Professional Documents
Culture Documents
Relay:
Location: NG/EAST/QAISUMAH 380KV/380/A806 Nariyah North Line-2 (NEW)/
NG/EAS Siemens/79+25AR/7VK610 V4.6 - V4.7//BF1706512356
Device:
T/QAISU
MAH
380KV/3
80/A806
Setting:
Nariyah
NorthSetting: 7/9/2023
Date Setting Type: Revised In Service Since: Valid Until:
Line-2
Active: Setting Status: Ready for operation In Service by:
(NEW)/
Comment: It is issued for CSD. Auto Re-close function shall be configured for single phase faults only. After
commissioning the relay Auto-Reclose and Sync Check functions shall be Disabled.
Parameter Set
Name: Parameter Set
Parameters
Device Configuration/Device Configuration
Name Description Value [Unit] / Primary [Unit] Address
0103 Setting Group Change Disabled 0103
Option
0106 Voltage transformer 1-phase 0106
connection
0107 Current transformer NO 0107
connection
0110 Trip mode 1-/3pole 0110
0133 Auto-Reclose Function 1 AR-cycle 0133
0134 Auto-Reclose control mode with Trip and Action time 0134
0135 Synchronism and Voltage Enabled 0135
Check
0140 Trip Circuit Supervision Disabled 0140
Device/Device
Name Description Value [Unit] / Primary [Unit] Address
0610 Fault Display on LED / LCD Display Targets on every Pickup 0610
0625A Minimum hold time of 0 min 0625A
lachted LEDs
0640 Start image Default Display image 1 0640
Oscillographic Fault Records/Time Delays
Name Description Value [Unit] / Primary [Unit] Address
0402A Waveform Capture Save with Pickup 0402A
0403A Scope of Waveform Data Fault event 0403A
0410 Max. length of a Waveform 1s 0410
Capture Record
0411 Captured Waveform Prior to 0.2 s 0411
Trigger
0412 Captured Waveform after 0.1 s 0412
Event
0415 Capture Time via Binary 0.5 s 0415
Input
Power System Data 1/Breaker
Name Description Value [Unit] / Primary [Unit] Address
0239 Closing (operating) time of 0.06 s 0239
CB
Comment: Check and Confirm at Site
0240A Minimum TRIP Command 0.1 s 0240A
Duration
0241A Maximum Close Command 0.1 s 0241A
Duration
Comment: Check and Confirm at Site
0242 Dead Time for CB test- 0.1 s 0242
autoreclosure
Comment: Check and Confirm at Site
Power System Data 1/Power System
Name Description Value [Unit] / Primary [Unit] Address
0207 System Starpoint is Solid earthed 0207