INDUSTRIAL TRAINING DAILY
LOGBOOK
WEEK 4

Name : Afiq Aiman b. Abdul Karim


Matric Number : B012010051
Program/Section : BEKG S1
Name of Company/ : SINLIPLAS HOLDING SDN BHD
Department
Date : 27/8/2023
Date: 2 1 /08/2023 Day: 1 6 Training Week: WEEK 4
(Please specify training information by descriptive statement, tables, sketches, figures etc.)

Time Entry Description / Remarks


08:15 a.m. Punchcard at the guard house

8.30 a.m The manager tell about his experience


after graduation, give an advice before
entering a job life and tips to improve
skills.

12.30 p.m Lunch

2.30 p.m The manager ask to check the continuity


of the PCB board for motor control.

Figure 1: PCB Board for motor control

6.00 p.m Punchout

Note: Please include attachment whenever necessary

AFIQ AIMAN

Student Signature
Date: 21/08/2023
Date: 2 2 /08/2023 Day: 1 7 Training Week: WEEK 4
(Please specify training information by descriptive statement, tables, sketches, figures etc.)

Time Entry Description / Remarks


08:30 a.m. Punchcard at the guard house.
09:00 a.m. Assist technician at site.
12.30 a.m Lunch
What is ACB?
2.00 p.m -Follow manager to the company’s -An air circuit breaker (ACB) is an
substation. The manager show us the electrical switching device designed to
ACB. protect electrical circuits from
overcurrent and short circuit faults. It
uses air as the arc-extinguishing
medium to interrupt the flow of current.
ACBs are commonly used in medium to
high voltage applications and are
capable of handling larger currents
compared to smaller circuit breakers.
They offer reliable protection and are
often used in industrial and commercial
settings.

Figure 2: Air Circuit Breaker (ACB)


-Then the manager bring us to the
transformer station in front the
company.

Figure 3: Tranformers from TNB supply


to th factory.
-The manager explain about the VCB What is the vacuum circuit breaker
use for transfomer (VCB)?
-A Vacuum Circuit Breaker (VCB) is an
electrical switching device that uses a
vacuum as the arc-quenching medium to
interrupt the flow of current in an
electrical circuit. It's designed to protect
electrical systems from overcurrent and
short circuit faults. VCBs are known for
their quick and efficient arc
extinguishing capabilities, making them
suitable for medium to high voltage
applications. They are commonly used
in power distribution networks and
substations due to their reliability and
minimal maintenance requirements.
-Then we visit the transformer station
at Plant 2

Figure 4: Vacuum Circuit Breaker


(VCB)
-Then we visit the substation for solar
panel at Plant 2

Figure 5: Substation for solar panel

Figure 6: Inveter for Solar panel

Use of inverter.
-An inverter for solar panels is a device
that converts the direct current (DC)
electricity generated by solar panels into
alternating current (AC) electricity,
which is used in most household and
industrial electrical systems. The AC
output from the inverter can be directly
fed into the grid or used to power
appliances and devices. Inverters ensure
that the electricity produced by solar
panels is compatible with the standard
AC electrical systems, enabling efficient
use and potential integration with the
6.00 p.m Punchout. existing power grid.

Note: Please include attachment whenever necessary

AFIQ AIMAN

Student Signature
Date: 22/08/2023
Date: 2 3 /08/2023 Day: 1 8 Training Week: WEEK 4
(Please specify training information by descriptive statement, tables, sketches, figures etc.)

Time Entr Description / Remarks


y
08:30 a.m. -Punchcard at the guard house.

09.00 a.m Assist the Facility Technician to


maintenance the air chiller. The
technician told that the pipe for water
flow was clogged. So we need to wash
away the sludge that is blocking the
pipe.

Figure 7: flowing pipe for air blower


chiller

12.30 p.m Lunch Figure 8: Water Tank for the chiller


1.30 p.m Assist technician at Plant 1. the roller
need to be change for the new one cause
it causes the defect for the product.

Figure 10 : roller

6.00 p.m Punchout.

Note: Please include attachment whenever necessary

AFIQ AIMAN

Student Signature
Date: 23/08/2023
Date: 2 4 /08/2023 Day:19 Training Week: WEEK 4
(Please specify training information by descriptive statement, tables, sketches, figures etc.)

Time Entry Description / Remarks


08:30 a.m Punchcard at the guard house

09:00 a.m. Follow technician to site and assist


them.

12.30 p.m Lunch

1.30 p.m Follow manager for site visit

5.00 p.m Farewell event for the manager since it


was his last day at company.

6.00 p.m Punchout

Note: Please include attachment whenever necessary

AFIQ AIMAN

Student Signature
Date: 24/08/2023
Date: 2 5 /08/2023 Day:20 Training Week: WEEK 4
(Please specify training information by descriptive statement, tables, sketches, figures etc.)

Time Entry Description / Remarks


08:30 a.m. Punchcard at the guard house.

09:00 a.m. Help technician change the rubber cover Before replace the rubber cover
for the machine roller.

Figre 11: roller before rubber cover


replacement
.
After replacement

Figure 12: roller after replacement of


the rubber cover.
12.30 p.m Lunch

2.00 p.m Help technician repairing the pneumatic


component and replacing the leaking air
pipe.

Figure 12: Solenoid Valve

3.30 p.m Follow technician to cutting department


to change the broken rubber roller that
defect the product.

Figure 13: Rubber Roller.

Note: Please include attachment whenever necessary

AFIQ AIMAN

Student Signature
Date: 25/08/2023