 1CL + 1PLA +-8.247
1PLB + 1.1TLA
-6.518
+ 1.1TLB
-0.048
+ 1.1BTA +30.563
1.1BTB -25.042
ODE MDE
Maximum Tension Force (kN) 27.34 1482.021
Skin Friction (kN) 2684.00
Final Axial Load (kN) 0.00 0.00
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 39.52 517.7 0.076 OK
Minima 2244 2.138 1195 0.002 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.7595 m
Hence de = 0.742 m and dv = 0.668 m
Horizontal resultant shear force at the section, Vu = 591 kN
Corresponding axial compressive force, N = 4105 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 10568 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0053 m2
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13335 1005 1DL11397
+ 1SIDL 1120.585
+ 1CL + 1PLA + 7.111
1PLB + 1.1TLA
3.253
+ 1.1TLB 0.13
+ 1.1BTA-14.121
+ 1.1BTB -83.534
Min Fx 13335 1006 1DL11397
+ 1SIDL +965.822
1CL + 1PLA +-3.739
1PLB + 1.1TLA3.03
+ 1.1TLB
-0.154
- 1.1BTA - 1.1BTB
-4.98 23.316
Max Fy 13364 1005 1DL11396
+ 1SIDL 1120.585
+ 1CL + 1PLA +26.512
1PLB + 1.1TLA
4.253
+ 1.1TLB 0.13
+ 1.1BTA-25.949
+ 1.1BTB -25.64
Min Fy 13364 1006 1DL11396
+ 1SIDL +965.822
1CL + 1PLA +-10.84
1PLB + 1.1TLA
5.191
+ 1.1TLB
-0.154
- 1.1BTA -18.285
- 1.1BTB -1.355
Max Fz 13364 1004 1DL11396
+ 1SIDL 1035.089
+ 1CL + 1PLB +-1.788
1.1TLB - 1.1BTB
7.955 -0.084 -16.148 -7.247
Min Fz 13346 1004 1DL11408
+ 1SIDL 1035.089
+ 1CL + 1PLB + 0.246
1.1TLB - 1.1BTB
-1.681 -0.084 8.706 1.74
Max Mx 13335 1001 1DL11397
+ 1SIDL +1043.23
1CL + 1PLA + 4.318
1.1TLA + 1.1BTA
2.142 0.219 -22.126 -55.626
Min Mx 13335 1006 1DL11397
+ 1SIDL +965.822
1CL + 1PLA +-3.739
1PLB + 1.1TLA3.03
+ 1.1TLB
-0.154
- 1.1BTA - 1.1BTB
-4.98 23.316
Max My 13340 1004 1DL11403
+ 1SIDL 1035.089
+ 1CL + 1PLB +-0.396
1.1TLB - 1.1BTB
0.288 -0.084 14.023 1.705
Min My 13364 1001 1DL11396
+ 1SIDL +1043.23
1CL + 1PLA +16.836
1.1TLA + 1.1BTA
0.871 0.219 -26.323 -19.1
Max Mz 13337 1006 1DL11400
+ 1SIDL +965.822
1CL + 1PLA +-0.824
1PLB + 1.1TLA1.95
+ 1.1TLB
-0.154
- 1.1BTA - 1.1BTB
2.45 29.999
Min Mz 13336 1005 1DL11399
+ 1SIDL 1120.585
+ 1CL + 1PLA + 2.829
1PLB + 1.1TLA
2.901
+ 1.1TLB 0.13
+ 1.1BTA +-7.967
1.1BTB -93.474
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -1665 955.8 1415 0.676 OK
Minima 2367 371.8 2333 0.159 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.103 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13348 1005 1DL11410
+ 1SIDL 1120.585
+ 1CL + 1PLA +-6.687
1PLB + 1.1TLA
-0.428
+ 1.1TLB 0.13
+ 1.1BTA + 1.1BTB
2.98 -17.653
Min Fx 13348 1006 1DL11410
+ 1SIDL +965.822
1CL + 1PLA + 1PLB
2.48+ 1.1TLA
-0.81
+ 1.1TLB
-0.154
- 1.1BTA - 1.1BTB
3.571 7.276
Max Fy 13348 1006 1DL11410
+ 1SIDL +965.822
1CL + 1PLA + 1PLB
2.48+ 1.1TLA
-0.81
+ 1.1TLB
-0.154
- 1.1BTA - 1.1BTB
3.571 7.276
Min Fy 13348 1005 1DL11410
+ 1SIDL 1120.585
+ 1CL + 1PLA +-6.687
1PLB + 1.1TLA
-0.428
+ 1.1TLB 0.13
+ 1.1BTA + 1.1BTB
2.98 -17.653
Max Fz 13348 1001 1DL11410
+ 1SIDL +1043.23
1CL + 1PLA +-4.307
1.1TLA + 1.1BTA
0.363 0.219 0.714 -11.197
Min Fz 13348 1004 1DL11410
+ 1SIDL 1035.089
+ 1CL + 1PLB + 0.259
1.1TLB - 1.1BTB
-1.495 -0.084 5.415 1.235
Max Mx 13348 1001 1DL11410
+ 1SIDL +1043.23
1CL + 1PLA +-4.307
1.1TLA + 1.1BTA
0.363 0.219 0.714 -11.197
Min Mx 13348 1006 1DL11410
+ 1SIDL +965.822
1CL + 1PLA + 1PLB
2.48+ 1.1TLA
-0.81
+ 1.1TLB
-0.154
- 1.1BTA - 1.1BTB
3.571 7.276
Max My 13348 1004 1DL11410
+ 1SIDL 1035.089
+ 1CL + 1PLB + 0.259
1.1TLB - 1.1BTB
-1.495 -0.084 5.415 1.235
Min My 28485 1004 1DL27470
+ 1SIDL 1035.089
+ 1CL + 1PLB + 0.049
1.1TLB - 1.1BTB
-0.108 -0.084 -0.699 -0.07
Max Mz 13348 1006 1DL11410
+ 1SIDL +965.822
1CL + 1PLA + 1PLB
2.48+ 1.1TLA
-0.81
+ 1.1TLB
-0.154
- 1.1BTA - 1.1BTB
3.571 7.276
Min Mz 13348 1005 1DL11410
+ 1SIDL 1120.585
+ 1CL + 1PLA +-6.687
1PLB + 1.1TLA
-0.428
+ 1.1TLB 0.13
+ 1.1BTA + 1.1BTB
2.98 -17.653
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
ODE MDE
Maximum Tension Force (kN) -1269.37 -1693.12
Skin Friction (kN) 2684.00
Final Axial Load (kN) 0.00 0.00
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 351.6 573 0.614 OK
Minima 3889 172.9 1551 0.112 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Naushad
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.758 m
Hence de = 0.741 m and dv = 0.667 m
Horizontal resultant shear force at the section, Vu = 517 kN
Corresponding axial compressive force, N = 2030 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 14476 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0072 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 1.085 %
Horizontal shear force, Vu = 517 kN
Shear stress (vv = Vu /(bv . dv) = 774.83 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.759 Mpa
= 759 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 706.257 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.13
Modified shear strength of concrete (n s vc ) = 797.52 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = -15.14 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 266.86 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nishant
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13467 1005 1DL11529
+ 1SIDL 2131.909
+ 1CL + 1PLA + 9.537
1PLB + 1.1TLA
25.377
+ 1.1TLB
-0.239
+ 1.1BTA-55.786
+ 1.1BTB -76.172
Min Fx 13467 1006 1DL11529
+ 1SIDL 1639.756
+ 1CL + 1PLA + 1PLB
0.76+ 1.1TLA
16.054
+ 1.1TLB
-1.262
- 1.1BTA -40.063
- 1.1BTB 26.78
Max Fy 13496 1005 1DL11528
+ 1SIDL 2131.909
+ 1CL + 1PLA +30.161
1PLB + 1.1TLA
41.361
+ 1.1TLB
-0.239
+ 1.1BTA-163.281
+ 1.1BTB -8.571
Min Fy 13496 1006 1DL11528
+ 1SIDL 1639.756
+ 1CL + 1PLA +-2.539
1PLB + 1.1TLA
25.448
+ 1.1TLB
-1.262
- 1.1BTA-106.729
- 1.1BTB 22.968
Max Fz 13496 1005 1DL11528
+ 1SIDL 2131.909
+ 1CL + 1PLA +30.161
1PLB + 1.1TLA
41.361
+ 1.1TLB
-0.239
+ 1.1BTA-163.281
+ 1.1BTB -8.571
Min Fz 13470 1006 1DL11532
+ 1SIDL 1639.756
+ 1CL + 1PLA + 2.178
1PLB + 1.1TLA
9.049
+ 1.1TLB
-1.262
- 1.1BTA - 1.1BTB
0.463 22.761
Max Mx 13467 1001 1DL11529
+ 1SIDL 1956.236
+ 1CL + 1PLA + 7.123
1.1TLA + 21.481
1.1BTA -0.18 -58.517 -49.712
Min Mx 13467 1006 1DL11529
+ 1SIDL 1639.756
+ 1CL + 1PLA + 1PLB
0.76+ 1.1TLA
16.054
+ 1.1TLB
-1.262
- 1.1BTA -40.063
- 1.1BTB 26.78
Max My 13470 1003 1DL11533
+ 1SIDL 2013.498
+ 1CL + 1PLB +-0.665
1.1TLB + 12.128
1.1BTB -0.611 28.437 -62.207
Min My 13496 1005 1DL11528
+ 1SIDL 2131.909
+ 1CL + 1PLA +30.161
1PLB + 1.1TLA
41.361
+ 1.1TLB
-0.239
+ 1.1BTA-163.281
+ 1.1BTB -8.571
Max Mz 13467 1006 1DL11529
+ 1SIDL 1639.756
+ 1CL + 1PLA + 1PLB
0.76+ 1.1TLA
16.054
+ 1.1TLB
-1.262
- 1.1BTA -40.063
- 1.1BTB 26.78
Min Mz 13469 1005 1DL11532
+ 1SIDL 2131.909
+ 1CL + 1PLA + 1.203
1PLB + 1.1TLA
17.088
+ 1.1TLB
-0.239
+ 1.1BTA +7.638
1.1BTB -91.807
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -1923 1091 1556 0.701 OK
Minima 1844 686.3 2407 0.285 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 13481 1005 1DL11543
+ 1SIDL 2131.909
+ 1CL + 1PLA +-5.678
1PLB + 1.1TLA
-5.61
+ 1.1TLB
-0.239
+ 1.1BTA +22.468
1.1BTB -13.018
Min Fx 13481 1006 1DL11543
+ 1SIDL 1639.756
+ 1CL + 1PLA + 0.755
1PLB + 1.1TLA
-3.374
+ 1.1TLB
-1.262
- 1.1BTA -13.989
1.1BTB 0.509
Max Fy 28524 1005 1DL27508
+ 1SIDL 2131.909
+ 1CL + 1PLA + 0.944
1PLB + 1.1TLA
0.465
+ 1.1TLB
-0.239
+ 1.1BTA +-1.884
1.1BTB 2.839
Min Fy 13481 1005 1DL11543
+ 1SIDL 2131.909
+ 1CL + 1PLA +-5.678
1PLB + 1.1TLA
-5.61
+ 1.1TLB
-0.239
+ 1.1BTA +22.468
1.1BTB -13.018
Max Fz 28525 1003 1DL27509
+ 1SIDL 2013.498
+ 1CL + 1PLB + 0.605
1.1TLB + 1.1BTB
0.599 -0.611 -1.463 1.34
Min Fz 13481 1005 1DL11543
+ 1SIDL 2131.909
+ 1CL + 1PLA +-5.678
1PLB + 1.1TLA
-5.61
+ 1.1TLB
-0.239
+ 1.1BTA +22.468
1.1BTB -13.018
Max Mx 13481 1001 1DL11543
+ 1SIDL 1956.236
+ 1CL + 1PLA +-3.977
1.1TLA + -4.334
1.1BTA -0.18 18.487 -9.385
Min Mx 13481 1006 1DL11543
+ 1SIDL 1639.756
+ 1CL + 1PLA + 0.755
1PLB + 1.1TLA
-3.374
+ 1.1TLB
-1.262
- 1.1BTA -13.989
1.1BTB 0.509
Max My 13481 1005 1DL11543
+ 1SIDL 2131.909
+ 1CL + 1PLA +-5.678
1PLB + 1.1TLA
-5.61
+ 1.1TLB
-0.239
+ 1.1BTA +22.468
1.1BTB -13.018
Min My 28522 1003 1DL27507
+ 1SIDL 2013.498
+ 1CL + 1PLB + 0.409
1.1TLB + 1.1BTB
-0.24 -0.611 -2.221 2.606
Max Mz 28520 1005 1DL27505
+ 1SIDL 2131.909
+ 1CL + 1PLA +-0.818
1PLB + 1.1TLA
-2.179
+ 1.1TLB
-0.239
+ 1.1BTA +-0.605
1.1BTB 4.414
Min Mz 13481 1005 1DL11543
+ 1SIDL 2131.909
+ 1CL + 1PLA +-5.678
1PLB + 1.1TLA
-5.61
+ 1.1TLB
-0.239
+ 1.1BTA +22.468
1.1BTB -13.018
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nishant
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
ODE MDE
Maximum Tension Force (kN) -717.71 -2270.29
Skin Friction (kN) 1770.00
Final Axial Load (kN) 0.00 -500.29
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nishant
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 251.9 513.4 0.491 OK
Minima 2949 66.92 1326 0.050 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nishant
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.756 m
Hence de = 0.741 m and dv = 0.667 m
Horizontal resultant shear force at the section, Vu = 508 kN
Corresponding axial compressive force, N = 4803 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 16286 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0081 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 1.222 %
Horizontal shear force, Vu = 508 kN
Shear stress (vv = Vu /(bv . dv) = 762.49 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.790 Mpa
= 790 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.931
Allowable shear stress in concrete, s vc = 734.905 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.31
Modified shear strength of concrete (n s vc ) = 959.60 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = -131.39 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 266.63 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nishant
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26932 1005 1DL25880
+ 1SIDL + 1CL
692.01
+ 1PLA +71.883
1PLB + 1.1TLA
6.247
+ 1.1TLB
28.113
+ 1.1BTA +6.357
1.1BTB 25.764
Min Fx 26982 1006 1DL25939
+ 1SIDL +570.584
1CL + 1PLA +24.201
1PLB + 1.1TLA
1.312
+ 1.1TLB3.878
- 1.1BTA - -2.235
1.1BTB 91.179
Max Fy 26949 1005 1DL25879
+ 1SIDL + 1CL
692.01
+ 1PLA137.062
+ 1PLB + 1.1TLA
13.205
+ 1.1TLB
28.113
+ 1.1BTA-25.732
+ 1.1BTB 367.293
Min Fy 27024 1006 1DL25967
+ 1SIDL +627.597
1CL + 1PLA -74.728
+ 1PLB + 1.1TLA
3.469
+ 1.1TLB
-4.571
- 1.1BTA - -3.906
1.1BTB -217.647
Max Fz 26949 1006 1DL25879
+ 1SIDL +649.492
1CL + 1PLA +73.886
1PLB + 1.1TLA
13.612
+ 1.1TLB
27.309
- 1.1BTA - -23.38
1.1BTB 391.714
Min Fz 26922 1001 1DL25849
+ 1SIDL +611.352
1CL + 1PLA +-6.181
1.1TLA + -73.917
1.1BTA -3.334 32.994 -20.625
Max Mx 26932 1001 1DL25880
+ 1SIDL +682.795
1CL + 1PLA +67.577
1.1TLA + 1.1BTA
6.265 28.878 3.964 65.896
Min Mx 27007 1006 1DL25968
+ 1SIDL +627.597
1CL + 1PLA -40.414
+ 1PLB + 1.1TLA
1.441
+ 1.1TLB
-4.571
- 1.1BTA - 1.1BTB
4.283 -29.97
Max My 26922 1004 1DL25849
+ 1SIDL +594.823
1CL + 1PLB -10.807
+ 1.1TLB - -59.515
1.1BTB -2.295 47.023 -5.626
Min My 26908 1002 1DL25854
+ 1SIDL +610.095
1CL + 1PLA +-0.218
1.1TLA - 1.1BTA
-0.754 -2.698 -189.89 30.646
Max Mz 26949 1006 1DL25879
+ 1SIDL +649.492
1CL + 1PLA +73.886
1PLB + 1.1TLA
13.612
+ 1.1TLB
27.309
- 1.1BTA - -23.38
1.1BTB 391.714
Min Mz 27024 1005 1DL25967
+ 1SIDL + 1CL
589.93
+ 1PLA -15.587
+ 1PLB + 1.1TLA 2.6
+ 1.1TLB
-4.101
+ 1.1BTA +-5.602
1.1BTB -263.667
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 373.9 1908 2335 0.817 OK
Minima 926.6 607.4 2424 0.251 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.093 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 26946 1005 1DL25894
+ 1SIDL + 1CL
692.01
+ 1PLA -20.751
+ 1PLB + 1.1TLA
-2.119
+ 1.1TLB
28.113
+ 1.1BTA +6.477
1.1BTB -69.872
Min Fx 26996 1006 1DL25953
+ 1SIDL +570.584
1CL + 1PLA +-3.955
1PLB + 1.1TLA
-0.314
+ 1.1TLB3.878
- 1.1BTA - 1.1BTB
1.192 -19.638
Max Fy 27021 1006 1DL25982
+ 1SIDL +627.597
1CL + 1PLA +11.098
1PLB + 1.1TLA
-0.592
+ 1.1TLB
-4.571
- 1.1BTA - 1.1BTB
1.626 38.554
Min Fy 26946 1005 1DL25894
+ 1SIDL + 1CL
692.01
+ 1PLA -20.751
+ 1PLB + 1.1TLA
-2.119
+ 1.1TLB
28.113
+ 1.1BTA +6.477
1.1BTB -69.872
Max Fz 26919 1001 1DL25864
+ 1SIDL +611.352
1CL + 1PLA + 0.885
1.1TLA + 13.243
1.1BTA -3.334 -33.329 3.258
Min Fz 26946 1006 1DL25894
+ 1SIDL +649.492
1CL + 1PLA +-8.778
1PLB + 1.1TLA
-2.224
+ 1.1TLB
27.309
- 1.1BTA - 1.1BTB
6.594 -42.774
Max Mx 26946 1001 1DL25894
+ 1SIDL +682.795
1CL + 1PLA -17.977
+ 1.1TLA + -2.037
1.1BTA 28.878 6.382 -63.725
Min Mx 27021 1006 1DL25982
+ 1SIDL +627.597
1CL + 1PLA +11.098
1PLB + 1.1TLA
-0.592
+ 1.1TLB
-4.571
- 1.1BTA - 1.1BTB
1.626 38.554
Max My 28980 1002 1DL27965
+ 1SIDL +610.095
1CL + 1PLA + 0.036
1.1TLA - 1.1BTA
0.175 -2.698 9.34 -1.512
Min My 26919 1001 1DL25864
+ 1SIDL +611.352
1CL + 1PLA + 0.885
1.1TLA + 13.243
1.1BTA -3.334 -33.329 3.258
Max Mz 27021 1006 1DL25982
+ 1SIDL +627.597
1CL + 1PLA +11.098
1PLB + 1.1TLA
-0.592
+ 1.1TLB
-4.571
- 1.1BTA - 1.1BTB
1.626 38.554
Min Mz 26946 1005 1DL25894
+ 1SIDL + 1CL
692.01
+ 1PLA -20.751
+ 1PLB + 1.1TLA
-2.119
+ 1.1TLB
28.113
+ 1.1BTA +6.477
1.1BTB -69.872
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nishant
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
ODE MDE
Maximum Tension Force (kN) 296.56 316.461
Skin Friction (kN) 1770.00
Final Axial Load (kN) 0.00 0.00
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nishant
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 207.3 511.9 0.405 OK
Minima 938 107 816.4 0.131 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nishant
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.754 m
Hence de = 0.740 m and dv = 0.666 m
Horizontal resultant shear force at the section, Vu = 662 kN
Corresponding axial compressive force, N = 1149 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 20106 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0101 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 1.509 %
Horizontal shear force, Vu = 662 kN
Shear stress (vv = Vu /(bv . dv) = 993.85 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.847 Mpa
= 847 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.931
Allowable shear stress in concrete, s vc = 788.777 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.07
Modified shear strength of concrete (n s vc ) = 846.49 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 98.14 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 266.40 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 220 mm
OK
Shear reinforcement 13mm dia @ 220mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 27261 1005 1DL26205
+ 1SIDL 2760.485
+ 1CL + 1PLA +22.749
1PLB + 1.1TLA-1.01
+ 1.1TLB
-6.797
+ 1.1BTA +0.846
1.1BTB -63.718
Min Fx 27282 1005 1DL26226
+ 1SIDL 1351.739
+ 1CL + 1PLA +24.904
1PLB + 1.1TLA
4.193
+ 1.1TLB
-4.895
+ 1.1BTA-21.368
+ 1.1BTB -60.814
Max Fy 27299 1005 1DL26225
+ 1SIDL 1351.739
+ 1CL + 1PLA +48.929
1PLB + 1.1TLA
5.179
+ 1.1TLB
-4.895
+ 1.1BTA-35.978
+ 1.1BTB 60.116
Min Fy 27299 1006 1DL26225
+ 1SIDL 1998.458
+ 1CL + 1PLA -58.595
+ 1PLB + 1.1TLA
36.937
+ 1.1TLB6.804
- 1.1BTA-230.838
- 1.1BTB -287.877
Max Fz 27299 1004 1DL26225
+ 1SIDL 1880.876
+ 1CL + 1PLB -35.057
+ 1.1TLB - 1.1BTB
41.374 4.998 -231.596 -219.882
Min Fz 27278 1001 1DL26204
+ 1SIDL 2569.151
+ 1CL + 1PLA + 23.73
1.1TLA + -10.072
1.1BTA -4.008 29.937 -6.736
Max Mx 27282 1006 1DL26226
+ 1SIDL 1998.458
+ 1CL + 1PLA -41.177
+ 1PLB + 1.1TLA
28.553
+ 1.1TLB6.804
- 1.1BTA-128.213
- 1.1BTB -129.865
Min Mx 27261 1005 1DL26205
+ 1SIDL 2760.485
+ 1CL + 1PLA +22.749
1PLB + 1.1TLA-1.01
+ 1.1TLB
-6.797
+ 1.1BTA +0.846
1.1BTB -63.718
Max My 27291 1004 1DL26236
+ 1SIDL 1880.876
+ 1CL + 1PLB +-3.274
1.1TLB - 1.1BTB
2.052 4.998 53.602 39.882
Min My 27299 1004 1DL26225
+ 1SIDL 1880.876
+ 1CL + 1PLB -35.057
+ 1.1TLB - 1.1BTB
41.374 4.998 -231.596 -219.882
Max Mz 27291 1006 1DL26236
+ 1SIDL 1998.458
+ 1CL + 1PLA +-0.302
1PLB + 1.1TLA
3.395
+ 1.1TLB6.804
- 1.1BTA -42.215
1.1BTB 85.306
Min Mz 27299 1006 1DL26225
+ 1SIDL 1998.458
+ 1CL + 1PLA -58.595
+ 1PLB + 1.1TLA
36.937
+ 1.1TLB6.804
- 1.1BTA-230.838
- 1.1BTB -287.877
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -1309 4667 5512 0.847 OK
Minima 7593 867.4 6633 0.131 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.001 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28430 1005 1DL26222
+ 1SIDL 2760.485
+ 1CL + 1PLA +-8.037
1PLB + 1.1TLA
0.262
+ 1.1TLB
-6.797
+ 1.1BTA +-0.913
1.1BTB -22.61
Min Fx 28431 1005 1DL26243
+ 1SIDL 1351.739
+ 1CL + 1PLA +-8.568
1PLB + 1.1TLA
-0.627
+ 1.1TLB
-4.895
+ 1.1BTA +3.343
1.1BTB -24.529
Max Fy 28431 1006 1DL26243
+ 1SIDL 1998.458
+ 1CL + 1PLA + 8.218
1PLB + 1.1TLA
-4.713
+ 1.1TLB6.804
- 1.1BTA -23.191
1.1BTB 34.815
Min Fy 28431 1005 1DL26243
+ 1SIDL 1351.739
+ 1CL + 1PLA +-8.568
1PLB + 1.1TLA
-0.627
+ 1.1TLB
-4.895
+ 1.1BTA +3.343
1.1BTB -24.529
Max Fz 28430 1001 1DL26222
+ 1SIDL 2569.151
+ 1CL + 1PLA +-4.495
1.1TLA + 1.1BTA
1.598 -4.008 -5.492 -10.992
Min Fz 28431 1004 1DL26243
+ 1SIDL 1880.876
+ 1CL + 1PLB + 4.466
1.1TLB - 1.1BTB
-5.534 4.998 25.297 22.031
Max Mx 28431 1006 1DL26243
+ 1SIDL 1998.458
+ 1CL + 1PLA + 8.218
1PLB + 1.1TLA
-4.713
+ 1.1TLB6.804
- 1.1BTA -23.191
1.1BTB 34.815
Min Mx 28430 1005 1DL26222
+ 1SIDL 2760.485
+ 1CL + 1PLA +-8.037
1PLB + 1.1TLA
0.262
+ 1.1TLB
-6.797
+ 1.1BTA +-0.913
1.1BTB -22.61
Max My 28431 1004 1DL26243
+ 1SIDL 1880.876
+ 1CL + 1PLB + 4.466
1.1TLB - 1.1BTB
-5.534 4.998 25.297 22.031
Min My 28430 1001 1DL26222
+ 1SIDL 2569.151
+ 1CL + 1PLA +-4.495
1.1TLA + 1.1BTA
1.598 -4.008 -5.492 -10.992
Max Mz 28431 1006 1DL26243
+ 1SIDL 1998.458
+ 1CL + 1PLA + 8.218
1PLB + 1.1TLA
-4.713
+ 1.1TLB6.804
- 1.1BTA -23.191
1.1BTB 34.815
Min Mz 28431 1005 1DL26243
+ 1SIDL 1351.739
+ 1CL + 1PLA +-8.568
1PLB + 1.1TLA
-0.627
+ 1.1TLB
-4.895
+ 1.1BTA +3.343
1.1BTB -24.529
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
ODE MDE
Maximum Tension Force (kN) -1962.77 -3569.7
Skin Friction (kN) 2904.67
Final Axial Load (kN) 0.00 -665.03
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -665 406.1 574.5 0.707 OK
Minima 7593 588.9 2901 0.203 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.954 m
Hence de = 0.904 m and dv = 0.813 m
Horizontal resultant shear force at the section, Vu = 1101 kN
Corresponding axial compressive force, N = 6479 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 40212 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0201 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 2.060 %
Horizontal shear force, Vu = 1101 kN
Shear stress (vv = Vu /(bv . dv) = 1128.02 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.940 Mpa
= 940 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 832.311 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.29
Modified shear strength of concrete (n s vc ) = 1070.73 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 55.91 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 390.38 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 27270 1005 1DL26214
+ 1SIDL 2760.485
+ 1CL + 1PLA -11.142
+ 1PLB + 1.1TLA
0.188
+ 1.1TLB
-6.797
+ 1.1BTA +-3.321
1.1BTB -118.399
Min Fx 27291 1005 1DL26235
+ 1SIDL 1351.739
+ 1CL + 1PLA -11.451
+ 1PLB + 1.1TLA0.71
+ 1.1TLB
-4.895
+ 1.1BTA +4.363
1.1BTB -124.901
Max Fy 27297 1006 1DL26241
+ 1SIDL 1998.458
+ 1CL + 1PLA + 9.031
1PLB + 1.1TLA
-4.618
+ 1.1TLB6.804
- 1.1BTA -32.596
1.1BTB 52.61
Min Fy 27294 1005 1DL26238
+ 1SIDL 1351.739
+ 1CL + 1PLA -14.023
+ 1PLB + 1.1TLA
-0.158
+ 1.1TLB
-4.895
+ 1.1BTA +5.466
1.1BTB -86.492
Max Fz 27291 1006 1DL26235
+ 1SIDL 1998.458
+ 1CL + 1PLA +-0.302
1PLB + 1.1TLA
3.395
+ 1.1TLB6.804
- 1.1BTA - 1.1BTB
38.82 85.004
Min Fz 27298 1004 1DL26242
+ 1SIDL 1880.876
+ 1CL + 1PLB + 4.531
1.1TLB - 1.1BTB
-5.765 4.998 31.062 26.562
Max Mx 27291 1006 1DL26235
+ 1SIDL 1998.458
+ 1CL + 1PLA +-0.302
1PLB + 1.1TLA
3.395
+ 1.1TLB6.804
- 1.1BTA - 1.1BTB
38.82 85.004
Min Mx 27270 1005 1DL26214
+ 1SIDL 2760.485
+ 1CL + 1PLA -11.142
+ 1PLB + 1.1TLA
0.188
+ 1.1TLB
-6.797
+ 1.1BTA +-3.321
1.1BTB -118.399
Max My 27291 1004 1DL26236
+ 1SIDL 1880.876
+ 1CL + 1PLB +-3.274
1.1TLB - 1.1BTB
2.052 4.998 53.602 39.882
Min My 27270 1001 1DL26214
+ 1SIDL 2569.151
+ 1CL + 1PLA +-7.884
1.1TLA + 1.1BTA
1.217 -4.008 -20.459 -71.311
Max Mz 27291 1006 1DL26236
+ 1SIDL 1998.458
+ 1CL + 1PLA +-0.302
1PLB + 1.1TLA
3.395
+ 1.1TLB6.804
- 1.1BTA -42.215
1.1BTB 85.306
Min Mz 27291 1005 1DL26235
+ 1SIDL 1351.739
+ 1CL + 1PLA -11.451
+ 1PLB + 1.1TLA0.71
+ 1.1TLB
-4.895
+ 1.1BTA +4.363
1.1BTB -124.901
ODE MDE
Maximum Tension Force (kN) -1962.77 -3569.7
Skin Friction (kN) 1110.67
Final Axial Load (kN) -852.10 -2459.03
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -2459 1880 2380 0.790 OK
Minima 6554 1161 4457 0.260 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31670 1005 1DL30730
+ 1SIDL 2506.631
+ 1CL + 1PLA +15.391
1PLB + 1.1TLA
-1.561
+ 1.1TLB
-29.468
+ 1.1BTA-52.813
+ 1.1BTB -75.2
Min Fx 31639 1003 1DL30699
+ 1SIDL 1633.393
+ 1CL + 1PLB +-4.297
1.1TLB + 1.1BTB
4.028 -21.018 -32.459 -92.894
Max Fy 31687 1005 1DL30729
+ 1SIDL 2506.631
+ 1CL + 1PLA +33.881
1PLB + 1.1TLA
-7.81
+ 1.1TLB
-29.468
+ 1.1BTA-36.316
+ 1.1BTB 6.384
Min Fy 31687 1006 1DL30729
+ 1SIDL 1932.586
+ 1CL + 1PLA -76.807
+ 1PLB + 1.1TLA
-33.995
+ 1.1TLB
-1.708
- 1.1BTA160.477
- 1.1BTB -350.594
Max Fz 31639 1005 1DL30699
+ 1SIDL 1642.353
+ 1CL + 1PLA + 3.111
1PLB + 1.1TLA
8.055
+ 1.1TLB
-25.833
+ 1.1BTA-69.573
+ 1.1BTB -113.034
Min Fz 31656 1006 1DL30698
+ 1SIDL 2240.985
+ 1CL + 1PLA -75.951
+ 1PLB + 1.1TLA
-38.025
+ 1.1TLB6.228
- 1.1BTA194.549
- 1.1BTB -341.23
Max Mx 31639 1006 1DL30699
+ 1SIDL 2240.985
+ 1CL + 1PLA -51.695
+ 1PLB + 1.1TLA
-27.128
+ 1.1TLB6.228
- 1.1BTA -91.533
1.1BTB -138.362
Min Mx 31670 1005 1DL30730
+ 1SIDL 2506.631
+ 1CL + 1PLA +15.391
1PLB + 1.1TLA
-1.561
+ 1.1TLB
-29.468
+ 1.1BTA-52.813
+ 1.1BTB -75.2
Max My 31656 1006 1DL30698
+ 1SIDL 2240.985
+ 1CL + 1PLA -75.951
+ 1PLB + 1.1TLA
-38.025
+ 1.1TLB6.228
- 1.1BTA194.549
- 1.1BTB -341.23
Min My 31656 1005 1DL30698
+ 1SIDL 1642.353
+ 1CL + 1PLA + 16.32
1PLB + 1.1TLA
7.186
+ 1.1TLB
-25.833
+ 1.1BTA-92.445
+ 1.1BTB -78.736
Max Mz 31647 1006 1DL30708
+ 1SIDL 2240.985
+ 1CL + 1PLA +-4.058
1PLB + 1.1TLA
-3.714
+ 1.1TLB6.228
- 1.1BTA -52.852
- 1.1BTB 119.731
Min Mz 31687 1006 1DL30729
+ 1SIDL 1932.586
+ 1CL + 1PLA -76.807
+ 1PLB + 1.1TLA
-33.995
+ 1.1TLB
-1.708
- 1.1BTA160.477
- 1.1BTB -350.594
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
As,bpmin varies according to pile cross-sectional area, Ac .
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -1436 2926 3567 0.820 OK
Minima 7203 803.3 5127 0.157 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.003 mm OK
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31690 1005 1DL30747
+ 1SIDL 2506.631
+ 1CL + 1PLA +-6.266
1PLB + 1.1TLA
1.802
+ 1.1TLB
-29.468
+ 1.1BTA +-2.758
1.1BTB -16.097
Min Fx 31659 1003 1DL30716
+ 1SIDL 1633.393
+ 1CL + 1PLB +-1.191
1.1TLB + -0.294
1.1BTB -21.018 2.913 1.656
Max Fy 31690 1006 1DL30747
+ 1SIDL 1932.586
+ 1CL + 1PLA +11.025
1PLB + 1.1TLA4.83
+ 1.1TLB
-1.708
- 1.1BTA -20.034
- 1.1BTB 44.962
Min Fy 31690 1005 1DL30747
+ 1SIDL 2506.631
+ 1CL + 1PLA +-6.266
1PLB + 1.1TLA
1.802
+ 1.1TLB
-29.468
+ 1.1BTA +-2.758
1.1BTB -16.097
Max Fz 31659 1006 1DL30716
+ 1SIDL 2240.985
+ 1CL + 1PLA +10.954
1PLB + 1.1TLA5.26
+ 1.1TLB6.228
- 1.1BTA -22.788
- 1.1BTB 44.324
Min Fz 31662 1005 1DL30721
+ 1SIDL 1642.353
+ 1CL + 1PLA +-0.924
1PLB + 1.1TLA
-0.795
+ 1.1TLB
-25.833
+ 1.1BTA +3.909
1.1BTB 3.26
Max Mx 31659 1006 1DL30716
+ 1SIDL 2240.985
+ 1CL + 1PLA +10.954
1PLB + 1.1TLA5.26
+ 1.1TLB6.228
- 1.1BTA -22.788
- 1.1BTB 44.324
Min Mx 31690 1005 1DL30747
+ 1SIDL 2506.631
+ 1CL + 1PLA +-6.266
1PLB + 1.1TLA
1.802
+ 1.1TLB
-29.468
+ 1.1BTA +-2.758
1.1BTB -16.097
Max My 31659 1005 1DL30716
+ 1SIDL 1642.353
+ 1CL + 1PLA +-3.793
1PLB + 1.1TLA
-0.467
+ 1.1TLB
-25.833
+ 1.1BTA + 1.1BTB
5.71 -5.692
Min My 31659 1006 1DL30716
+ 1SIDL 2240.985
+ 1CL + 1PLA +10.954
1PLB + 1.1TLA5.26
+ 1.1TLB6.228
- 1.1BTA -22.788
- 1.1BTB 44.324
Max Mz 31690 1006 1DL30747
+ 1SIDL 1932.586
+ 1CL + 1PLA +11.025
1PLB + 1.1TLA4.83
+ 1.1TLB
-1.708
- 1.1BTA -20.034
- 1.1BTB 44.962
Min Mz 31690 1005 1DL30747
+ 1SIDL 2506.631
+ 1CL + 1PLA +-6.266
1PLB + 1.1TLA
1.802
+ 1.1TLB
-29.468
+ 1.1BTA +-2.758
1.1BTB -16.097
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
ODE MDE
Maximum Tension Force (kN) -2276.59 -3052.58
Skin Friction (kN) 2904.67
Final Axial Load (kN) 0.00 -147.92
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 0 408.8 885.4 0.462 OK
Minima 7203 283.9 2862 0.099 OK
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.958 m
Hence de = 0.905 m and dv = 0.814 m
Horizontal resultant shear force at the section, Vu = 982 kN
Corresponding axial compressive force, N = 0 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 25736 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0129 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 1.317 %
Horizontal shear force, Vu = 982 kN
Shear stress (vv = Vu /(bv . dv) = 1005.20 kN/m2
Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.810 Mpa
= 810 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 716.675 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.00
Modified shear strength of concrete (n s vc ) = 716.68 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 281.98 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 390.93 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31679 1005 1DL30739
+ 1SIDL 2506.631
+ 1CL + 1PLA -10.217
+ 1PLB + 1.1TLA
4.808
+ 1.1TLB
-29.468
+ 1.1BTA-33.669
+ 1.1BTB -97.028
Min Fx 31648 1003 1DL30708
+ 1SIDL 1633.393
+ 1CL + 1PLB +-6.655
1.1TLB + 1.1BTB
1.679 -21.018 -2.105 -32.97
Max Fy 31653 1006 1DL30713
+ 1SIDL 2240.985
+ 1CL + 1PLA +12.434
1PLB + 1.1TLA
5.524
+ 1.1TLB6.228
- 1.1BTA -39.576
- 1.1BTB 80.995
Min Fy 31681 1005 1DL30741
+ 1SIDL 2506.631
+ 1CL + 1PLA -11.416
+ 1PLB + 1.1TLA
4.573
+ 1.1TLB
-29.468
+ 1.1BTA-24.098
+ 1.1BTB -75.698
Max Fz 31684 1002 1DL30744
+ 1SIDL 2061.989
+ 1CL + 1PLA + 7.327
1.1TLA - 1.1BTA
5.957 -6.766 -34.99 54.908
Min Fz 31662 1005 1DL30721
+ 1SIDL 1642.353
+ 1CL + 1PLA +-0.924
1PLB + 1.1TLA
-0.795
+ 1.1TLB
-25.833
+ 1.1BTA +3.909
1.1BTB 3.26
Max Mx 31648 1006 1DL30708
+ 1SIDL 2240.985
+ 1CL + 1PLA + 1.681
1PLB + 1.1TLA
-0.698
+ 1.1TLB6.228
- 1.1BTA -52.852
- 1.1BTB 119.731
Min Mx 31679 1005 1DL30739
+ 1SIDL 2506.631
+ 1CL + 1PLA -10.217
+ 1PLB + 1.1TLA
4.808
+ 1.1TLB
-29.468
+ 1.1BTA-33.669
+ 1.1BTB -97.028
Max My 31654 1005 1DL30715
+ 1SIDL 1642.353
+ 1CL + 1PLA +-5.975
1PLB + 1.1TLA
0.136
+ 1.1TLB
-25.833
+ 1.1BTA +5.931
1.1BTB -10.507
Min My 31679 1002 1DL30739
+ 1SIDL 2061.989
+ 1CL + 1PLA +-1.895
1.1TLA - 1.1BTA
2.338 -6.766 -57.721 69.877
Max Mz 31648 1006 1DL30708
+ 1SIDL 2240.985
+ 1CL + 1PLA + 1.681
1PLB + 1.1TLA
-0.698
+ 1.1TLB6.228
- 1.1BTA -52.852
- 1.1BTB 119.731
Min Mz 31679 1005 1DL30739
+ 1SIDL 2506.631
+ 1CL + 1PLA -10.217
+ 1PLB + 1.1TLA
4.808
+ 1.1TLB
-29.468
+ 1.1BTA-33.669
+ 1.1BTB -97.028
ODE MDE
Maximum Tension Force (kN) -2276.59 -3052.58
Skin Friction (kN) 1110.67
Final Axial Load (kN) -1165.93 -1941.92
Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.
Reinforcement Provided
N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -634.5 1763 1969 0.895 OK
Minima 7080 896.1 3743 0.239 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nikhil
Doc. No. - Checked Reyaz
Title Design of Piles Verified Sumant
From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 LEBAK BULUS STATION FOUNDATION DESIGN
Design of Pile
No. of piles n = 1
Dia of pile = 1.00 m
Size of Column = 1.00 m x 1.00 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm
No. of piles n = 1
Dia of pile = 1.00 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm
No. of piles n = 4
Dia of pile = 1.20 m
Size of Column = 2.00 m x 2.00 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28079 2195 1.15DL
27059
+ 1.2SIDL
9924.301
+ 0.42CL 301.693
+ 0.42PLA +963.665
0.42PLB + 0.462TLA
12.384 + 0.462TLB
4140.027 + 0.462BTA
1302.533+ 0.462BTB + 0.3SLX + 0.3S
Min Fx 28079 2115 1.15DL
27063
+ 1.2SIDL
-2006.5
+ 0.3SLX-186.995
+ 0.3SLY +-1001.285
1SLZ -13.940 -2907.205 -541.465
Max Fy 28079 2103 1.15DL
27059
+ 1.2SIDL
8878.575
+ 1.4CL 1178.226
+ 1.4PLB + 1.54TLB
310.191+ 1.54BTB
35.685 1433.27 4809.514
Min Fy 28079 2104 1.15DL
27063
+ 1.2SIDL
-443.958
+ 1.4CL-1067.539
+ 1.4PLB + -340.728
1.54TLB - 1.54BTB
-36.269 -879.389 -3170.124
Max Fz 28079 3154 1.15DL
27063
+ 1.2SIDL
9484.138
+ 0.42CL 268.409
+ 0.42PLA +975.902
0.462TLA - 11.592
0.462BTA3087.597
- 0.3SLX - 0.3SLY
907.411
- 1SLZ - 1.54NLA
Min Fz 28079 3147 1.15DL
27063
+ 1.2SIDL
-1471.53
+ 0.42CL +-170.91
0.42PLA-1013.806
+ 0.462TLA +-13.249
0.462BTA
-2870.619
+ 0.3SLX + -489.615
0.3SLY + 1SLZ + 1.54NLA
Max Mx 28079 2104 1.15DL
27059
+ 1.2SIDL
8388.827
+ 1.4CL 1109.498
+ 1.4PLB + 1.54TLB
311.48- 1.54BTB
36.440 1424.257 4558.177
Min Mx 28079 2103 1.15DL
27063
+ 1.2SIDL45.79
+ 1.4CL +-998.811
1.4PLB + -342.017
1.54TLB + 1.54BTB
-37.025 -871.665 -2987.515
Max My 28079 3147 1.15DL
27059
+ 1.2SIDL
9756.336
+ 0.42CL 289.242
+ 0.42PLA +957.316
0.462TLA +13.183
0.462BTA
4153.269
+ 0.3SLX +1252.682
0.3SLY + 1SLZ + 1.54NLA
Min My 28079 3154 1.15DL
27059
+ 1.2SIDL
-1743.73
+ 0.42CL-191.743
+ 0.42PLA +-995.22
0.462TLA --14.840
0.462BTA
-3898.387
- 0.3SLX - 0.3SLY
-737.387
- 1SLZ - 1.54NLA
Max Mz 28079 2103 1.15DL
27059
+ 1.2SIDL
8878.575
+ 1.4CL 1178.226
+ 1.4PLB + 1.54TLB
310.191+ 1.54BTB
35.685 1433.27 4809.514
Min Mz 28079 2104 1.15DL
27063
+ 1.2SIDL
-443.958
+ 1.4CL-1067.539
+ 1.4PLB + -340.728
1.54TLB - 1.54BTB
-36.269 -879.389 -3170.124
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28080 2202 1.15DL
27064
+ 1.2SIDL
9728.217
+ 0.42CL 234.234
+ 0.42PLA + 0.42PLB
993.6 + 0.462TLA
11.654 + 0.462TLB
2927.23 - 0.462BTA
702.615- 0.462BTB - 0.3SLX - 0.3SLY
Min Fx 28080 2115 1.15DL
27064
+ 1.2SIDL
-2331.46
+ 0.3SLX-209.742
+ 0.3SLY + 1SLZ
-978.593 -13.048 -3067.49 -705.696
Max Fy 28080 2103 1.15DL
27060
+ 1.2SIDL
8425.392
+ 1.4CL 1153.026
+ 1.4PLB + 1.54TLB
335.777+ 1.54BTB
33.396 1205.976 4602.232
Min Fy 28080 2104 1.15DL
27064
+ 1.2SIDL
-642.971
+ 1.4CL-1095.722
+ 1.4PLB + -312.929
1.54TLB - 1.54BTB
-33.816 -1065.256 -3373.496
Max Fz 28080 3154 1.15DL
27064
+ 1.2SIDL
9478.685
+ 0.42CL 243.694
+ 0.42PLA +1000.67
0.462TLA - 10.815
0.462BTA2905.171
- 0.3SLX - 0.3SLY
728.932
- 1SLZ - 1.54NLA
Min Fz 28080 3147 1.15DL
27064
+ 1.2SIDL
-2186.1
+ 0.42CL-196.187
+ 0.42PLA +-988.583
0.462TLA +-12.350
0.462BTA
-3049.177
+ 0.3SLX + 0.3SLY
-672.12+ 1SLZ + 1.54NLA
Max Mx 28080 2104 1.15DL
27060
+ 1.2SIDL
8951.628
+ 1.4CL 1084.162
+ 1.4PLB + 1.54TLB
337.201- 1.54BTB
34.011 1195.848 4349.779
Min Mx 28080 2103 1.15DL
27064
+ 1.2SIDL
-1169.21
+ 1.4CL-1026.858
+ 1.4PLB + -314.354
1.54TLB + 1.54BTB
-34.430 -1056.552 -3189.907
Max My 28080 3147 1.15DL
27060
+ 1.2SIDL
9195.754
+ 0.42CL 264.567
+ 0.42PLA +982.045
0.462TLA +12.411
0.462BTA
3945.907
+ 0.3SLX +1049.821
0.3SLY + 1SLZ + 1.54NLA
Min My 28080 3154 1.15DL
27060
+ 1.2SIDL
-1903.17
+ 0.42CL +-217.06
0.42PLA +-969.957
0.462TLA --13.946
0.462BTA
-4102.001
- 0.3SLX - 0.3SLY
-945.501
- 1SLZ - 1.54NLA
Max Mz 28080 2103 1.15DL
27060
+ 1.2SIDL
8425.392
+ 1.4CL 1153.026
+ 1.4PLB + 1.54TLB
335.777+ 1.54BTB
33.396 1205.976 4602.232
Min Mz 28080 2104 1.15DL
27064
+ 1.2SIDL
-642.971
+ 1.4CL-1095.722
+ 1.4PLB + -312.929
1.54TLB - 1.54BTB
-33.816 -1065.256 -3373.496
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28081 2103 1.15DL
27061
+ 1.2SIDL
11182.5
+ 1.4CL 1181.323
+ 1.4PLB + 1.54TLB
348.099+ 1.54BTB
34.060 1286.288 4834.514
Min Fx 28081 2104 1.15DL
27065
+ 1.2SIDL
-2711.7
+ 1.4CL-1070.519
+ 1.4PLB + -324.484
1.54TLB - 1.54BTB
-34.472 -1141.115 -3191.159
Max Fy 28081 2103 1.15DL
27061
+ 1.2SIDL
11182.5
+ 1.4CL 1181.323
+ 1.4PLB + 1.54TLB
348.099+ 1.54BTB
34.060 1286.288 4834.514
Min Fy 28081 2104 1.15DL
27065
+ 1.2SIDL
-2711.7
+ 1.4CL-1070.519
+ 1.4PLB + -324.484
1.54TLB - 1.54BTB
-34.472 -1141.115 -3191.159
Max Fz 28081 3171 1.15DL
27061
+ 1.2SIDL
10102.92
+ 0.42CL 280.921
+ 0.42PLB 1002.953
+ 0.462TLB +11.4820.462BTB
3900.142
+ 0.3SLX + 1201.609
0.3SLY + 1SLZ + 1.54NLB
Min Fz 28081 3147 1.15DL
27065
+ 1.2SIDL
-2058.34
+ 0.42CL-163.188
+ 0.42PLA +-990.141
0.462TLA +-12.821
0.462BTA
-3067.732
+ 0.3SLX + -452.731
0.3SLY + 1SLZ + 1.54NLA
Max Mx 28081 2104 1.15DL
27061
+ 1.2SIDL
10690.27
+ 1.4CL 1112.583
+ 1.4PLB + 1.54TLB
347.853- 1.54BTB
34.673 1289.792 4583.088
Min Mx 28081 2103 1.15DL
27065
+ 1.2SIDL
-2219.47
+ 1.4CL +-1001.78
1.4PLB + -324.238
1.54TLB + 1.54BTB
-35.085 -1144.373 -3008.472
Max My 28081 3147 1.15DL
27061
+ 1.2SIDL
9916.186
+ 0.42CL +280.84
0.42PLA +984.651
0.462TLA +12.946
0.462BTA3958.588
+ 0.3SLX +1200.042
0.3SLY + 1SLZ + 1.54NLA
Min My 28081 3154 1.15DL
27061
+ 1.2SIDL
-2079.44
+ 0.42CL-183.623
+ 0.42PLA +-972.013
0.462TLA --14.455
0.462BTA-4119.101
- 0.3SLX - 0.3SLY
-687.039
- 1SLZ - 1.54NLA
Max Mz 28081 2103 1.15DL
27061
+ 1.2SIDL
11182.5
+ 1.4CL 1181.323
+ 1.4PLB + 1.54TLB
348.099+ 1.54BTB
34.060 1286.288 4834.514
Min Mz 28081 2104 1.15DL
27065
+ 1.2SIDL
-2711.7
+ 1.4CL-1070.519
+ 1.4PLB + -324.484
1.54TLB - 1.54BTB
-34.472 -1141.115 -3191.159
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28081 1095 1DL 27061
+ 1SIDL +8363.084
0.3CL + 0.3PLA234.6
+ 0.3PLB791.358
+ 0.33TLA + 0.33TLB
9.656 + 3128.975
0.33BTA + 0.33BTB
1004.667+ 0.3SLX + 0.3SLY + 1SLZ
Min Fx 28081 1015 1DL 27065
+ 1SIDL + 0.3SLX
-1662.4+ 0.3SLY
-139.575
+ 1SLZ -780.666 -10.841 -2462.087 -387.953
Max Fy 28081 1079 1DL 27061
+ 1SIDL +8189.707
0.3CL + 0.3PLA
625.507
+ 0.3PLB399.593
+ 0.33TLA + 18.775
0.33TLB + 1552.254
0.33BTA + 0.33BTB
2586.517+ 1SLX + 0.3SLY + 0.3SLZ
Min Fy 28081 1086 1DL 27061
+ 1SIDL +-1198.83
0.3CL + 0.3PLA
-539.598
+ 0.3PLB-388.125
+ 0.33TLA +-20.002
0.33TLB - -1684.649
0.33BTA - 0.33BTB
-2130.796
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 28081 3071 1DL 27061
+ 1SIDL +8245.954
0.3CL + 0.3PLB
225.514
+ 0.33TLB798.757
+ 0.33BTB9.163
+ 0.3SLX3106.042
+ 0.3SLY + 1SLZ
968.133
+ 1.1NLB
Min Fz 28081 3047 1DL 27065
+ 1SIDL +-1424.95
0.3CL + 0.3PLA
-128.34
+ 0.33TLA
-787.596
+ 0.33BTA-10.326
+ 0.3SLX-2450.474
+ 0.3SLY + 1SLZ
-352.746
+ 1.1NLA
Max Mx 28081 3062 1DL 27065
+ 1SIDL +7889.906
0.3CL + 0.3PLB
601.507
+ 0.33TLB396.076
- 0.33BTB19.447
- 1SLX - 1176.968
0.3SLY - 0.3SLZ1894.621
- 1.1NLB
Min Mx 28081 3038 1DL 27061
+ 1SIDL +-1266.64
0.3CL + 0.3PLA
-533.844
+ 0.33TLA
-382.883
- 0.33BTA-20.612
- 1SLX - 0.3SLY
-1707.03- 0.3SLZ
-2113.489
- 1.1NLA
Max My 28081 3047 1DL 27061
+ 1SIDL +8112.575
0.3CL + 0.3PLA
225.456
+ 0.33TLA785.683
+ 0.33BTA 10.209
+ 0.3SLX 3147.789
+ 0.3SLY + 1SLZ
967.013
+ 1.1NLA
Min My 28081 3054 1DL 27061
+ 1SIDL +-1440.02
0.3CL + 0.3PLA
-142.936
+ 0.33TLA
-774.647
- 0.33BTA-11.493
- 0.3SLX-3283.751
- 0.3SLY - 1SLZ
-531.639
- 1.1NLA
Max Mz 28081 1079 1DL 27061
+ 1SIDL +8189.707
0.3CL + 0.3PLA
625.507
+ 0.3PLB399.593
+ 0.33TLA + 18.775
0.33TLB + 1552.254
0.33BTA + 0.33BTB
2586.517+ 1SLX + 0.3SLY + 0.3SLZ
Min Mz 28081 1086 1DL 27061
+ 1SIDL +-1198.83
0.3CL + 0.3PLA
-539.598
+ 0.3PLB-388.125
+ 0.33TLA +-20.002
0.33TLB - -1684.649
0.33BTA - 0.33BTB
-2130.796
- 1SLX - 0.3SLY - 0.3SLZ
c) Static LC 1001-1006
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28078 1006 1DL 27058
+ 1SIDL +4484.378
1CL + 1PLA + 1PLB
-21.88+ 1.1TLA
-20.257
+ 1.1TLB --0.706
1.1BTA - 1.1BTB
151.063 -118.265
Min Fx 28078 1003 1DL 27058
+ 1SIDL +3421.728
1CL + 1PLB + 49.273
1.1TLB + 1.1BTB
-17.04 -0.758 136.168 145.577
Max Fy 28078 1005 1DL 27058
+ 1SIDL +3772.961
1CL + 1PLA + 76.629
1PLB + 1.1TLA
-26.834
+ 1.1TLB +-0.915
1.1BTA + 171.824
1.1BTB 242.684
Min Fy 28078 1006 1DL 27058
+ 1SIDL +4484.378
1CL + 1PLA + 1PLB
-21.88+ 1.1TLA
-20.257
+ 1.1TLB --0.706
1.1BTA - 1.1BTB
151.063 -118.265
Max Fz 28078 1003 1DL 27058
+ 1SIDL +3421.728
1CL + 1PLB + 49.273
1.1TLB + 1.1BTB
-17.04 -0.758 136.168 145.577
Min Fz 28078 1005 1DL 27058
+ 1SIDL +3772.961
1CL + 1PLA + 76.629
1PLB + 1.1TLA
-26.834
+ 1.1TLB +-0.915
1.1BTA + 171.824
1.1BTB 242.684
Max Mx 28078 1004 1DL 27058
+ 1SIDL +3799.384
1CL + 1PLB + 1.1TLB
0.076 - 1.1BTB
-17.313 -0.218 139.468 -34.81
Min Mx 28078 1002 1DL 27058
+ 1SIDL +3942.867
1CL + 1PLA + 0.355
1.1TLA - -17.554
1.1BTA -1.062 116.458 -34.975
Max My 28078 1005 1DL 27058
+ 1SIDL +3772.961
1CL + 1PLA + 76.629
1PLB + 1.1TLA
-26.834
+ 1.1TLB +-0.915
1.1BTA + 171.824
1.1BTB 242.684
Min My 28078 1002 1DL 27062
+ 1SIDL +3942.867
1CL + 1PLA + 0.355
1.1TLA - -17.554
1.1BTA -1.062 98.904 -35.33
Max Mz 28078 1005 1DL 27058
+ 1SIDL +3772.961
1CL + 1PLA + 76.629
1PLB + 1.1TLA
-26.834
+ 1.1TLB +-0.915
1.1BTA + 171.824
1.1BTB 242.684
Min Mz 28078 1006 1DL 27058
+ 1SIDL +4484.378
1CL + 1PLA + 1PLB
-21.88+ 1.1TLA
-20.257
+ 1.1TLB --0.706
1.1BTA - 1.1BTB
151.063 -118.265
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28079 1005 1DL 27059
+ 1SIDL +4789.497
1CL + 1PLA +105.253
1PLB + 1.1TLA
-28.287
+ 1.1TLB +-0.888
1.1BTA + 183.639
1.1BTB 477.983
Min Fx 28079 1004 1DL 27059
+ 1SIDL +3719.138
1CL + 1PLB + 25.188
1.1TLB - 1.1BTB
-17.007 -0.209 136.941 171.625
Max Fy 28079 1005 1DL 27059
+ 1SIDL +4789.497
1CL + 1PLA +105.253
1PLB + 1.1TLA
-28.287
+ 1.1TLB +-0.888
1.1BTA + 183.639
1.1BTB 477.983
Min Fy 28079 1006 1DL 27059
+ 1SIDL +4043.905
1CL + 1PLA + 1PLB
6.816
+ 1.1TLA
-19.321
+ 1.1TLB --0.695
1.1BTA - 1.1BTB
143.378 117.638
Max Fz 28079 1004 1DL 27059
+ 1SIDL +3719.138
1CL + 1PLB + 25.188
1.1TLB - 1.1BTB
-17.007 -0.209 136.941 171.625
Min Fz 28079 1005 1DL 27059
+ 1SIDL +4789.497
1CL + 1PLA +105.253
1PLB + 1.1TLA
-28.287
+ 1.1TLB +-0.888
1.1BTA + 183.639
1.1BTB 477.983
Max Mx 28079 1004 1DL 27059
+ 1SIDL +3719.138
1CL + 1PLB + 25.188
1.1TLB - 1.1BTB
-17.007 -0.209 136.941 171.625
Min Mx 28079 1002 1DL 27059
+ 1SIDL +3867.649
1CL + 1PLA + 26.133
1.1TLA - -17.255
1.1BTA -1.053 113.976 176.939
Max My 28079 1005 1DL 27059
+ 1SIDL +4789.497
1CL + 1PLA +105.253
1PLB + 1.1TLA
-28.287
+ 1.1TLB +-0.888
1.1BTA + 183.639
1.1BTB 477.983
Min My 28079 1002 1DL 27063
+ 1SIDL +3867.649
1CL + 1PLA + 26.133
1.1TLA - -17.255
1.1BTA -1.053 96.722 150.805
Max Mz 28079 1005 1DL 27059
+ 1SIDL +4789.497
1CL + 1PLA +105.253
1PLB + 1.1TLA
-28.287
+ 1.1TLB +-0.888
1.1BTA + 183.639
1.1BTB 477.983
Min Mz 28079 1006 1DL 27063
+ 1SIDL +4043.905
1CL + 1PLA + 1PLB
6.816
+ 1.1TLA
-19.321
+ 1.1TLB --0.695
1.1BTA - 1.1BTB
124.058 110.822
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28080 1006 1DL 27060
+ 1SIDL +4514.154
1CL + 1PLA + 1PLB
-22
+ 1.1TLA
9.496
+ 1.1TLB --0.722
1.1BTA - 1.1BTB
-93.518 -119.259
Min Fx 28080 1001 1DL 27060
+ 1SIDL +3372.254
1CL + 1PLA + 50.093
1.1TLA + 1.1BTA
0.085 -0.602 -60.892 149.067
Max Fy 28080 1005 1DL 27060
+ 1SIDL +3716.364
1CL + 1PLA + 76.631
1PLB + 1.1TLA
0.336
+ 1.1TLB +-0.728
1.1BTA + 1.1BTB
-51.662 242.683
Min Fy 28080 1006 1DL 27060
+ 1SIDL +4514.154
1CL + 1PLA + 1PLB
-22
+ 1.1TLA
9.496
+ 1.1TLB --0.722
1.1BTA - 1.1BTB
-93.518 -119.259
Max Fz 28080 1006 1DL 27060
+ 1SIDL +4514.154
1CL + 1PLA + 1PLB
-22
+ 1.1TLA
9.496
+ 1.1TLB --0.722
1.1BTA - 1.1BTB
-93.518 -119.259
Min Fz 28080 1001 1DL 27060
+ 1SIDL +3372.254
1CL + 1PLA + 50.093
1.1TLA + 1.1BTA
0.085 -0.602 -60.892 149.067
Max Mx 28080 1004 1DL 27060
+ 1SIDL +3942.465
1CL + 1PLB + -0.294
1.1TLB - 1.1BTB
8.475 -0.192 -72.543 -37.859
Min Mx 28080 1002 1DL 27060
+ 1SIDL + 3794.16
1CL + 1PLA + 0.651
1.1TLA - 1.1BTA
8.228 -1.035 -95.514 -32.551
Max My 28080 1005 1DL 27064
+ 1SIDL +3716.364
1CL + 1PLA + 76.631
1PLB + 1.1TLA
0.336
+ 1.1TLB +-0.728
1.1BTA + 1.1BTB
-51.327 166.052
Min My 28080 1002 1DL 27060
+ 1SIDL + 3794.16
1CL + 1PLA + 0.651
1.1TLA - 1.1BTA
8.228 -1.035 -95.514 -32.551
Max Mz 28080 1005 1DL 27060
+ 1SIDL +3716.364
1CL + 1PLA + 76.631
1PLB + 1.1TLA
0.336
+ 1.1TLB +-0.728
1.1BTA + 1.1BTB
-51.662 242.683
Min Mz 28080 1006 1DL 27060
+ 1SIDL +4514.154
1CL + 1PLA + 1PLB
-22
+ 1.1TLA
9.496
+ 1.1TLB --0.722
1.1BTA - 1.1BTB
-93.518 -119.259
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 28081 1005 1DL 27061
+ 1SIDL +4732.899
1CL + 1PLA +105.251
1PLB + 1.1TLA
1.788
+ 1.1TLB +-0.701
1.1BTA + 1.1BTB
-63.476 477.985
Min Fx 28081 1002 1DL 27061
+ 1SIDL +3718.941
1CL + 1PLA + 25.838
1.1TLA - 1.1BTA
7.928 -1.025 -93.032 174.515
Max Fy 28081 1005 1DL 27061
+ 1SIDL +4732.899
1CL + 1PLA +105.251
1PLB + 1.1TLA
1.788
+ 1.1TLB +-0.701
1.1BTA + 1.1BTB
-63.476 477.985
Min Fy 28081 1006 1DL 27061
+ 1SIDL +4073.679
1CL + 1PLA + 1PLB
6.936
+ 1.1TLA8.56
+ 1.1TLB --0.711
1.1BTA - 1.1BTB
-85.834 118.631
Max Fz 28081 1006 1DL 27061
+ 1SIDL +4073.679
1CL + 1PLA + 1PLB
6.936
+ 1.1TLA8.56
+ 1.1TLB --0.711
1.1BTA - 1.1BTB
-85.834 118.631
Min Fz 28081 1001 1DL 27061
+ 1SIDL +4026.568
1CL + 1PLA + 75.053
1.1TLA + 1.1BTA
0.981 -0.577 -68.171 354.278
Max Mx 28081 1004 1DL 27061
+ 1SIDL +3862.219
1CL + 1PLB + 25.558
1.1TLB - 1.1BTB
8.169 -0.183 -70.015 174.674
Min Mx 28081 1002 1DL 27061
+ 1SIDL +3718.941
1CL + 1PLA + 25.838
1.1TLA - 1.1BTA
7.928 -1.025 -93.032 174.515
Max My 28081 1005 1DL 27065
+ 1SIDL +4732.899
1CL + 1PLA +105.251
1PLB + 1.1TLA
1.788
+ 1.1TLB +-0.701
1.1BTA + 1.1BTB
-61.687 372.734
Min My 28081 1002 1DL 27061
+ 1SIDL +3718.941
1CL + 1PLA + 25.838
1.1TLA - 1.1BTA
7.928 -1.025 -93.032 174.515
Max Mz 28081 1005 1DL 27061
+ 1SIDL +4732.899
1CL + 1PLA +105.251
1PLB + 1.1TLA
1.788
+ 1.1TLB +-0.701
1.1BTA + 1.1BTB
-63.476 477.985
Min Mz 28081 1006 1DL 27065
+ 1SIDL +4073.679
1CL + 1PLA + 1PLB
6.936
+ 1.1TLA8.56
+ 1.1TLB --0.711
1.1BTA - 1.1BTB
-77.274 111.695
MDE Seismic
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
ODE Seismic
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
Static
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
Z = 0.80 m
P kN
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = 510.276 kN.m
Design Moment, M = M1 - M2
= 28716.101 mm2 OK
P kN Z = 0.80 m
2.0 m
column Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or
(P1+P2)xZ or (P3+P4)xZ, whichever
is minimum
Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = -510.276 kN.m
Design Moment, M = M1 + M2
= 21357.103 mm2 OK
3.3 Moment Capacity, Stress and Crack Width Check from Oasys
Oasys Results
Cocncrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
3 4.356 OK 3 22.65 OK
3 4.356 OK 3 22.65 OK
Minima Minima
3 -0.5875 OK 3 -95.83 OK
3 -0.5875 OK 3 -95.83 OK
No. of piles n = 4
Dia of pile = 1.20 m
Size of Column = 2.00 m x 2.00 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30899 2195 1.15DL
29955
+ 1.2SIDL
10407.32
+ 0.42CL 311.187
+ 0.42PLA + 0.42PLB
905.67 + 0.462TLA
12.495 + 0.462TLB
3922.269 + 0.462BTA
1350.156+ 0.462BTB + 0.3SLX + 0.3S
Min Fx 30775 2115 1.15DL
29835
+ 1.2SIDL
-2101.62
+ 0.3SLX-190.949
+ 0.3SLY + 1SLZ
-972.526 -14.158 -2799.85 -555.118
Max Fy 30899 2103 1.15DL
29955
+ 1.2SIDL
10094.4
+ 1.4CL +1209.91
1.4PLB + 1.54TLB
97.192+ 1.54BTB
32.220 658.423 4958.816
Min Fy 30775 2104 1.15DL
29835
+ 1.2SIDL
-605.356
+ 1.4CL-1081.937
+ 1.4PLB + -235.549
1.54TLB - 1.54BTB
-36.019 -505.653 -3210.801
Max Fz 30775 3154 1.15DL
29835
+ 1.2SIDL
9789.129
+ 0.42CL 270.616
+ 0.42PLA +946.509
0.462TLA - 12.233
0.462BTA2977.523
- 0.3SLX - 0.3SLY
914.578
- 1SLZ - 1.54NLA
Min Fz 30775 3178 1.15DL
29831
+ 1.2SIDL
-1684.5
+ 0.42CL +-195.85
0.42PLB +-983.124
0.462TLB-13.551
- 0.462BTB
-3681.796
- 0.3SLX - 0.3SLY
-754.036
- 1SLZ - 1.54NLB
Max Mx 30775 2104 1.15DL
29831
+ 1.2SIDL
9358.045
+ 1.4CL 1124.951
+ 1.4PLB + 1.54TLB
194.547- 1.54BTB
35.392 1000.043 4625.758
Min Mx 30775 2103 1.15DL
29835
+ 1.2SIDL
-98.69
+ 1.4CL +-1005.71
1.4PLB + -238.354
1.54TLB + 1.54BTB
-36.724 -494.025 -2996.857
Max My 30775 3147 1.15DL
29831
+ 1.2SIDL
10030.19
+ 0.42CL 293.633
+ 0.42PLA +929.623
0.462TLA +13.552
0.462BTA
4009.912
+ 0.3SLX +1273.284
0.3SLY + 1SLZ + 1.54NLA
Min My 30775 3154 1.15DL
29831
+ 1.2SIDL
-1693.82
+ 0.42CL-195.449
+ 0.42PLA +-964.663
0.462TLA --14.769
0.462BTA-3770.14
- 0.3SLX - 0.3SLY
-752.223
- 1SLZ - 1.54NLA
Max Mz 30899 2103 1.15DL
29955
+ 1.2SIDL
10094.4
+ 1.4CL +1209.91
1.4PLB + 1.54TLB
97.192+ 1.54BTB
32.220 658.423 4958.816
Min Mz 30775 2104 1.15DL
29835
+ 1.2SIDL
-605.356
+ 1.4CL-1081.937
+ 1.4PLB + -235.549
1.54TLB - 1.54BTB
-36.019 -505.653 -3210.801
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30900 2202 1.15DL
29960
+ 1.2SIDL
10066.72
+ 0.42CL 236.022
+ 0.42PLA +938.608
0.42PLB + 0.462TLA
11.461 + 0.462TLB
2747.201 - 0.462BTA
701.229- 0.462BTB - 0.3SLX - 0.3SLY
Min Fx 30776 2115 1.15DL
29836
+ 1.2SIDL
-2397.93
+ 0.3SLX-213.513
+ 0.3SLY + 1SLZ
-949.857 -13.016 -2961.74 -718.075
Max Fy 30900 2103 1.15DL
29956
+ 1.2SIDL
9226.288
+ 1.4CL 1181.699
+ 1.4PLB + 1.54TLB
125.461+ 1.54BTB
30.357 425.71 4726.898
Min Fy 30776 2104 1.15DL
29836
+ 1.2SIDL
-460.654
+ 1.4CL-1111.666
+ 1.4PLB + 1.54TLB
-205.84- 1.54BTB
-33.782 -719.733 -3425.463
Max Fz 30776 3154 1.15DL
29836
+ 1.2SIDL
9644.409
+ 0.42CL 244.569
+ 0.42PLA +972.452
0.462TLA - 11.201
0.462BTA2788.398
- 0.3SLX - 0.3SLY
726.522
- 1SLZ - 1.54NLA
Min Fz 30776 3178 1.15DL
29832
+ 1.2SIDL
-1869.13
+ 0.42CL-221.933
+ 0.42PLB +-956.937
0.462TLB-12.440
- 0.462BTB
-3895.038
- 0.3SLX - 0.3SLY
-968.48
- 1SLZ - 1.54NLB
Max Mx 30776 2104 1.15DL
29832
+ 1.2SIDL
9530.465
+ 1.4CL 1095.324
+ 1.4PLB + 1.54TLB
224.194- 1.54BTB
33.159 755.814 4382.198
Min Mx 30776 2103 1.15DL
29836
+ 1.2SIDL
-970.897
+ 1.4CL-1035.426
+ 1.4PLB + -208.658
1.54TLB + 1.54BTB
-34.335 -708.008 -3211.423
Max My 30776 3147 1.15DL
29832
+ 1.2SIDL
9402.135
+ 0.42CL 267.591
+ 0.42PLA +955.561
0.462TLA +12.532
0.462BTA3794.64
+ 0.3SLX +1059.217
0.3SLY + 1SLZ + 1.54NLA
Min My 30776 3154 1.15DL
29832
+ 1.2SIDL
-1859.99
+ 0.42CL-221.531
+ 0.42PLA +-938.476
0.462TLA --13.620
0.462BTA
-3983.376
- 0.3SLX - 0.3SLY
-966.662
- 1SLZ - 1.54NLA
Max Mz 30900 2103 1.15DL
29956
+ 1.2SIDL
9226.288
+ 1.4CL 1181.699
+ 1.4PLB + 1.54TLB
125.461+ 1.54BTB
30.357 425.71 4726.898
Min Mz 30776 2104 1.15DL
29836
+ 1.2SIDL
-460.654
+ 1.4CL-1111.666
+ 1.4PLB + 1.54TLB
-205.84- 1.54BTB
-33.782 -719.733 -3425.463
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30777 2103 1.15DL
29833
+ 1.2SIDL
11298.35
+ 1.4CL +1203.17
1.4PLB + 1.54TLB
232.634+ 1.54BTB
33.041 843.356 4932.094
Min Fx 30777 2115 1.15DL
29837
+ 1.2SIDL
-2352.44
+ 0.3SLX-182.631
+ 0.3SLY + 1SLZ
-951.462 -13.757 -2977.075 -513.499
Max Fy 30901 2103 1.15DL
29957
+ 1.2SIDL
10608.69
+ 1.4CL 1210.666
+ 1.4PLB + 1.54TLB
133.244+ 1.54BTB
30.580 471.493 4964.958
Min Fy 30777 2104 1.15DL
29837
+ 1.2SIDL
-2037.05
+ 1.4CL-1083.793
+ 1.4PLB + -216.353
1.54TLB - 1.54BTB
-34.189 -789.038 -3223.962
Max Fz 30777 3154 1.15DL
29837
+ 1.2SIDL
9979.461
+ 0.42CL 262.175
+ 0.42PLA +974.395
0.462TLA - 11.947
0.462BTA2801.363
- 0.3SLX - 0.3SLY
872.068
- 1SLZ - 1.54NLA
Min Fz 30777 3178 1.15DL
29833
+ 1.2SIDL
-1944.53
+ 0.42CL-187.468
+ 0.42PLB +-958.754
0.462TLB-13.164
- 0.462BTB
-3910.776
- 0.3SLX - 0.3SLY
-701.033
- 1SLZ - 1.54NLB
Max Mx 30777 2104 1.15DL
29833
+ 1.2SIDL
10813.11
+ 1.4CL 1126.973
+ 1.4PLB + 1.54TLB
233.905- 1.54BTB
33.590 841.416 4642.163
Min Mx 30777 2103 1.15DL
29837
+ 1.2SIDL
-1551.81
+ 1.4CL-1007.596
+ 1.4PLB + -217.624
1.54TLB + 1.54BTB
-34.738 -788.37 -3010.228
Max My 30777 3147 1.15DL
29833
+ 1.2SIDL
10034.35
+ 0.42CL 284.926
+ 0.42PLA +957.965
0.462TLA +13.312
0.462BTA
3805.659
+ 0.3SLX + 0.3SLY
1217.65+ 1SLZ + 1.54NLA
Min My 30777 3154 1.15DL
29833
+ 1.2SIDL
-1930.93
+ 0.42CL-187.192
+ 0.42PLA +-940.287
0.462TLA --14.381
0.462BTA
-3999.171
- 0.3SLX - 0.3SLY
-700.274
- 1SLZ - 1.54NLA
Max Mz 30901 2103 1.15DL
29957
+ 1.2SIDL
10608.69
+ 1.4CL 1210.666
+ 1.4PLB + 1.54TLB
133.244+ 1.54BTB
30.580 471.493 4964.958
Min Mz 30777 2104 1.15DL
29837
+ 1.2SIDL
-2037.05
+ 1.4CL-1083.793
+ 1.4PLB + -216.353
1.54TLB - 1.54BTB
-34.189 -789.038 -3223.962
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30777 1095 1DL 29833
+ 1SIDL +8465.133
0.3CL + 0.3PLA
237.944
+ 0.3PLB767.856
+ 0.33TLA + 0.33TLB
9.933 + 3013.887
0.33BTA + 0.33BTB1019.2
+ 0.3SLX + 0.3SLY + 1SLZ
Min Fx 30777 1015 1DL 29837
+ 1SIDL +-1624.61
0.3SLX + 0.3SLY
-142.428
+ 1SLZ -757.52 -11.001 -2376.132 -396.414
Max Fy 30901 1079 1DL 29957
+ 1SIDL +8030.367
0.3CL + 0.3PLA
637.052
+ 0.3PLB288.743
+ 0.33TLA + 17.316
0.33TLB + 1097.438
0.33BTA + 0.33BTB
2635.496
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fy 30777 1086 1DL 29833
+ 1SIDL +-944.309
0.3CL + 0.3PLA
-548.152
+ 0.3PLB-328.272
+ 0.33TLA +-19.680
0.33TLB - -1445.902
0.33BTA - 0.33BTB
-2163.576
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30777 3054 1DL 29837
+ 1SIDL + 8163.96
0.3CL + 0.3PLA
212.117
+ 0.33TLA775.627
- 0.33BTA 9.522
- 0.3SLX2231.497
- 0.3SLY - 1SLZ707.502
- 1.1NLA
Min Fz 30777 3078 1DL 29833
+ 1SIDL +-1333.24
0.3CL + 0.3PLB
-145.882
+ 0.33TLB
-762.729
- 0.33BTB
-10.577
- 0.3SLX-3122.668
- 0.3SLY - 1SLZ
-542.116
- 1.1NLB
Max Mx 30777 3031 1DL 29833
+ 1SIDL +7925.917
0.3CL + 0.3PLA
623.961
+ 0.33TLA337.046
+ 0.33BTA 19.128
+ 1SLX 1312.424
+ 0.3SLY + 0.3SLZ
2578.358
+ 1.1NLA
Min Mx 30777 3055 1DL 29837
+ 1SIDL +-896.073
0.3CL + 0.3PLB
-525.019
+ 0.33TLB
-326.341
+ 0.33BTB
-20.170
+ 1SLX -1101.756
+ 0.3SLY + 0.3SLZ
-1554.386
+ 1.1NLB
Max My 30777 3047 1DL 29833
+ 1SIDL +8203.165
0.3CL + 0.3PLA
228.368
+ 0.33TLA763.891
+ 0.33BTA 10.497
+ 0.3SLX 3026.732
+ 0.3SLY + 1SLZ
978.968
+ 1.1NLA
Min My 30777 3054 1DL 29833
+ 1SIDL +-1323.53
0.3CL + 0.3PLA
-145.685
+ 0.33TLA
-749.538
- 0.33BTA-11.447
- 0.3SLX-3185.807
- 0.3SLY - 1SLZ
-541.575
- 1.1NLA
Max Mz 30901 1079 1DL 29957
+ 1SIDL +8030.367
0.3CL + 0.3PLA
637.052
+ 0.3PLB288.743
+ 0.33TLA + 17.316
0.33TLB + 1097.438
0.33BTA + 0.33BTB
2635.496
+ 1SLX + 0.3SLY + 0.3SLZ
Min Mz 30777 1086 1DL 29833
+ 1SIDL +-944.309
0.3CL + 0.3PLA
-548.152
+ 0.3PLB-328.272
+ 0.33TLA +-19.680
0.33TLB - -1445.902
0.33BTA - 0.33BTB
-2163.576
- 1SLX - 0.3SLY - 0.3SLZ
c) Static LC 1001-1006
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30774 1006 1DL 29830
+ 1SIDL +4884.759
1CL + 1PLA +-29.052
1PLB + 1.1TLA
-18.679
+ 1.1TLB --0.655
1.1BTA - 1.1BTB
145.544 -159.967
Min Fx 30898 1003 1DL 29954
+ 1SIDL + 3695.82
1CL + 1PLB + 56.912
1.1TLB + -27.876
1.1BTB -0.731 187.068 180.21
Max Fy 30898 1005 1DL 29954
+ 1SIDL +4136.195
1CL + 1PLA + 1PLB
84.87
+ 1.1TLA
-27.529
+ 1.1TLB +-0.590
1.1BTA + 174.131
1.1BTB 279.765
Min Fy 30774 1006 1DL 29830
+ 1SIDL +4884.759
1CL + 1PLA +-29.052
1PLB + 1.1TLA
-18.679
+ 1.1TLB --0.655
1.1BTA - 1.1BTB
145.544 -159.967
Max Fz 30774 1002 1DL 29830
+ 1SIDL +4276.629
1CL + 1PLA + -2.468
1.1TLA - 1.1BTA
-12.57 -0.616 93.141 -53.942
Min Fz 30898 1003 1DL 29954
+ 1SIDL + 3695.82
1CL + 1PLB + 56.912
1.1TLB + -27.876
1.1BTB -0.731 187.068 180.21
Max Mx 30898 1001 1DL 29954
+ 1SIDL +3866.435
1CL + 1PLA + 57.464
1.1TLA + -19.163
1.1BTA -0.184 115.176 180.861
Min Mx 30774 1003 1DL 29830
+ 1SIDL + 3773.78
1CL + 1PLB + 51.726
1.1TLB + -24.721
1.1BTB -1.060 175.409 153.844
Max My 30898 1003 1DL 29954
+ 1SIDL + 3695.82
1CL + 1PLB + 56.912
1.1TLB + -27.876
1.1BTB -0.731 187.068 180.21
Min My 30774 1002 1DL 29834
+ 1SIDL +4276.629
1CL + 1PLA + -2.468
1.1TLA - 1.1BTA
-12.57 -0.616 80.57 -51.474
Max Mz 30898 1005 1DL 29954
+ 1SIDL +4136.195
1CL + 1PLA + 1PLB
84.87
+ 1.1TLA
-27.529
+ 1.1TLB +-0.590
1.1BTA + 174.131
1.1BTB 279.765
Min Mz 30774 1006 1DL 29830
+ 1SIDL +4884.759
1CL + 1PLA +-29.052
1PLB + 1.1TLA
-18.679
+ 1.1TLB --0.655
1.1BTA - 1.1BTB
145.544 -159.967
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30775 1005 1DL 29831
+ 1SIDL +5218.422
1CL + 1PLA + 111.81
1PLB + 1.1TLA
-27.341
+ 1.1TLB +-0.830
1.1BTA + 181.146
1.1BTB 516.536
Min Fx 30899 1004 1DL 29955
+ 1SIDL + 3972.17
1CL + 1PLB + 28.262
1.1TLB - 1.1BTB
-25.328 -0.282 177.873 188.031
Max Fy 30899 1005 1DL 29955
+ 1SIDL +5139.809
1CL + 1PLA +116.062
1PLB + 1.1TLA
-28.861
+ 1.1TLB +-0.564
1.1BTA + 184.935
1.1BTB 536.173
Min Fy 30775 1006 1DL 29831
+ 1SIDL +4463.387
1CL + 1PLA + 1PLB
2.679
+ 1.1TLA
-17.841
+ 1.1TLB --0.650
1.1BTA - 1.1BTB
138.674 100.889
Max Fz 30775 1002 1DL 29831
+ 1SIDL +4212.753
1CL + 1PLA + 25.845
1.1TLA - -12.311
1.1BTA -0.618 90.997 178.819
Min Fz 30899 1005 1DL 29955
+ 1SIDL +5139.809
1CL + 1PLA +116.062
1PLB + 1.1TLA
-28.861
+ 1.1TLB +-0.564
1.1BTA + 184.935
1.1BTB 536.173
Max Mx 30899 1001 1DL 29955
+ 1SIDL +4516.576
1CL + 1PLA + 85.184
1.1TLA + -19.966
1.1BTA -0.172 121.673 408.735
Min Mx 30775 1003 1DL 29831
+ 1SIDL +4415.913
1CL + 1PLB + 79.228
1.1TLB + -25.561
1.1BTB -1.037 182.225 379.917
Max My 30899 1003 1DL 29955
+ 1SIDL +4338.941
1CL + 1PLB + 83.758
1.1TLB + -28.672
1.1BTB -0.701 193.512 400.884
Min My 30775 1002 1DL 29835
+ 1SIDL +4212.753
1CL + 1PLA + 25.845
1.1TLA - -12.311
1.1BTA -0.618 78.686 152.973
Max Mz 30899 1005 1DL 29955
+ 1SIDL +5139.809
1CL + 1PLA +116.062
1PLB + 1.1TLA
-28.861
+ 1.1TLB +-0.564
1.1BTA + 184.935
1.1BTB 536.173
Min Mz 30775 1006 1DL 29835
+ 1SIDL +4463.387
1CL + 1PLA + 1PLB
2.679
+ 1.1TLA
-17.841
+ 1.1TLB --0.650
1.1BTA - 1.1BTB
120.833 98.21
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30776 1006 1DL 29832
+ 1SIDL +4884.015
1CL + 1PLA +-29.073
1PLB + 1.1TLA
13.912
+ 1.1TLB --0.682
1.1BTA - 1.1BTB
-122.36 -160.145
Min Fx 30900 1001 1DL 29956
+ 1SIDL +3595.392
1CL + 1PLA + 58.027
1.1TLA + 1.1BTA
7.191 -0.038 -101.582 185.481
Max Fy 30900 1005 1DL 29956
+ 1SIDL +4015.361
1CL + 1PLA + 85.024
1PLB + 1.1TLA
2.177
+ 1.1TLB +-0.384
1.1BTA + 1.1BTB
-70.221 281.019
Min Fy 30776 1006 1DL 29832
+ 1SIDL +4884.015
1CL + 1PLA +-29.073
1PLB + 1.1TLA
13.912
+ 1.1TLB --0.682
1.1BTA - 1.1BTB
-122.36 -160.145
Max Fz 30776 1002 1DL 29832
+ 1SIDL +4093.257
1CL + 1PLA + -2.034
1.1TLA - 1.1BTA
15.568 -0.592 -138.192 -50.37
Min Fz 30900 1003 1DL 29956
+ 1SIDL +3777.734
1CL + 1PLB + 56.584
1.1TLB + 1.1BTB
-1.498 -0.587 -29.887 177.487
Max Mx 30900 1001 1DL 29956
+ 1SIDL +3595.392
1CL + 1PLA + 58.027
1.1TLA + 1.1BTA
7.191 -0.038 -101.582 185.481
Min Mx 30776 1003 1DL 29832
+ 1SIDL +3888.059
1CL + 1PLB + 51.357
1.1TLB + 1.1BTB
2.31 -0.926 -46.902 150.791
Max My 30900 1003 1DL 29956
+ 1SIDL +3777.734
1CL + 1PLB + 56.584
1.1TLB + 1.1BTB
-1.498 -0.587 -29.887 177.487
Min My 30776 1002 1DL 29832
+ 1SIDL +4093.257
1CL + 1PLA + -2.034
1.1TLA - 1.1BTA
15.568 -0.592 -138.192 -50.37
Max Mz 30900 1005 1DL 29956
+ 1SIDL +4015.361
1CL + 1PLA + 85.024
1PLB + 1.1TLA
2.177
+ 1.1TLB +-0.384
1.1BTA + 1.1BTB
-70.221 281.019
Min Mz 30776 1006 1DL 29832
+ 1SIDL +4884.015
1CL + 1PLA +-29.073
1PLB + 1.1TLA
13.912
+ 1.1TLB --0.682
1.1BTA - 1.1BTB
-122.36 -160.145
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30777 1005 1DL 29833
+ 1SIDL +5126.657
1CL + 1PLA +111.704
1PLB + 1.1TLA
5.767
+ 1.1TLB +-0.633
1.1BTA + 1.1BTB
-90.888 515.678
Min Fx 30901 1002 1DL 29957
+ 1SIDL +3925.724
1CL + 1PLA + 28.993
1.1TLA - 1.1BTA
13.699 -0.447 -128.726 191.004
Max Fy 30901 1005 1DL 29957
+ 1SIDL +5018.975
1CL + 1PLA +115.907
1PLB + 1.1TLA
3.509
+ 1.1TLB +-0.358
1.1BTA + 1.1BTB
-81.024 534.92
Min Fy 30777 1006 1DL 29833
+ 1SIDL +4462.643
1CL + 1PLA + 1PLB
2.701
+ 1.1TLA
13.074
+ 1.1TLB --0.677
1.1BTA - 1.1BTB
-115.49 101.067
Max Fz 30777 1002 1DL 29833
+ 1SIDL +4029.381
1CL + 1PLA + 25.411
1.1TLA - 1.1BTA
15.309 -0.595 -136.048 175.247
Min Fz 30901 1003 1DL 29957
+ 1SIDL +4420.855
1CL + 1PLB + 84.087
1.1TLB + 1.1BTB
-0.702 -0.557 -36.331 403.609
Max Mx 30901 1001 1DL 29957
+ 1SIDL +4245.533
1CL + 1PLA + 84.621
1.1TLA + 1.1BTA
7.994 -0.025 -108.078 404.115
Min Mx 30777 1003 1DL 29833
+ 1SIDL +4530.192
1CL + 1PLB + 79.598
1.1TLB + 1.1BTB
3.15 -0.903 -53.718 382.97
Max My 30901 1003 1DL 29957
+ 1SIDL +4420.855
1CL + 1PLB + 84.087
1.1TLB + 1.1BTB
-0.702 -0.557 -36.331 403.609
Min My 30777 1002 1DL 29833
+ 1SIDL +4029.381
1CL + 1PLA + 25.411
1.1TLA - 1.1BTA
15.309 -0.595 -136.048 175.247
Max Mz 30901 1005 1DL 29957
+ 1SIDL +5018.975
1CL + 1PLA +115.907
1PLB + 1.1TLA
3.509
+ 1.1TLB +-0.358
1.1BTA + 1.1BTB
-81.024 534.92
Min Mz 30777 1006 1DL 29837
+ 1SIDL +4462.643
1CL + 1PLA + 1PLB
2.701
+ 1.1TLA
13.074
+ 1.1TLB --0.677
1.1BTA - -102.416
1.1BTB 98.366
MDE Seismic
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
ODE Seismic
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
Static
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
Z = 0.80 m
P kN
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = 510.276 kN.m
Design Moment, M = M1 - M2
= 28716.101 mm2 OK
P kN Z = 0.80 m
2.0 m
column Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or
(P1+P2)xZ or (P3+P4)xZ, whichever
is minimum
Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = -510.276 kN.m
Design Moment, M = M1 + M2
= 21357.103 mm2 OK
3.3 Moment Capacity, Stress and Crack Width Check from Oasys
Oasys Results
Cocncrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
3 2.555 OK 3 14.25 OK
3 2.555 OK 3 14.25 OK
Minima Minima
3 -0.5803 OK 3 -51.85 OK
3 -0.5803 OK 3 -51.85 OK
No. of piles n = 4
Dia of pile = 1.20 m
Size of Column = 2.00 m x 2.00 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31395 2103 1.15DL
30451
+ 1.2SIDL
10422.19
+ 1.4CL 1207.954
+ 1.4PLB + 1.54TLB
86.222+ 1.54BTB
17.300 564.455 4941.091
Min Fx 31395 2104 1.15DL
30455
+ 1.2SIDL
-2218.04
+ 1.4CL-1109.148
+ 1.4PLB + -125.827
1.54TLB - 1.54BTB
-20.126 -223.119 -3328.413
Max Fy 31147 2103 1.15DL
30203
+ 1.2SIDL
10363.97
+ 1.4CL 1219.821
+ 1.4PLB + 1.54TLB
73.041+ 1.54BTB
17.302 571.581 5000.218
Min Fy 31271 2104 1.15DL
30331
+ 1.2SIDL
-2086.65
+ 1.4CL-1115.067
+ 1.4PLB + -123.322
1.54TLB - 1.54BTB
-18.215 -242.932 -3349.152
Max Fz 31271 3154 1.15DL
30331
+ 1.2SIDL
9849.024
+ 0.42CL 274.067
+ 0.42PLA +935.844
0.462TLA - 8.244
0.462BTA2988.512
- 0.3SLX - 0.3SLY
926.131
- 1SLZ - 1.54NLA
Min Fz 31271 3178 1.15DL
30327
+ 1.2SIDL
-1892.27
+ 0.42CL-209.812
+ 0.42PLB +-973.016
0.462TLB-10.884
- 0.462BTB-3700.143
- 0.3SLX - 0.3SLY
-826.332
- 1SLZ - 1.54NLB
Max Mx 31023 2104 1.15DL
30079
+ 1.2SIDL
9158.862
+ 1.4CL 1125.999
+ 1.4PLB + 1.54TLB
65.57- 1.54BTB
25.292 485.233 4618.317
Min Mx 31023 2103 1.15DL
30083
+ 1.2SIDL
-1018.09
+ 1.4CL-1008.529
+ 1.4PLB + -108.084
1.54TLB + 1.54BTB
-25.899 -137.773 -3014.559
Max My 31271 2171 1.15DL
30327
+ 1.2SIDL
9967.692
+ 0.42CL 297.416
+ 0.42PLB +925.625
0.462TLB +8.132
0.462BTB
4000.432
+ 0.3SLX + 1289.502
0.3SLY + 1SLZ
Min My 31271 3154 1.15DL
30327
+ 1.2SIDL
-1899.64
+ 0.42CL-208.984
+ 0.42PLA +-957.293
0.462TLA - -9.833
0.462BTA-3775.08
- 0.3SLX - 0.3SLY
-822.633
- 1SLZ - 1.54NLA
Max Mz 31147 2103 1.15DL
30203
+ 1.2SIDL
10363.97
+ 1.4CL 1219.821
+ 1.4PLB + 1.54TLB
73.041+ 1.54BTB
17.302 571.581 5000.218
Min Mz 31271 2104 1.15DL
30331
+ 1.2SIDL
-2086.65
+ 1.4CL-1115.067
+ 1.4PLB + -123.322
1.54TLB - 1.54BTB
-18.215 -242.932 -3349.152
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31024 2104 1.15DL
30080
+ 1.2SIDL
10153.89
+ 1.4CL 1103.792
+ 1.4PLB + 1.54TLB
92.743- 1.54BTB
23.589 292.145 4435.702
Min Fx 31024 2103 1.15DL
30084
+ 1.2SIDL
-2825.82
+ 1.4CL-1036.922
+ 1.4PLB + 1.54TLB
-84.656+ 1.54BTB
-24.042 -334.113 -3219.519
Max Fy 31148 2103 1.15DL
30204
+ 1.2SIDL
9443.413
+ 1.4CL 1194.123
+ 1.4PLB + 1.54TLB
98.965+ 1.54BTB
16.629 360.234 4788.955
Min Fy 31272 2104 1.15DL
30332
+ 1.2SIDL
-2155.11
+ 1.4CL-1141.152
+ 1.4PLB + 1.54TLB
-98.034- 1.54BTB
-18.564 -430.994 -3537.496
Max Fz 31272 3154 1.15DL
30332
+ 1.2SIDL
9635.188
+ 0.42CL 249.267
+ 0.42PLA +960.618
0.462TLA - 8.426
0.462BTA2804.663
- 0.3SLX - 0.3SLY
747.15
- 1SLZ - 1.54NLA
Min Fz 31272 3178 1.15DL
30328
+ 1.2SIDL
-2224.63
+ 0.42CL-235.235
+ 0.42PLB +-947.567
0.462TLB-11.011
- 0.462BTB-3903.716
- 0.3SLX - 0.3SLY
-1035.42
- 1SLZ - 1.54NLB
Max Mx 31024 2103 1.15DL
30080
+ 1.2SIDL
9588.057
+ 1.4CL +1182.43
1.4PLB + 1.54TLB
85.473+ 1.54BTB
23.596 326.138 4738.954
Min Mx 31024 2104 1.15DL
30084
+ 1.2SIDL
-2259.99
+ 1.4CL +-1115.56
1.4PLB + 1.54TLB
-77.386- 1.54BTB
-24.049 -360.836 -3444.132
Max My 31272 2171 1.15DL
30328
+ 1.2SIDL
9511.193
+ 0.42CL 272.637
+ 0.42PLB +950.379
0.462TLB +8.342
0.462BTB3791.29
+ 0.3SLX + 1085.879
0.3SLY + 1SLZ
Min My 31272 3154 1.15DL
30328
+ 1.2SIDL
-2215.47
+ 0.42CL-234.414
+ 0.42PLA +-931.837
0.462TLA - -9.926
0.462BTA-3978.708
- 0.3SLX - -1031.775
0.3SLY - 1SLZ - 1.54NLA
Max Mz 31272 2103 1.15DL
30328
+ 1.2SIDL
9524.929
+ 1.4CL 1194.082
+ 1.4PLB + 1.54TLB
108.666+ 1.54BTB
16.400 393.664 4789.656
Min Mz 31272 2104 1.15DL
30332
+ 1.2SIDL
-2155.11
+ 1.4CL-1141.152
+ 1.4PLB + 1.54TLB
-98.034- 1.54BTB
-18.564 -430.994 -3537.496
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31149 2195 1.15DL
30205
+ 1.2SIDL
9990.691
+ 0.42CL 303.204
+ 0.42PLA +936.797
0.42PLB + 0.462TLA
9.050 + 0.462TLB
3688.708 + 0.462BTA
1292.768+ 0.462BTB + 0.3SLX + 0.3S
Min Fx 31397 2115 1.15DL
30457
+ 1.2SIDL
-2122.92
+ 0.3SLX-196.115
+ 0.3SLY + 1SLZ
-910.816 -10.603 -2871.328 -569.764
Max Fy 31149 2103 1.15DL
30205
+ 1.2SIDL
9670.911
+ 1.4CL 1219.045
+ 1.4PLB + 1.54TLB
87.28+ 1.54BTB
16.624 245.005 4993.962
Min Fy 31273 2104 1.15DL
30333
+ 1.2SIDL
-1411.85
+ 1.4CL-1114.263
+ 1.4PLB + 1.54TLB
-85.441- 1.54BTB
-18.530 -337.271 -3343.458
Max Fz 31273 3154 1.15DL
30333
+ 1.2SIDL
9572.033
+ 0.42CL 265.367
+ 0.42PLA +958.072
0.462TLA - 8.366
0.462BTA2784.177
- 0.3SLX - 0.3SLY
878.706
- 1SLZ - 1.54NLA
Min Fz 31273 3178 1.15DL
30329
+ 1.2SIDL
-1861.01
+ 0.42CL-201.561
+ 0.42PLB +-944.707
0.462TLB-10.926
- 0.462BTB
-3882.894
- 0.3SLX - 0.3SLY
-771.657
- 1SLZ - 1.54NLB
Max Mx 31025 2103 1.15DL
30081
+ 1.2SIDL
9365.818
+ 1.4CL 1204.132
+ 1.4PLB + 1.54TLB
79.816+ 1.54BTB
23.641 256.396 4917.482
Min Mx 31025 2104 1.15DL
30085
+ 1.2SIDL
-1276.41
+ 1.4CL-1086.618
+ 1.4PLB + 1.54TLB
-70.872- 1.54BTB
-24.059 -304.547 -3235.251
Max My 31273 2171 1.15DL
30329
+ 1.2SIDL
9740.322
+ 0.42CL 288.927
+ 0.42PLB +948.276
0.462TLB +8.302
0.462BTB3764.33
+ 0.3SLX + 0.3SLY
1232.9+ 1SLZ
Min My 31273 3154 1.15DL
30329
+ 1.2SIDL
-1845.39
+ 0.42CL-200.831
+ 0.42PLA +-928.97
0.462TLA - -9.873
0.462BTA-3957.944
- 0.3SLX - 0.3SLY
-768.791
- 1SLZ - 1.54NLA
Max Mz 31149 2103 1.15DL
30205
+ 1.2SIDL
9670.911
+ 1.4CL 1219.045
+ 1.4PLB + 1.54TLB
87.28+ 1.54BTB
16.624 245.005 4993.962
Min Mz 31273 2104 1.15DL
30333
+ 1.2SIDL
-1411.85
+ 1.4CL-1114.263
+ 1.4PLB + 1.54TLB
-85.441- 1.54BTB
-18.530 -337.271 -3343.458
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31273 1095 1DL 30329
+ 1SIDL +8157.407
0.3CL + 0.3PLA
241.181
+ 0.3PLB757.998
+ 0.33TLA + 0.33TLB
6.713 + 2980.272
0.33BTA + 0.33BTB
1030.975
+ 0.3SLX + 0.3SLY + 1SLZ
Min Fx 31397 1015 1DL 30457
+ 1SIDL +-1444.35
0.3SLX + 0.3SLY
-153.761
+ 1SLZ -725.228 -8.523 -2293.783 -443.817
Max Fy 31149 1079 1DL 30205
+ 1SIDL + 0.3CL
7512.8
+ 0.3PLA
643.95
+ 0.3PLB270.965
+ 0.33TLA + 0.33TLB
9.972 + 1003.109
0.33BTA + 0.33BTB
2663.623
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fy 31273 1086 1DL 30329
+ 1SIDL +-496.716
0.3CL + 0.3PLA
-567.39
+ 0.3PLB-267.346
+ 0.33TLA +-11.413
0.33TLB - -1186.396
0.33BTA - 0.33BTB
-2257.153
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31273 3054 1DL 30333
+ 1SIDL +7860.765
0.3CL + 0.3PLA
214.912
+ 0.33TLA763.268
- 0.33BTA 6.583
- 0.3SLX2217.657
- 0.3SLY - 1SLZ713.969
- 1.1NLA
Min Fz 31273 3078 1DL 30329
+ 1SIDL + 0.3CL
-1253.8
+ 0.3PLB
-157.149
+ 0.33TLB
-751.863
- 0.33BTB-8.702
- 0.3SLX-3103.237
- 0.3SLY - 1SLZ
-598.495
- 1.1NLB
Max Mx 31025 2031 1DL 30081
+ 1SIDL +7179.281
0.3CL + 0.3PLA
626.214
+ 0.33TLA265.631
+ 0.33BTA 13.988
+ 1SLX +967.153
0.3SLY + 0.3SLZ
2582.416
+ 1.1LLA
Min Mx 31025 3062 1DL 30081
+ 1SIDL +-479.846
0.3CL + 0.3PLB
-542.263
+ 0.33TLB
-258.938
- 0.33BTB
-14.042
- 1SLX --1088.079
0.3SLY - 0.3SLZ
-2144.427
- 1.1NLB
Max My 31273 1071 1DL 30329
+ 1SIDL +7980.971
0.3CL + 0.3PLB
231.74
+ 0.33TLB756.271
+ 0.33BTB6.537
+ 0.3SLX2994.816
+ 0.3SLY + 1SLZ
992.125
Min My 31273 3054 1DL 30329
+ 1SIDL +-1242.64
0.3CL + 0.3PLA
-156.628
+ 0.33TLA
-740.622
- 0.33BTA-7.950
- 0.3SLX-3156.844
- 0.3SLY - 1SLZ
-596.448
- 1.1NLA
Max Mz 31149 1079 1DL 30205
+ 1SIDL + 0.3CL
7512.8
+ 0.3PLA
643.95
+ 0.3PLB270.965
+ 0.33TLA + 0.33TLB
9.972 + 1003.109
0.33BTA + 0.33BTB
2663.623
+ 1SLX + 0.3SLY + 0.3SLZ
Min Mz 31273 1086 1DL 30329
+ 1SIDL +-496.716
0.3CL + 0.3PLA
-567.39
+ 0.3PLB-267.346
+ 0.33TLA +-11.413
0.33TLB - -1186.396
0.33BTA - 0.33BTB
-2257.153
- 1SLX - 0.3SLY - 0.3SLZ
c) Static LC 1001-1006
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31270 1006 1DL 30326
+ 1SIDL +4522.807
1CL + 1PLA +-38.385
1PLB + 1.1TLA
-20.795
+ 1.1TLB --2.310
1.1BTA - 1.1BTB
139.826 -203.15
Min Fx 31022 1003 1DL 30078
+ 1SIDL +3338.669
1CL + 1PLB + 54.172
1.1TLB + -26.373
1.1BTB -0.525 173.877 169.345
Max Fy 31022 1005 1DL 30078
+ 1SIDL +3728.086
1CL + 1PLA + 1PLB
82.07
+ 1.1TLA
-26.13
+ 1.1TLB +0.061
1.1BTA + 161.393
1.1BTB 269.068
Min Fy 31394 1006 1DL 30450
+ 1SIDL +4519.729
1CL + 1PLA +-41.307
1PLB + 1.1TLA
-25.029
+ 1.1TLB --2.598
1.1BTA - 1.1BTB
152.644 -217.905
Max Fz 31394 1001 1DL 30450
+ 1SIDL +3528.989
1CL + 1PLA + 44.979
1.1TLA + 1.1BTA
-8.553 -0.461 57.09 121.654
Min Fz 31022 1003 1DL 30078
+ 1SIDL +3338.669
1CL + 1PLB + 54.172
1.1TLB + -26.373
1.1BTB -0.525 173.877 169.345
Max Mx 31022 1001 1DL 30078
+ 1SIDL + 3491.33
1CL + 1PLA + 54.672
1.1TLA + 1.1BTA
-17.17 0.547 101.074 169.884
Min Mx 31394 1006 1DL 30450
+ 1SIDL +4519.729
1CL + 1PLA +-41.307
1PLB + 1.1TLA
-25.029
+ 1.1TLB --2.598
1.1BTA - 1.1BTB
152.644 -217.905
Max My 31022 1003 1DL 30078
+ 1SIDL +3338.669
1CL + 1PLB + 54.172
1.1TLB + -26.373
1.1BTB -0.525 173.877 169.345
Min My 31394 1001 1DL 30454
+ 1SIDL +3528.989
1CL + 1PLA + 44.979
1.1TLA + 1.1BTA
-8.553 -0.461 48.536 76.675
Max Mz 31022 1005 1DL 30078
+ 1SIDL +3728.086
1CL + 1PLA + 1PLB
82.07
+ 1.1TLA
-26.13
+ 1.1TLB +0.061
1.1BTA + 161.393
1.1BTB 269.068
Min Mz 31394 1006 1DL 30450
+ 1SIDL +4519.729
1CL + 1PLA +-41.307
1PLB + 1.1TLA
-25.029
+ 1.1TLB --2.598
1.1BTA - 1.1BTB
152.644 -217.905
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31147 1005 1DL 30203
+ 1SIDL + 4868.12
1CL + 1PLA +109.082
1PLB + 1.1TLA
-24.827
+ 1.1TLB +0.155
1.1BTA + 160.926
1.1BTB 496.237
Min Fx 31023 1004 1DL 30079
+ 1SIDL +3663.019
1CL + 1PLB + 22.487
1.1TLB - 1.1BTB
-22.302 -0.394 158.722 154.006
Max Fy 31023 1005 1DL 30079
+ 1SIDL +4755.201
1CL + 1PLA +110.299
1PLB + 1.1TLA
-27.557
+ 1.1TLB +0.087
1.1BTA + 172.984
1.1BTB 501.115
Min Fy 31395 1006 1DL 30451
+ 1SIDL +4134.326
1CL + 1PLA +-12.545
1PLB + 1.1TLA
-24.405
+ 1.1TLB --2.576
1.1BTA - 1.1BTB
147.556 18.526
Max Fz 31395 1001 1DL 30451
+ 1SIDL +4204.386
1CL + 1PLA + 70.342
1.1TLA + 1.1BTA
-9.545 -0.467 65.162 330.163
Min Fz 31023 1005 1DL 30079
+ 1SIDL +4755.201
1CL + 1PLA +110.299
1PLB + 1.1TLA
-27.557
+ 1.1TLB +0.087
1.1BTA + 172.984
1.1BTB 501.115
Max Mx 31023 1001 1DL 30079
+ 1SIDL +4163.458
1CL + 1PLA + 79.694
1.1TLA + -18.063
1.1BTA 0.558 108.318 375.579
Min Mx 31395 1006 1DL 30451
+ 1SIDL +4134.326
1CL + 1PLA +-12.545
1PLB + 1.1TLA
-24.405
+ 1.1TLB --2.576
1.1BTA - 1.1BTB
147.556 18.526
Max My 31023 1003 1DL 30079
+ 1SIDL +4003.445
1CL + 1PLB + 1.1TLB
78.42 + -27.258
1.1BTB -0.496 181.054 368.665
Min My 31395 1001 1DL 30455
+ 1SIDL +4204.386
1CL + 1PLA + 70.342
1.1TLA + 1.1BTA
-9.545 -0.467 55.616 259.821
Max Mz 31023 1005 1DL 30079
+ 1SIDL +4755.201
1CL + 1PLA +110.299
1PLB + 1.1TLA
-27.557
+ 1.1TLB +0.087
1.1BTA + 172.984
1.1BTB 501.115
Min Mz 31395 1006 1DL 30451
+ 1SIDL +4134.326
1CL + 1PLA +-12.545
1PLB + 1.1TLA
-24.405
+ 1.1TLB --2.576
1.1BTA - 1.1BTB
147.556 18.526
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31148 1006 1DL 30204
+ 1SIDL +4444.676
1CL + 1PLA +-34.366
1PLB + 1.1TLA
12.431
+ 1.1TLB --1.442
1.1BTA - 1.1BTB
-115.75 -184.311
Min Fx 31024 1001 1DL 30080
+ 1SIDL +3223.753
1CL + 1PLA + 55.233
1.1TLA + 1.1BTA
6.399 0.685 -92.775 174.488
Max Fy 31024 1005 1DL 30080
+ 1SIDL +3597.968
1CL + 1PLA + 82.245
1PLB + 1.1TLA
0.497
+ 1.1TLB +0.258
1.1BTA + 1.1BTB
-57.647 270.485
Min Fy 31396 1006 1DL 30452
+ 1SIDL +4302.634
1CL + 1PLA +-40.911
1PLB + 1.1TLA
3.961
+ 1.1TLB --2.653
1.1BTA - 1.1BTB
-85.637 -214.666
Max Fz 31396 1001 1DL 30452
+ 1SIDL + 3236.97
1CL + 1PLA + 45.679
1.1TLA + 1.1BTA
15.117 -0.342 -137.587 127.415
Min Fz 31024 1003 1DL 30080
+ 1SIDL +3404.859
1CL + 1PLB + 1.1TLB
53.88 + 1.1BTB
-2.718 -0.389 -20.684 166.928
Max Mx 31024 1001 1DL 30080
+ 1SIDL +3223.753
1CL + 1PLA + 55.233
1.1TLA + 1.1BTA
6.399 0.685 -92.775 174.488
Min Mx 31396 1006 1DL 30452
+ 1SIDL +4302.634
1CL + 1PLA +-40.911
1PLB + 1.1TLA
3.961
+ 1.1TLB --2.653
1.1BTA - 1.1BTB
-85.637 -214.666
Max My 31024 1003 1DL 30080
+ 1SIDL +3404.859
1CL + 1PLB + 1.1TLB
53.88 + 1.1BTB
-2.718 -0.389 -20.684 166.928
Min My 31396 1001 1DL 30452
+ 1SIDL + 3236.97
1CL + 1PLA + 45.679
1.1TLA + 1.1BTA
15.117 -0.342 -137.587 127.415
Max Mz 31024 1005 1DL 30080
+ 1SIDL +3597.968
1CL + 1PLA + 82.245
1PLB + 1.1TLA
0.497
+ 1.1TLB +0.258
1.1BTA + 1.1BTB
-57.647 270.485
Min Mz 31396 1006 1DL 30452
+ 1SIDL +4302.634
1CL + 1PLA +-40.911
1PLB + 1.1TLA
3.961
+ 1.1TLB --2.653
1.1BTA - 1.1BTB
-85.637 -214.666
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31149 1005 1DL 30205
+ 1SIDL +4736.591
1CL + 1PLA +108.874
1PLB + 1.1TLA
5.499
+ 1.1TLB +0.350
1.1BTA + 1.1BTB
-88.243 494.54
Min Fx 31397 1002 1DL 30453
+ 1SIDL +3523.032
1CL + 1PLA + 13.266
1.1TLA - 1.1BTA
10.089 -1.978 -118.673 107.303
Max Fy 31025 1005 1DL 30081
+ 1SIDL +4625.083
1CL + 1PLA +110.124
1PLB + 1.1TLA
1.924
+ 1.1TLB +0.285
1.1BTA + 1.1BTB
-69.238 499.698
Min Fy 31397 1006 1DL 30453
+ 1SIDL +3917.232
1CL + 1PLA +-12.941
1PLB + 1.1TLA
3.337
+ 1.1TLB --2.632
1.1BTA - 1.1BTB
-80.55 15.287
Max Fz 31397 1001 1DL 30453
+ 1SIDL +3912.368
1CL + 1PLA + 69.642
1.1TLA + 1.1BTA
16.109 -0.349 -145.658 324.402
Min Fz 31025 1003 1DL 30081
+ 1SIDL +4069.636
1CL + 1PLB + 78.711
1.1TLB + 1.1BTB
-1.833 -0.359 -27.861 371.082
Max Mx 31025 1001 1DL 30081
+ 1SIDL +3895.881
1CL + 1PLA + 79.133
1.1TLA + 1.1BTA
7.292 0.696 -100.018 370.976
Min Mx 31397 1006 1DL 30453
+ 1SIDL +3917.232
1CL + 1PLA +-12.941
1PLB + 1.1TLA
3.337
+ 1.1TLB --2.632
1.1BTA - 1.1BTB
-80.55 15.287
Max My 31025 1003 1DL 30081
+ 1SIDL +4069.636
1CL + 1PLB + 78.711
1.1TLB + 1.1BTB
-1.833 -0.359 -27.861 371.082
Min My 31397 1001 1DL 30453
+ 1SIDL +3912.368
1CL + 1PLA + 69.642
1.1TLA + 1.1BTA
16.109 -0.349 -145.658 324.402
Max Mz 31025 1005 1DL 30081
+ 1SIDL +4625.083
1CL + 1PLA +110.124
1PLB + 1.1TLA
1.924
+ 1.1TLB +0.285
1.1BTA + 1.1BTB
-69.238 499.698
Min Mz 31397 1006 1DL 30453
+ 1SIDL +3917.232
1CL + 1PLA +-12.941
1PLB + 1.1TLA
3.337
+ 1.1TLB --2.632
1.1BTA - 1.1BTB
-80.55 15.287
MDE Seismic
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
ODE Seismic
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
Static
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
Z = 0.80 m
P kN
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Sandeep
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = 510.276 kN.m
Design Moment, M = M1 - M2
= 25530.349 mm2 OK
P kN Z = 0.80 m
2.0 m
column Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or
(P1+P2)xZ or (P3+P4)xZ, whichever
is minimum
Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = -510.276 kN.m
Design Moment, M = M1 + M2
3.3 Moment Capacity, Stress and Crack Width Check from Oasys
Oasys Results
Cocncrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
3 2.36 OK 3 13.21 OK
3 2.36 OK 3 13.21 OK
Minima Minima
3 -0.5797 OK 3 -47.27 OK
3 -0.5797 OK 3 -47.27 OK
No. of piles n = 4
Dia of pile = 1.20 m
Size of Column = 2.00 m x 2.00 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31519 2103 1.15DL
30575
+ 1.2SIDL
10696.14
+ 1.4CL 1204.986
+ 1.4PLB + 1.54TLB
118.746+ 1.54BTB
18.186 754.235 4928.127
Min Fx 31519 2115 1.15DL
30579
+ 1.2SIDL
-1708.97
+ 0.3SLX-201.159
+ 0.3SLY + 1SLZ
-952.444 -10.532 -2716.018 -592.641
Max Fy 31519 2103 1.15DL
30575
+ 1.2SIDL
10696.14
+ 1.4CL 1204.986
+ 1.4PLB + 1.54TLB
118.746+ 1.54BTB
18.186 754.235 4928.127
Min Fy 31519 2104 1.15DL
30579
+ 1.2SIDL
-1623.4
+ 1.4CL-1106.526
+ 1.4PLB + -175.617
1.54TLB - 1.54BTB
-20.696 -294.366 -3311.915
Max Fz 31519 3154 1.15DL
30579
+ 1.2SIDL
10192.91
+ 0.42CL 267.799
+ 0.42PLA +916.413
0.462TLA - 8.882
0.462BTA2917.057
- 0.3SLX - 0.3SLY
903.63
- 1SLZ - 1.54NLA
Min Fz 31519 3178 1.15DL
30575
+ 1.2SIDL
-1435.86
+ 0.42CL-209.395
+ 0.42PLB +-968.667
0.462TLB-11.508
- 0.462BTB
-3547.731
- 0.3SLX - 0.3SLY
-820.384
- 1SLZ - 1.54NLB
Max Mx 31519 2103 1.15DL
30575
+ 1.2SIDL
10696.14
+ 1.4CL 1204.986
+ 1.4PLB + 1.54TLB
118.746+ 1.54BTB
18.186 754.235 4928.127
Min Mx 31519 2104 1.15DL
30579
+ 1.2SIDL
-1623.4
+ 1.4CL-1106.526
+ 1.4PLB + -175.617
1.54TLB - 1.54BTB
-20.696 -294.366 -3311.915
Max My 31519 3147 1.15DL
30575
+ 1.2SIDL
10431.61
+ 0.42CL 290.596
+ 0.42PLA +899.924
0.462TLA + 8.040
0.462BTA
3927.081
+ 0.3SLX +1258.742
0.3SLY + 1SLZ + 1.54NLA
Min My 31519 3154 1.15DL
30575
+ 1.2SIDL
-1479.72
+ 0.42CL-208.646
+ 0.42PLA +-944.193
0.462TLA --10.176
0.462BTA
-3659.794
- 0.3SLX - 0.3SLY
-817.266
- 1SLZ - 1.54NLA
Max Mz 31519 2103 1.15DL
30575
+ 1.2SIDL
10696.14
+ 1.4CL 1204.986
+ 1.4PLB + 1.54TLB
118.746+ 1.54BTB
18.186 754.235 4928.127
Min Mz 31519 2104 1.15DL
30579
+ 1.2SIDL
-1623.4
+ 1.4CL-1106.526
+ 1.4PLB + -175.617
1.54TLB - 1.54BTB
-20.696 -294.366 -3311.915
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31520 2104 1.15DL
30576
+ 1.2SIDL
10170.24
+ 1.4CL 1099.674
+ 1.4PLB + 1.54TLB
141.558- 1.54BTB
18.104 542.525 4402.12
Min Fx 31520 2103 1.15DL
30580
+ 1.2SIDL
-2223.06
+ 1.4CL-1057.583
+ 1.4PLB + -142.058
1.54TLB + 1.54BTB
-20.528 -512.402 -3298.257
Max Fy 31520 2103 1.15DL
30576
+ 1.2SIDL
9700.8
+ 1.4CL 1176.938
+ 1.4PLB + 1.54TLB
146.984+ 1.54BTB
19.087 523.063 4697.542
Min Fy 31520 2104 1.15DL
30580
+ 1.2SIDL
-1753.61
+ 1.4CL-1134.847
+ 1.4PLB + -147.484
1.54TLB - 1.54BTB
-21.511 -498.366 -3516.416
Max Fz 31520 3154 1.15DL
30580
+ 1.2SIDL
9899.423
+ 0.42CL 240.181
+ 0.42PLA +944.294
0.462TLA - 9.294
0.462BTA2718.694
- 0.3SLX - 0.3SLY
704.266
- 1SLZ - 1.54NLA
Min Fz 31520 3178 1.15DL
30576
+ 1.2SIDL
-1906.01
+ 0.42CL-237.145
+ 0.42PLB + -941.18
0.462TLB-11.908
- 0.462BTB
-3777.062
- 0.3SLX - 0.3SLY
-1048.568
- 1SLZ - 1.54NLB
Max Mx 31520 2103 1.15DL
30576
+ 1.2SIDL
9700.8
+ 1.4CL 1176.938
+ 1.4PLB + 1.54TLB
146.984+ 1.54BTB
19.087 523.063 4697.542
Min Mx 31520 2104 1.15DL
30580
+ 1.2SIDL
-1753.61
+ 1.4CL-1134.847
+ 1.4PLB + -147.484
1.54TLB - 1.54BTB
-21.511 -498.366 -3516.416
Max My 31520 3147 1.15DL
30576
+ 1.2SIDL
9659.323
+ 0.42CL 262.984
+ 0.42PLA + 0.462TLA
927.8 + 8.465
0.462BTA
3701.284
+ 0.3SLX +1031.801
0.3SLY + 1SLZ + 1.54NLA
Min My 31520 3154 1.15DL
30576
+ 1.2SIDL
-1865.35
+ 0.42CL-236.384
+ 0.42PLA +-916.718
0.462TLA --10.524
0.462BTA
-3889.028
- 0.3SLX - -1045.352
0.3SLY - 1SLZ - 1.54NLA
Max Mz 31520 2103 1.15DL
30576
+ 1.2SIDL
9700.8
+ 1.4CL 1176.938
+ 1.4PLB + 1.54TLB
146.984+ 1.54BTB
19.087 523.063 4697.542
Min Mz 31520 2104 1.15DL
30580
+ 1.2SIDL
-1753.61
+ 1.4CL-1134.847
+ 1.4PLB + -147.484
1.54TLB - 1.54BTB
-21.511 -498.366 -3516.416
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31521 2195 1.15DL
30577
+ 1.2SIDL
10327.11
+ 0.42CL 294.043
+ 0.42PLA +936.568
0.42PLB + 0.462TLA
9.002 + 0.462TLB
3656.471 + 0.462BTA
1251.098+ 0.462BTB + 0.3SLX + 0.3S
Min Fx 31521 2115 1.15DL
30581
+ 1.2SIDL
-1753.46
+ 0.3SLX +-193.32
0.3SLY + 1SLZ
-925.858 -10.598 -2898.84 -552.549
Max Fy 31521 2103 1.15DL
30577
+ 1.2SIDL
10101.23
+ 1.4CL 1204.079
+ 1.4PLB + 1.54TLB
144.366+ 1.54BTB
18.884 481.47 4920.753
Min Fy 31521 2104 1.15DL
30581
+ 1.2SIDL
-1355.6
+ 1.4CL-1106.098
+ 1.4PLB + -143.712
1.54TLB - 1.54BTB
-21.250 -470.567 -3308.864
Max Fz 31521 3154 1.15DL
30581
+ 1.2SIDL
9890.342
+ 0.42CL 259.254
+ 0.42PLA +943.676
0.462TLA - 9.030
0.462BTA2711.097
- 0.3SLX - 0.3SLY
858.446
- 1SLZ - 1.54NLA
Min Fz 31521 3178 1.15DL
30577
+ 1.2SIDL
-1556.92
+ 0.42CL-201.585
+ 0.42PLB +-940.076
0.462TLB-11.594
- 0.462BTB
-3772.259
- 0.3SLX - 0.3SLY
-770.424
- 1SLZ - 1.54NLB
Max Mx 31521 2103 1.15DL
30577
+ 1.2SIDL
10101.23
+ 1.4CL 1204.079
+ 1.4PLB + 1.54TLB
144.366+ 1.54BTB
18.884 481.47 4920.753
Min Mx 31521 2104 1.15DL
30581
+ 1.2SIDL
-1355.6
+ 1.4CL-1106.098
+ 1.4PLB + -143.712
1.54TLB - 1.54BTB
-21.250 -470.567 -3308.864
Max My 31521 3147 1.15DL
30577
+ 1.2SIDL
9943.603
+ 0.42CL 281.783
+ 0.42PLA +927.636
0.462TLA + 8.234
0.462BTA
3688.827
+ 0.3SLX +1200.585
0.3SLY + 1SLZ + 1.54NLA
Min My 31521 3154 1.15DL
30577
+ 1.2SIDL
-1509.22
+ 0.42CL-200.862
+ 0.42PLA +-915.605
0.462TLA --10.260
0.462BTA
-3884.297
- 0.3SLX - 0.3SLY
-767.551
- 1SLZ - 1.54NLA
Max Mz 31521 2103 1.15DL
30577
+ 1.2SIDL
10101.23
+ 1.4CL 1204.079
+ 1.4PLB + 1.54TLB
144.366+ 1.54BTB
18.884 481.47 4920.753
Min Mz 31521 2104 1.15DL
30581
+ 1.2SIDL
-1355.6
+ 1.4CL-1106.098
+ 1.4PLB + -143.712
1.54TLB - 1.54BTB
-21.250 -470.567 -3308.864
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31521 1095 1DL 30577
+ 1SIDL + 0.3CL
8444.4
+ 0.3PLA
234.699
+ 0.3PLB746.169
+ 0.33TLA + 0.33TLB
7.081 + 2910.379
0.33BTA + 0.33BTB
1002.207
+ 0.3SLX + 0.3SLY + 1SLZ
Min Fx 31521 1015 1DL 30581
+ 1SIDL +-1122.17
0.3SLX + 0.3SLY
-151.362
+ 1SLZ -737.438 -8.515 -2315.057 -429.109
Max Fy 31521 1079 1DL 30577
+ 1SIDL +7849.371
0.3CL + 0.3PLA
633.813
+ 0.3PLB295.699
+ 0.33TLA + 10.945
0.33TLB + 1089.335
0.33BTA + 0.33BTB
2615.833
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fy 31521 1086 1DL 30577
+ 1SIDL +-273.582
0.3CL + 0.3PLA
-564.234
+ 0.3PLB-289.269
+ 0.33TLA +-12.813
0.33TLB - 0.33BTA
-1233.77- 0.33BTB
-2239.514
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 31521 3054 1DL 30581
+ 1SIDL + 8132.42
0.3CL + 0.3PLA
209.85
+ 0.33TLA751.246
- 0.33BTA 7.100
- 0.3SLX2159.028
- 0.3SLY - 1SLZ697.279
- 1.1NLA
Min Fz 31521 3078 1DL 30577
+ 1SIDL +-981.779
0.3CL + 0.3PLB
-157.265
+ 0.33TLB
-747.593
- 0.33BTB-9.226
- 0.3SLX-3016.092
- 0.3SLY - 1SLZ
-597.803
- 1.1NLB
Max Mx 31521 3055 1DL 30577
+ 1SIDL +7698.088
0.3CL + 0.3PLB
625.575
+ 0.33TLB299.301
+ 0.33BTB11.236
+ 1SLX +1083.549
0.3SLY + 0.3SLZ
2582.929
+ 1.1NLB
Min Mx 31521 3062 1DL 30577
+ 1SIDL + 0.3CL
-386.75
+ 0.3PLB
-556.379
+ 0.33TLB
-297.124
- 0.33BTB
-13.090
- 1SLX --1195.048
0.3SLY - 0.3SLZ-2211.43
- 1.1NLB
Max My 31521 3047 1DL 30577
+ 1SIDL +8170.462
0.3CL + 0.3PLA
225.942
+ 0.33TLA739.789
+ 0.33BTA6.532
+ 0.3SLX2933.49
+ 0.3SLY + 1SLZ
966.127
+ 1.1NLA
Min My 31521 3054 1DL 30577
+ 1SIDL +-947.711
0.3CL + 0.3PLA
-156.749
+ 0.33TLA
-730.114
- 0.33BTA-8.273
- 0.3SLX -3096.12
- 0.3SLY - 1SLZ
-595.752
- 1.1NLA
Max Mz 31521 1079 1DL 30577
+ 1SIDL +7849.371
0.3CL + 0.3PLA
633.813
+ 0.3PLB295.699
+ 0.33TLA + 10.945
0.33TLB + 1089.335
0.33BTA + 0.33BTB
2615.833
+ 1SLX + 0.3SLY + 0.3SLZ
Min Mz 31521 1086 1DL 30577
+ 1SIDL +-273.582
0.3CL + 0.3PLA
-564.234
+ 0.3PLB-289.269
+ 0.33TLA +-12.813
0.33TLB - 0.33BTA
-1233.77- 0.33BTB
-2239.514
- 1SLX - 0.3SLY - 0.3SLZ
c) Static LC 1001-1006
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31518 1006 1DL 30574
+ 1SIDL +4920.688
1CL + 1PLA + 1PLB
-45.07+ 1.1TLA
-35.57
+ 1.1TLB --2.255
1.1BTA - 1.1BTB
203.104 -242.084
Min Fx 31518 1003 1DL 30574
+ 1SIDL +3746.686
1CL + 1PLB + 41.146
1.1TLB + -28.728
1.1BTB -0.956 181.618 99.368
Max Fy 31518 1005 1DL 30574
+ 1SIDL +4141.595
1CL + 1PLA + 65.678
1PLB + 1.1TLA
-20.403
+ 1.1TLB +-0.267
1.1BTA + 136.662
1.1BTB 182.012
Min Fy 31518 1006 1DL 30574
+ 1SIDL +4920.688
1CL + 1PLA + 1PLB
-45.07+ 1.1TLA
-35.57
+ 1.1TLB --2.255
1.1BTA - 1.1BTB
203.104 -242.084
Max Fz 31518 1001 1DL 30574
+ 1SIDL +3870.102
1CL + 1PLA + 41.314
1.1TLA + -13.586
1.1BTA -0.337 85.734 98.426
Min Fz 31518 1006 1DL 30574
+ 1SIDL +4920.688
1CL + 1PLA + 1PLB
-45.07+ 1.1TLA
-35.57
+ 1.1TLB --2.255
1.1BTA - 1.1BTB
203.104 -242.084
Max Mx 31518 1005 1DL 30574
+ 1SIDL +4141.595
1CL + 1PLA + 65.678
1PLB + 1.1TLA
-20.403
+ 1.1TLB +-0.267
1.1BTA + 136.662
1.1BTB 182.012
Min Mx 31518 1006 1DL 30574
+ 1SIDL +4920.688
1CL + 1PLA + 1PLB
-45.07+ 1.1TLA
-35.57
+ 1.1TLB --2.255
1.1BTA - 1.1BTB
203.104 -242.084
Max My 31518 1004 1DL 30574
+ 1SIDL + 4121.32
1CL + 1PLB +-14.089
1.1TLB - 1.1BTB
-33.7 -1.545 204.457 -112.033
Min My 31518 1001 1DL 30578
+ 1SIDL +3870.102
1CL + 1PLA + 41.314
1.1TLA + -13.586
1.1BTA -0.337 72.148 57.112
Max Mz 31518 1005 1DL 30574
+ 1SIDL +4141.595
1CL + 1PLA + 65.678
1PLB + 1.1TLA
-20.403
+ 1.1TLB +-0.267
1.1BTA + 136.662
1.1BTB 182.012
Min Mz 31518 1006 1DL 30574
+ 1SIDL +4920.688
1CL + 1PLA + 1PLB
-45.07+ 1.1TLA
-35.57
+ 1.1TLB --2.255
1.1BTA - 1.1BTB
203.104 -242.084
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31519 1005 1DL 30575
+ 1SIDL +5188.017
1CL + 1PLA + 97.098
1PLB + 1.1TLA
-22.016
+ 1.1TLB +-0.255
1.1BTA + 149.808
1.1BTB 440.298
Min Fx 31519 1004 1DL 30575
+ 1SIDL +4094.397
1CL + 1PLB + 1.1TLB
13.16 - 1.1BTB
-33.643 -1.503 203.987 111.953
Max Fy 31519 1005 1DL 30575
+ 1SIDL +5188.017
1CL + 1PLA + 97.098
1PLB + 1.1TLA
-22.016
+ 1.1TLB +-0.255
1.1BTA + 149.808
1.1BTB 440.298
Min Fy 31519 1006 1DL 30575
+ 1SIDL +4547.937
1CL + 1PLA +-13.463
1PLB + 1.1TLA
-34.998
+ 1.1TLB --2.215
1.1BTA - 1.1BTB
198.443 17.72
Max Fz 31519 1001 1DL 30575
+ 1SIDL +4558.407
1CL + 1PLA + 69.223
1.1TLA + -14.631
1.1BTA -0.336 94.241 327.864
Min Fz 31519 1006 1DL 30575
+ 1SIDL +4547.937
1CL + 1PLA +-13.463
1PLB + 1.1TLA
-34.998
+ 1.1TLB --2.215
1.1BTA - 1.1BTB
198.443 17.72
Max Mx 31519 1005 1DL 30575
+ 1SIDL +5188.017
1CL + 1PLA + 97.098
1PLB + 1.1TLA
-22.016
+ 1.1TLB +-0.255
1.1BTA + 149.808
1.1BTB 440.298
Min Mx 31519 1006 1DL 30575
+ 1SIDL +4547.937
1CL + 1PLA +-13.463
1PLB + 1.1TLA
-34.998
+ 1.1TLB --2.215
1.1BTA - 1.1BTB
198.443 17.72
Max My 31519 1004 1DL 30575
+ 1SIDL +4094.397
1CL + 1PLB + 1.1TLB
13.16 - 1.1BTB
-33.643 -1.503 203.987 111.953
Min My 31519 1001 1DL 30579
+ 1SIDL +4558.407
1CL + 1PLA + 69.223
1.1TLA + -14.631
1.1BTA -0.336 79.61 258.641
Max Mz 31519 1005 1DL 30575
+ 1SIDL +5188.017
1CL + 1PLA + 97.098
1PLB + 1.1TLA
-22.016
+ 1.1TLB +-0.255
1.1BTA + 149.808
1.1BTB 440.298
Min Mz 31519 1006 1DL 30575
+ 1SIDL +4547.937
1CL + 1PLA +-13.463
1PLB + 1.1TLA
-34.998
+ 1.1TLB --2.215
1.1BTA - 1.1BTB
198.443 17.72
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31520 1006 1DL 30576
+ 1SIDL +4635.832
1CL + 1PLA +-44.607
1PLB + 1.1TLA
-3.854
+ 1.1TLB --2.316
1.1BTA - 1.1BTB
-57.587 -238.309
Min Fx 31520 1001 1DL 30576
+ 1SIDL +3576.077
1CL + 1PLA + 41.983
1.1TLA + 1.1BTA
12.61 -0.223 -129.703 103.922
Max Fy 31520 1005 1DL 30576
+ 1SIDL +3992.923
1CL + 1PLA + 65.965
1PLB + 1.1TLA
9.117
+ 1.1TLB +-0.099
1.1BTA +-106.136
1.1BTB 184.356
Min Fy 31520 1006 1DL 30576
+ 1SIDL +4635.832
1CL + 1PLA +-44.607
1PLB + 1.1TLA
-3.854
+ 1.1TLB --2.316
1.1BTA - 1.1BTB
-57.587 -238.309
Max Fz 31520 1001 1DL 30576
+ 1SIDL +3576.077
1CL + 1PLA + 41.983
1.1TLA + 1.1BTA
12.61 -0.223 -129.703 103.922
Min Fz 31520 1004 1DL 30576
+ 1SIDL +4050.817
1CL + 1PLB +-14.121
1.1TLB - 1.1BTB
-6.363 -1.546 -20.285 -112.318
Max Mx 31520 1005 1DL 30576
+ 1SIDL +3992.923
1CL + 1PLA + 65.965
1PLB + 1.1TLA
9.117
+ 1.1TLB +-0.099
1.1BTA +-106.136
1.1BTB 184.356
Min Mx 31520 1006 1DL 30576
+ 1SIDL +4635.832
1CL + 1PLA +-44.607
1PLB + 1.1TLA
-3.854
+ 1.1TLB --2.316
1.1BTA - 1.1BTB
-57.587 -238.309
Max My 31520 1004 1DL 30576
+ 1SIDL +4050.817
1CL + 1PLB +-14.121
1.1TLB - 1.1BTB
-6.363 -1.546 -20.285 -112.318
Min My 31520 1001 1DL 30576
+ 1SIDL +3576.077
1CL + 1PLA + 41.983
1.1TLA + 1.1BTA
12.61 -0.223 -129.703 103.922
Max Mz 31520 1005 1DL 30576
+ 1SIDL +3992.923
1CL + 1PLA + 65.965
1PLB + 1.1TLA
9.117
+ 1.1TLB +-0.099
1.1BTA +-106.136
1.1BTB 184.356
Min Mz 31520 1006 1DL 30576
+ 1SIDL +4635.832
1CL + 1PLA +-44.607
1PLB + 1.1TLA
-3.854
+ 1.1TLB --2.316
1.1BTA - 1.1BTB
-57.587 -238.309
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31521 1005 1DL 30577
+ 1SIDL +5039.345
1CL + 1PLA + 96.812
1PLB + 1.1TLA
10.731
+ 1.1TLB +-0.087
1.1BTA +-119.281
1.1BTB 437.954
Min Fx 31521 1002 1DL 30577
+ 1SIDL +3861.255
1CL + 1PLA + 13.047
1.1TLA - 1.1BTA
3.465 -1.716 -94.648 109.714
Max Fy 31521 1005 1DL 30577
+ 1SIDL +5039.345
1CL + 1PLA + 96.812
1PLB + 1.1TLA
10.731
+ 1.1TLB +-0.087
1.1BTA +-119.281
1.1BTB 437.954
Min Fy 31521 1006 1DL 30577
+ 1SIDL +4263.082
1CL + 1PLA +-13.926
1PLB + 1.1TLA
-4.426
+ 1.1TLB --2.275
1.1BTA - 1.1BTB
-52.927 13.944
Max Fz 31521 1001 1DL 30577
+ 1SIDL +4264.383
1CL + 1PLA + 68.555
1.1TLA + 1.1BTA
13.655 -0.222 -138.21 322.369
Min Fz 31521 1004 1DL 30577
+ 1SIDL +4023.894
1CL + 1PLB + 13.191
1.1TLB - 1.1BTB
-6.42 -1.504 -19.815 112.238
Max Mx 31521 1005 1DL 30577
+ 1SIDL +5039.345
1CL + 1PLA + 96.812
1PLB + 1.1TLA
10.731
+ 1.1TLB +-0.087
1.1BTA +-119.281
1.1BTB 437.954
Min Mx 31521 1006 1DL 30577
+ 1SIDL +4263.082
1CL + 1PLA +-13.926
1PLB + 1.1TLA
-4.426
+ 1.1TLB --2.275
1.1BTA - 1.1BTB
-52.927 13.944
Max My 31521 1004 1DL 30577
+ 1SIDL +4023.894
1CL + 1PLB + 13.191
1.1TLB - 1.1BTB
-6.42 -1.504 -19.815 112.238
Min My 31521 1001 1DL 30577
+ 1SIDL +4264.383
1CL + 1PLA + 68.555
1.1TLA + 1.1BTA
13.655 -0.222 -138.21 322.369
Max Mz 31521 1005 1DL 30577
+ 1SIDL +5039.345
1CL + 1PLA + 96.812
1PLB + 1.1TLA
10.731
+ 1.1TLB +-0.087
1.1BTA +-119.281
1.1BTB 437.954
Min Mz 31521 1006 1DL 30577
+ 1SIDL +4263.082
1CL + 1PLA +-13.926
1PLB + 1.1TLA
-4.426
+ 1.1TLB --2.275
1.1BTA - 1.1BTB
-52.927 13.944
MDE Seismic
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
ODE Seismic
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
Static
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
Z = 0.80 m
P kN
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = 510.276 kN.m
Design Moment, M = M1 - M2
= 28716.101 mm2 OK
P kN Z = 0.80 m
2.0 m
column Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or
(P1+P2)xZ or (P3+P4)xZ, whichever
is minimum
Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = -510.276 kN.m
Design Moment, M = M1 + M2
= 21357.103 mm2 OK
3.3 Moment Capacity, Stress and Crack Width Check from Oasys
Oasys Results
Cocncrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
3 4.753 OK 3 24.57 OK
3 4.753 OK 3 24.57 OK
Minima Minima
3 -0.5873 OK 3 -107.4 OK
3 -0.5873 OK 3 -107.4 OK
No. of piles n = 4
Dia of pile = 1.20 m
Size of Column = 2.00 m x 2.00 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30339 2103 1.15DL
29383
+ 1.2SIDL
10293.99
+ 1.4CL 1196.044
+ 1.4PLB + 1.54TLB
183.031+ 1.54BTB
17.560 931.72 4895.634
Min Fx 30339 2104 1.15DL
29387
+ 1.2SIDL
-2333.95
+ 1.4CL-1089.362
+ 1.4PLB + -225.934
1.54TLB - 1.54BTB
-21.480 -503.826 -3269.828
Max Fy 30339 2103 1.15DL
29383
+ 1.2SIDL
10293.99
+ 1.4CL 1196.044
+ 1.4PLB + 1.54TLB
183.031+ 1.54BTB
17.560 931.72 4895.634
Min Fy 30339 2104 1.15DL
29387
+ 1.2SIDL
-2333.95
+ 1.4CL-1089.362
+ 1.4PLB + -225.934
1.54TLB - 1.54BTB
-21.480 -503.826 -3269.828
Max Fz 30339 3171 1.15DL
29383
+ 1.2SIDL
9788.785
+ 0.42CL 289.335
+ 0.42PLB +943.429
0.462TLB +9.056
0.462BTB3941.25
+ 0.3SLX + 1248.536
0.3SLY + 1SLZ + 1.54NLB
Min Fz 30339 3178 1.15DL
29383
+ 1.2SIDL
-1939.45
+ 0.42CL-203.621
+ 0.42PLB +-984.298
0.462TLB-11.860
- 0.462BTB
-3692.205
- 0.3SLX - 0.3SLY
-800.608
- 1SLZ - 1.54NLB
Max Mx 30339 2103 1.15DL
29383
+ 1.2SIDL
10293.99
+ 1.4CL 1196.044
+ 1.4PLB + 1.54TLB
183.031+ 1.54BTB
17.560 931.72 4895.634
Min Mx 30339 2104 1.15DL
29387
+ 1.2SIDL
-2333.95
+ 1.4CL-1089.362
+ 1.4PLB + -225.934
1.54TLB - 1.54BTB
-21.480 -503.826 -3269.828
Max My 30339 3147 1.15DL
29383
+ 1.2SIDL
9979.791
+ 0.42CL 289.404
+ 0.42PLA +923.846
0.462TLA + 8.014
0.462BTA4005.073
+ 0.3SLX +1250.205
0.3SLY + 1SLZ + 1.54NLA
Min My 30339 3154 1.15DL
29383
+ 1.2SIDL
-2014.32
+ 0.42CL-202.972
+ 0.42PLA +-962.734
0.462TLA --10.147
0.462BTA-3784.656
- 0.3SLX - 0.3SLY
-798.239
- 1SLZ - 1.54NLA
Max Mz 30339 2103 1.15DL
29383
+ 1.2SIDL
10293.99
+ 1.4CL 1196.044
+ 1.4PLB + 1.54TLB
183.031+ 1.54BTB
17.560 931.72 4895.634
Min Mz 30339 2104 1.15DL
29387
+ 1.2SIDL
-2333.95
+ 1.4CL-1089.362
+ 1.4PLB + -225.934
1.54TLB - 1.54BTB
-21.480 -503.826 -3269.828
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30340 2202 1.15DL
29388
+ 1.2SIDL
9481.563
+ 0.42CL 231.268
+ 0.42PLA +952.978
0.42PLB + 0.462TLA
8.388 + 0.462TLB
2839.895 - 0.462BTA
689.481- 0.462BTB - 0.3SLX - 0.3SLY
Min Fx 30340 2115 1.15DL
29388
+ 1.2SIDL
-2607.59
+ 0.3SLX-218.375
+ 0.3SLY + 1SLZ
-948.849 -11.146 -2977.555 -740.725
Max Fy 30340 2103 1.15DL
29384
+ 1.2SIDL
8853.004
+ 1.4CL 1170.858
+ 1.4PLB + 1.54TLB
206.666+ 1.54BTB
18.570 733.089 4688.673
Min Fy 30340 2104 1.15DL
29388
+ 1.2SIDL
-2133.44
+ 1.4CL-1111.826
+ 1.4PLB + -201.934
1.54TLB - 1.54BTB
-22.360 -673.229 -3432.142
Max Fz 30340 3171 1.15DL
29384
+ 1.2SIDL
9209.668
+ 0.42CL 265.208
+ 0.42PLB +967.315
0.462TLB +9.655
0.462BTB
3745.307
+ 0.3SLX + 1050.173
0.3SLY + 1SLZ + 1.54NLB
Min Fz 30340 3178 1.15DL
29384
+ 1.2SIDL
-2365.92
+ 0.42CL-227.194
+ 0.42PLB +-960.498
0.462TLB-12.367
- 0.462BTB
-3888.277
- 0.3SLX - 0.3SLY
-994.379
- 1SLZ - 1.54NLB
Max Mx 30340 2103 1.15DL
29384
+ 1.2SIDL
8853.004
+ 1.4CL 1170.858
+ 1.4PLB + 1.54TLB
206.666+ 1.54BTB
18.570 733.089 4688.673
Min Mx 30340 2104 1.15DL
29388
+ 1.2SIDL
-2133.44
+ 1.4CL-1111.826
+ 1.4PLB + -201.934
1.54TLB - 1.54BTB
-22.360 -673.229 -3432.142
Max My 30340 3147 1.15DL
29384
+ 1.2SIDL
9018.068
+ 0.42CL 265.279
+ 0.42PLA + 947.73
0.462TLA + 8.573
0.462BTA3809.147
+ 0.3SLX +1051.855
0.3SLY + 1SLZ + 1.54NLA
Min My 30340 3154 1.15DL
29384
+ 1.2SIDL
-2291.33
+ 0.42CL-226.544
+ 0.42PLA +-938.936
0.462TLA --10.609
0.462BTA-3980.719
- 0.3SLX - 0.3SLY
-991.998
- 1SLZ - 1.54NLA
Max Mz 30340 2103 1.15DL
29384
+ 1.2SIDL
8853.004
+ 1.4CL 1170.858
+ 1.4PLB + 1.54TLB
206.666+ 1.54BTB
18.570 733.089 4688.673
Min Mz 30340 2104 1.15DL
29388
+ 1.2SIDL
-2133.44
+ 1.4CL-1111.826
+ 1.4PLB + -201.934
1.54TLB - 1.54BTB
-22.360 -673.229 -3432.142
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30341 2195 1.15DL
29385
+ 1.2SIDL
9777.739
+ 0.42CL 291.318
+ 0.42PLA +961.113
0.42PLB + 0.462TLA
8.882 + 0.462TLB
3749.71 + 0.462BTA
1234.423+ 0.462BTB + 0.3SLX + 0.3S
Min Fx 30341 2104 1.15DL
29389
+ 1.2SIDL
-2268.43
+ 1.4CL-1089.345
+ 1.4PLB + -200.146
1.54TLB - 1.54BTB
-21.972 -657.609 -3269.755
Max Fy 30341 2103 1.15DL
29385
+ 1.2SIDL
9773.217
+ 1.4CL 1195.164
+ 1.4PLB + 1.54TLB
205.906+ 1.54BTB
18.221 706.554 4888.467
Min Fy 30341 2104 1.15DL
29389
+ 1.2SIDL
-2268.43
+ 1.4CL-1089.345
+ 1.4PLB + -200.146
1.54TLB - 1.54BTB
-21.972 -657.609 -3269.755
Max Fz 30341 3171 1.15DL
29385
+ 1.2SIDL
9605.008
+ 0.42CL 281.439
+ 0.42PLB +967.533
0.462TLB +9.247
0.462BTB
3736.262
+ 0.3SLX + 1197.067
0.3SLY + 1SLZ + 1.54NLB
Min Fz 30341 3178 1.15DL
29385
+ 1.2SIDL
-2136.8
+ 0.42CL-196.439
+ 0.42PLB +-959.856
0.462TLB-11.924
- 0.462BTB
-3886.223
- 0.3SLX - 0.3SLY
-754.976
- 1SLZ - 1.54NLB
Max Mx 30341 2103 1.15DL
29385
+ 1.2SIDL
9773.217
+ 1.4CL 1195.164
+ 1.4PLB + 1.54TLB
205.906+ 1.54BTB
18.221 706.554 4888.467
Min Mx 30341 2104 1.15DL
29389
+ 1.2SIDL
-2268.43
+ 1.4CL-1089.345
+ 1.4PLB + -200.146
1.54TLB - 1.54BTB
-21.972 -657.609 -3269.755
Max My 30341 3147 1.15DL
29385
+ 1.2SIDL
9411.098
+ 0.42CL 280.816
+ 0.42PLA +947.946
0.462TLA + 8.205
0.462BTA3800.125
+ 0.3SLX +1193.068
0.3SLY + 1SLZ + 1.54NLA
Min My 30341 3154 1.15DL
29385
+ 1.2SIDL
-2055.36
+ 0.42CL-195.639
+ 0.42PLA +-938.285
0.462TLA --10.210
0.462BTA-3978.736
- 0.3SLX - 0.3SLY
-751.401
- 1SLZ - 1.54NLA
Max Mz 30341 2103 1.15DL
29385
+ 1.2SIDL
9773.217
+ 1.4CL 1195.164
+ 1.4PLB + 1.54TLB
205.906+ 1.54BTB
18.221 706.554 4888.467
Min Mz 30341 2104 1.15DL
29389
+ 1.2SIDL
-2268.43
+ 1.4CL-1089.345
+ 1.4PLB + -200.146
1.54TLB - 1.54BTB
-21.972 -657.609 -3269.755
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nishant
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30341 1095 1DL 29385
+ 1SIDL +7973.774
0.3CL + 0.3PLA
232.971
+ 0.3PLB765.495
+ 0.33TLA + 0.33TLB
6.986 + 2987.293
0.33BTA + 0.33BTB990.97
+ 0.3SLX + 0.3SLY + 1SLZ
Min Fx 30341 1015 1DL 29389
+ 1SIDL +-1561.75
0.3SLX + 0.3SLY
-148.071
+ 1SLZ -755.246 -8.630 -2377.885 -424.384
Max Fy 30341 1079 1DL 29385
+ 1SIDL +7497.825
0.3CL + 0.3PLA
628.559
+ 0.3PLB +329.42
0.33TLA + 10.879
0.33TLB + 1218.337
0.33BTA + 0.33BTB
2594.464
+ 1SLX + 0.3SLY + 0.3SLZ
Min Fy 30341 1086 1DL 29385
+ 1SIDL +-905.671
0.3CL + 0.3PLA
-556.571
+ 0.3PLB-320.606
+ 0.33TLA +-12.964
0.33TLB - -1370.104
0.33BTA - 0.33BTB
-2217.651
- 1SLX - 0.3SLY - 0.3SLZ
Max Fz 30341 3071 1DL 29385
+ 1SIDL +7850.396
0.3CL + 0.3PLB
225.916
+ 0.33TLB770.081
+ 0.33BTB7.247
+ 0.3SLX2977.688
+ 0.3SLY + 1SLZ
964.288
+ 1.1NLB
Min Fz 30341 3078 1DL 29385
+ 1SIDL +-1476.88
0.3CL + 0.3PLB
-153.201
+ 0.33TLB
-763.712
- 0.33BTB-9.484
- 0.3SLX-3106.059
- 0.3SLY - 1SLZ
-586.359
- 1.1NLB
Max Mx 30341 3055 1DL 29385
+ 1SIDL +7374.447
0.3CL + 0.3PLB
621.503
+ 0.33TLB334.006
+ 0.33BTB11.140
+ 1SLX +1208.732
0.3SLY + 0.3SLZ
2567.781
+ 1.1NLB
Min Mx 30341 3062 1DL 29385
+ 1SIDL +-1000.94
0.3CL + 0.3PLB
-548.788
+ 0.33TLB
-327.637
- 0.33BTB
-13.377
- 1SLX --1337.104
0.3SLY - 0.3SLZ
-2189.853
- 1.1NLB
Max My 30341 3047 1DL 29385
+ 1SIDL +7711.888
0.3CL + 0.3PLA
225.47
+ 0.33TLA 756.09
+ 0.33BTA6.502
+ 0.3SLX 3023.303
+ 0.3SLY + 1SLZ
961.431
+ 1.1NLA
Min My 30341 3054 1DL 29385
+ 1SIDL +-1418.72
0.3CL + 0.3PLA
-152.63
+ 0.33TLA
-748.304
- 0.33BTA-8.259
- 0.3SLX -3172.14
- 0.3SLY - 1SLZ
-583.806
- 1.1NLA
Max Mz 30341 1079 1DL 29385
+ 1SIDL +7497.825
0.3CL + 0.3PLA
628.559
+ 0.3PLB +329.42
0.33TLA + 10.879
0.33TLB + 1218.337
0.33BTA + 0.33BTB
2594.464
+ 1SLX + 0.3SLY + 0.3SLZ
Min Mz 30341 1086 1DL 29385
+ 1SIDL +-905.671
0.3CL + 0.3PLA
-556.571
+ 0.3PLB-320.606
+ 0.33TLA +-12.964
0.33TLB - -1370.104
0.33BTA - 0.33BTB
-2217.651
- 1SLX - 0.3SLY - 0.3SLZ
c) Static LC 1001-1006
Pile 1
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30338 1006 1DL 29382
+ 1SIDL +4359.919
1CL + 1PLA +-36.022
1PLB + 1.1TLA
-28.561
+ 1.1TLB --2.367
1.1BTA - 1.1BTB
153.81 -188.831
Min Fx 30338 1003 1DL 29382
+ 1SIDL + 3254.64
1CL + 1PLB + 44.977
1.1TLB + -15.732
1.1BTB -1.417 107.031 124.395
Max Fy 30338 1005 1DL 29382
+ 1SIDL +3563.067
1CL + 1PLA + 66.076
1PLB + 1.1TLA
-8.185
+ 1.1TLB +-0.464
1.1BTA + 1.1BTB
66.955 190.792
Min Fy 30338 1006 1DL 29382
+ 1SIDL +4359.919
1CL + 1PLA +-36.022
1PLB + 1.1TLA
-28.561
+ 1.1TLB --2.367
1.1BTA - 1.1BTB
153.81 -188.831
Max Fz 30338 1005 1DL 29382
+ 1SIDL +3563.067
1CL + 1PLA + 66.076
1PLB + 1.1TLA
-8.185
+ 1.1TLB +-0.464
1.1BTA + 1.1BTB
66.955 190.792
Min Fz 30338 1006 1DL 29382
+ 1SIDL +4359.919
1CL + 1PLA +-36.022
1PLB + 1.1TLA
-28.561
+ 1.1TLB --2.367
1.1BTA - 1.1BTB
153.81 -188.831
Max Mx 30338 1001 1DL 29382
+ 1SIDL + 3365.63
1CL + 1PLA + 45.331
1.1TLA + -10.044
1.1BTA -0.187 60.181 124.623
Min Mx 30338 1006 1DL 29382
+ 1SIDL +4359.919
1CL + 1PLA +-36.022
1PLB + 1.1TLA
-28.561
+ 1.1TLB --2.367
1.1BTA - 1.1BTB
153.81 -188.831
Max My 30338 1006 1DL 29382
+ 1SIDL +4359.919
1CL + 1PLA +-36.022
1PLB + 1.1TLA
-28.561
+ 1.1TLB --2.367
1.1BTA - 1.1BTB
153.81 -188.831
Min My 30338 1001 1DL 29386
+ 1SIDL + 3365.63
1CL + 1PLA + 45.331
1.1TLA + -10.044
1.1BTA -0.187 50.137 79.291
Max Mz 30338 1005 1DL 29382
+ 1SIDL +3563.067
1CL + 1PLA + 66.076
1PLB + 1.1TLA
-8.185
+ 1.1TLB +-0.464
1.1BTA + 1.1BTB
66.955 190.792
Min Mz 30338 1006 1DL 29382
+ 1SIDL +4359.919
1CL + 1PLA +-36.022
1PLB + 1.1TLA
-28.561
+ 1.1TLB --2.367
1.1BTA - 1.1BTB
153.81 -188.831
Pile 2
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30339 1005 1DL 29383
+ 1SIDL +4612.376
1CL + 1PLA + 93.247
1PLB + 1.1TLA-9.834
+ 1.1TLB +-0.473
1.1BTA + 1.1BTB
80.393 414.166
Min Fx 30339 1004 1DL 29383
+ 1SIDL +3589.351
1CL + 1PLB + 17.594
1.1TLB - 1.1BTB
-22.457 -1.920 136.585 128.672
Max Fy 30339 1005 1DL 29383
+ 1SIDL +4612.376
1CL + 1PLA + 93.247
1PLB + 1.1TLA-9.834
+ 1.1TLB +-0.473
1.1BTA + 1.1BTB
80.393 414.166
Min Fy 30339 1006 1DL 29383
+ 1SIDL +3965.632
1CL + 1PLA + 1PLB
-8.76+ 1.1TLA
-27.887
+ 1.1TLB --2.336
1.1BTA - 1.1BTB
148.297 35.27
Max Fz 30339 1005 1DL 29383
+ 1SIDL +4612.376
1CL + 1PLA + 93.247
1PLB + 1.1TLA-9.834
+ 1.1TLB +-0.473
1.1BTA + 1.1BTB
80.393 414.166
Min Fz 30339 1006 1DL 29383
+ 1SIDL +3965.632
1CL + 1PLA + 1PLB
-8.76+ 1.1TLA
-27.887
+ 1.1TLB --2.336
1.1BTA - 1.1BTB
148.297 35.27
Max Mx 30339 1001 1DL 29383
+ 1SIDL +4050.981
1CL + 1PLA + 69.453
1.1TLA + -11.072
1.1BTA -0.190 68.551 322.927
Min Mx 30339 1006 1DL 29383
+ 1SIDL +3965.632
1CL + 1PLA + 1PLB
-8.76+ 1.1TLA
-27.887
+ 1.1TLB --2.336
1.1BTA - 1.1BTB
148.297 35.27
Max My 30339 1006 1DL 29383
+ 1SIDL +3965.632
1CL + 1PLA + 1PLB
-8.76+ 1.1TLA
-27.887
+ 1.1TLB --2.336
1.1BTA - 1.1BTB
148.297 35.27
Min My 30339 1001 1DL 29387
+ 1SIDL +4050.981
1CL + 1PLA + 69.453
1.1TLA + -11.072
1.1BTA -0.190 57.479 253.474
Max Mz 30339 1005 1DL 29383
+ 1SIDL +4612.376
1CL + 1PLA + 93.247
1PLB + 1.1TLA-9.834
+ 1.1TLB +-0.473
1.1BTA + 1.1BTB
80.393 414.166
Min Mz 30339 1006 1DL 29383
+ 1SIDL +3965.632
1CL + 1PLA + 1PLB
-8.76+ 1.1TLA
-27.887
+ 1.1TLB --2.336
1.1BTA - 1.1BTB
148.297 35.27
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nishant
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Pile 3
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30340 1006 1DL 29384
+ 1SIDL +3984.184
1CL + 1PLA +-35.307
1PLB + 1.1TLA-1.35
+ 1.1TLB --2.413
1.1BTA - 1.1BTB
-69.863 -182.972
Min Fx 30340 1001 1DL 29384
+ 1SIDL +3049.483
1CL + 1PLA + 46.065
1.1TLA + 1.1BTA
12.309 -0.070 -123.659 130.658
Max Fy 30340 1005 1DL 29384
+ 1SIDL +3383.634
1CL + 1PLA + 66.529
1PLB + 1.1TLA
16.877
+ 1.1TLB +-0.301
1.1BTA + 1.1BTB
-139.19 194.517
Min Fy 30340 1006 1DL 29384
+ 1SIDL +3984.184
1CL + 1PLA +-35.307
1PLB + 1.1TLA-1.35
+ 1.1TLB --2.413
1.1BTA - 1.1BTB
-69.863 -182.972
Max Fz 30340 1005 1DL 29384
+ 1SIDL +3383.634
1CL + 1PLA + 66.529
1PLB + 1.1TLA
16.877
+ 1.1TLB +-0.301
1.1BTA + 1.1BTB
-139.19 194.517
Min Fz 30340 1006 1DL 29384
+ 1SIDL +3984.184
1CL + 1PLA +-35.307
1PLB + 1.1TLA-1.35
+ 1.1TLB --2.413
1.1BTA - 1.1BTB
-69.863 -182.972
Max Mx 30340 1001 1DL 29384
+ 1SIDL +3049.483
1CL + 1PLA + 46.065
1.1TLA + 1.1BTA
12.309 -0.070 -123.659 130.658
Min Mx 30340 1006 1DL 29384
+ 1SIDL +3984.184
1CL + 1PLA +-35.307
1PLB + 1.1TLA-1.35
+ 1.1TLB --2.413
1.1BTA - 1.1BTB
-69.863 -182.972
Max My 30340 1004 1DL 29388
+ 1SIDL +3489.053
1CL + 1PLB + -5.712
1.1TLB - 1.1BTB
0.841 -1.930 -54.104 -57.21
Min My 30340 1005 1DL 29384
+ 1SIDL +3383.634
1CL + 1PLA + 66.529
1PLB + 1.1TLA
16.877
+ 1.1TLB +-0.301
1.1BTA + 1.1BTB
-139.19 194.517
Max Mz 30340 1005 1DL 29384
+ 1SIDL +3383.634
1CL + 1PLA + 66.529
1PLB + 1.1TLA
16.877
+ 1.1TLB +-0.301
1.1BTA + 1.1BTB
-139.19 194.517
Min Mz 30340 1006 1DL 29384
+ 1SIDL +3984.184
1CL + 1PLA +-35.307
1PLB + 1.1TLA-1.35
+ 1.1TLB --2.413
1.1BTA - 1.1BTB
-69.863 -182.972
Pile 4
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 30341 1005 1DL 29385
+ 1SIDL +4432.949
1CL + 1PLA + 92.795
1PLB + 1.1TLA
18.525
+ 1.1TLB +-0.309
1.1BTA +-152.627
1.1BTB 410.439
Min Fx 30341 1002 1DL 29385
+ 1SIDL +3291.409
1CL + 1PLA + 17.443
1.1TLA - 1.1BTA
-0.261 -1.528 -75.179 125.667
Max Fy 30341 1005 1DL 29385
+ 1SIDL +4432.949
1CL + 1PLA + 92.795
1PLB + 1.1TLA
18.525
+ 1.1TLB +-0.309
1.1BTA +-152.627
1.1BTB 410.439
Min Fy 30341 1006 1DL 29385
+ 1SIDL +3589.914
1CL + 1PLA + 1PLB
-9.476+ 1.1TLA
-2.024
+ 1.1TLB --2.382
1.1BTA - 1.1BTB
-64.349 29.403
Max Fz 30341 1005 1DL 29385
+ 1SIDL +4432.949
1CL + 1PLA + 92.795
1PLB + 1.1TLA
18.525
+ 1.1TLB +-0.309
1.1BTA +-152.627
1.1BTB 410.439
Min Fz 30341 1006 1DL 29385
+ 1SIDL +3589.914
1CL + 1PLA + 1PLB
-9.476+ 1.1TLA
-2.024
+ 1.1TLB --2.382
1.1BTA - 1.1BTB
-64.349 29.403
Max Mx 30341 1001 1DL 29385
+ 1SIDL +3734.845
1CL + 1PLA + 68.718
1.1TLA + 1.1BTA
13.337 -0.072 -132.028 316.886
Min Mx 30341 1006 1DL 29385
+ 1SIDL +3589.914
1CL + 1PLA + 1PLB
-9.476+ 1.1TLA
-2.024
+ 1.1TLB --2.382
1.1BTA - 1.1BTB
-64.349 29.403
Max My 30341 1004 1DL 29389
+ 1SIDL +3447.227
1CL + 1PLB + 17.373
1.1TLB - 1.1BTB0.7 -1.908 -53.081 109.5
Min My 30341 1005 1DL 29385
+ 1SIDL +4432.949
1CL + 1PLA + 92.795
1PLB + 1.1TLA
18.525
+ 1.1TLB +-0.309
1.1BTA +-152.627
1.1BTB 410.439
Max Mz 30341 1005 1DL 29385
+ 1SIDL +4432.949
1CL + 1PLA + 92.795
1PLB + 1.1TLA
18.525
+ 1.1TLB +-0.309
1.1BTA +-152.627
1.1BTB 410.439
Min Mz 30341 1006 1DL 29385
+ 1SIDL +3589.914
1CL + 1PLA + 1PLB
-9.476+ 1.1TLA
-2.024
+ 1.1TLB --2.382
1.1BTA - 1.1BTB
-64.349 29.403
MDE Seismic
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
ODE Seismic
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
Static
Load P1 P2 P3 P4 - - -
case kN kN kN kN - - -
Z = 0.80 m
P kN
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Nishant
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = 510.276 kN.m
Design Moment, M = M1 - M2
= 25530.349 mm2 OK
P kN Z = 0.80 m
2.0 m
column Z = 0.8m M1 = (P1+P3)xZ or (P2+P4)xZ or
(P1+P2)xZ or (P3+P4)xZ, whichever
is minimum
Weight per unit length due to soil and pile cap = 374.858 kN/m
Moment due to unit weight, M2 = -510.276 kN.m
Design Moment, M = M1 + M2
3.3 Moment Capacity, Stress and Crack Width Check from Oasys
Oasys Results
Cocncrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
3 2.116 OK 3 11.97 OK
3 2.116 OK 3 11.97 OK
Minima Minima
3 -0.5803 OK 3 -39.32 OK
3 -0.5803 OK 3 -39.32 OK
No. of piles n = 2
Dia of pile = 1.20 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm
= 20376 mm2 OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
2.2 Moment Capacity, Stress and Crack width check from Oasys for Longitudinal Direction
Oasys Results
Concrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 0.6122 OK 2 3.684 OK
2 0.6122 OK 2 3.684 OK
Minima Minima
2 -0.6122 OK 2 -3.684 OK
2 -0.6122 OK 2 -3.684 OK
= 33288 mm2 OK
2.4 Moment Capacity, Stress and Crack width check from Oasys for Transverse Direction
Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 0.9476 OK 2 5.678 OK
2 0.9476 OK 2 5.678 OK
Minima Minima
2 -0.9476 OK 2 -5.678 OK
2 -0.9476 OK 2 -5.678 OK
No. of piles n = 2
Dia of pile = 1.20 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm
= 17062 mm2 OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc No - Checked Reyaz
Title Design of Pile Caps Verified Sumant
2.2 Moment Capacity, Stress and Crack width check from Oasys for Longitudinal Direction
Oasys Results
Concrete stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 1.062 OK 2 6.391 OK
2 1.062 OK 2 6.391 OK
Minima Minima
2 -1.062 OK 2 -6.391 OK
2 -1.062 OK 2 -6.391 OK
= 17042 mm2 OK
2.4 Moment Capacity, Stress and Crack width check from Oasys for Transverse Direction
Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
2 0.4705 OK 2 2.831 OK
2 0.4705 OK 2 2.831 OK
Minima Minima
2 -0.4734 OK 2 -2.85 OK
2 -0.4734 OK 2 -2.85 OK
DIRECTOR OF
CONSTRUCTION
DESIGNED BY AS SHOWN 1/CWD/GNL/0010 1 T
PROJECT MANAGER
PT. AECOM INDONESIA 1-CWD-GNL-0010
SCHEDULE OF COLUMNS
NOTES
NORTH
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3001 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-SRT-3001 & 3002-1 (COLUMN LAYOUT)
SCHEDULE OF COLUMNS
NOTES
NORTH
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3002 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-SRT-3001 & 3002-1 (COLUMN LAYOUT).DWG
1 2 3 4 5 6 7 8 9
FUTURE
ESCALATOR 1
SCHEDULE OF BEAM
STRUCTURE REFERENCE DRAWING:
NOTES:-
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3003 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3003 & 3004-1 (CONCOURSE LEVEL).DWG
C
10 11 12 13 14 15 16 17
SCHEDULE OF COLUMNS
IN CONJUNCTION WITH THIS DRAWING NO. SCHEDULE OF BEAM
NOTES:-
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3004 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3003 & 3004-1 (CONCOURSE LEVEL).DWG
SCHEDULE OF COLUMNS
BEAM SCHEDULE
SCHEDULE OF COLUMNS
NORTH
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3005 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3005-1 (TRACK LEVEL)
SCHEDULE OF COLUMNS
SCHEDULE OF BEAM
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3006 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3006-1 (PLATFORM LEVEL).DWG
NOTES:-
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3007 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3007 TO 3009-1 (SECTION-4).DWG
NOTES:-
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3008 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3007 TO 3009-1 (SECTION-4).DWG
NOTES:-
NOTE:-
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3009 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3007 TO 3009-1 (SECTION-4).DWG
B ARCHITECTURAL REFERENCE DRAWING:
LEGENDS:-
NOTE:-
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3010 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3010-1 (SECTION-1, 2 & 3)
PILE GROUP LAYOUT
NOTES:-
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3016 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3016-3017-1 (PILE LAYOUT).DWG
4 4
NORTH
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3017 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3016-3017-1 (PILE LAYOUT).DWG
REINFORCEMENT DETAILS OF PILE
COLUMN / PILE GROUP BAR MARKED
MARKED
1 1
2 2
ANCHORAGE LENGTH
FOR BUNDLE BARS
3 3
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3021 3 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3021-3 (PILE REINFORCEMENT).DWG
1 1
2 2
ANCHORAGE LENGTH
** DEPTH OF PILE CAP
FOR BUNDLE BARS
NOTES:
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3022 2 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3022-2 (PILE REINFORCEMENT).DWG
LEGEND :
NOTES:
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3026 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3026-1.DWG
LONGITUDINAL
AXIS
1 1
A A
LEGEND :
NOTES:-
NOTES:
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3027 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3027-1.DWG
1 1 LONGITUDINAL
AXIS
A A
NOTES:-
LEGEND :
NOTES:
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3028 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3028-1.DWG
1 1
LEGEND :
NOTES:-
NOTES:
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3029 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3029-1.DWG
1 1
LEGEND :
NOTES:-
NOTES:
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3030 1 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3030-1.DWG