Date : February, 2022

To : Mr. Julius Caesar Rivero

AVP

CHQ

From : Raul Paclibare Jr

Maintenance Superintendent

MNDD

Subject : Replace damaged parts of Tire Handler WHL-008

FAILURE ANALYSIS

EQUIPMENT DETAILS COMPONENT DETAILS


ASSET NUMBER WHL-008 COMPONENT
MAKE/MODEL DL300A ENGINE MODEL DE08TIS
SERIAL NO DWGCWLBGHC1010095 ENGINE SERIAL DEOBTIS221344L00
SMR DEFF.
DATE OF FAILURE 10-DEC-2022

BACKGROUND

A. OPERATORS REPORT

. Crack is visible on the motor housing of the equipment


. Hyd. Leaking at the tire handler
B. Action Taken

. Conduct walk around inspection


. Checked Hyd. Leak for evaluation
. Checked damaged parts for evaluation
. Conduct troubleshooting initiated by Delta Mechanic
FINDINGS

A. FINDINGS DURING INSPECTION/ TROUBLESHOOTING

. Hydraulic leaking
. Crack at motor housing

B. ANALYSIS

. Failure due to frequent use of the Equipment or due to its long term use.

RECOMMENDATIONS

. Always do equipment inspection and perform on time PMS for more efficient use and longer work
duration of the equipment.

Noted by;

______________________________

MNDD Project Manager