Professional Documents
Culture Documents
Presented by:
Developed & Managed by: Che Abdul Khalid Md. Din
Chief Operating Officer, KTPC
1
Introduction of
- Kulim Technology Park Corporation (KTPC)
- Kulim Hi-Tech Park (KHTP)
2
CORPORATE STRUCTURE OF KTPC
FEDERAL GOVERNMENT
KHTP is an initiative of the KEDAH STATE DEVELOPMENT CORPORATION
Federal Government (1992) (KSDC)
Local
Developer & Manager of KHTP Authority
KTPC Resort Development Berhad Kulim Advanced Technologies Sdn. Bhd. Kedah BioResources Corporation Sdn. Bhd. KHTP Sterilisation Services Sdn. Bhd.
(100%) (100%) (100%) (100%)
1989
The Cabinet of Malaysia approved
the establishment of high tech park
in Malaysia
Land Acquisition
1994 2006 2011 Process
Early Study Early Construction (IZP 1 & 2) (IZP 3) (IZP 4) (IZP 4A & 5)
1992 1996
Original concept by; KHTP’s Official Opening
Malaysia
26 km
45 km
KHTP DEMOGRAPHIC
Total area
IZP 4 4,736 acres / 19.16 sq. km.
Total workforce
34,000 workforce
(80% highly skilled workers, 85 expatriates)
IZP 3 IZP 1
Total investment
RM 124.9 billion (1996- 2022 (H1))
IZP 2
6 DEDICATED ZONES
4,736
acres
INDUSTRIAL ZONE PHASE 1 (IZP 1)
INDUSTRIAL ZONE PHASE 2 (IZP 2)
PROPOSED PRIVATE
122 workforce HAZMAT Facility with
HOSPITAL
50 workforce
KULIM GOLF & COUNTRY RESORT KHTP ECO PARK
KULIM TECHNO CITY PROPOSED WORKERS KULIM PERDANA KULIM GOLF & COUNTRY RESORT
/ KULIM UTAMA QUARTERS APARTMENT & BUNGALOW LOTS
4,084 units 346 units
> 594 units
SCOPE AND RESPONSIBILITIES
1 Planning and Development of Kulim Hi-Tech Park
Project Management
Corporate Services
4 Facilities And Infrastructures
Specialized Electricity ✓ Water Supply from Sg Muda &✓ Designated Local Authorities ✓ Sterilization Facilities
Provider, regulated by Designated Water Treatment for Kulim Hi Tech Park ✓ (KHTP Sterilisation Services
Suruhanjaya Tenaga Plant di Pinang Tunggal, (PBTTPHTK) Sdn. Bhd.)
Kedah
Butterworth-Kulim Expressway CCTV Command Centre, ✓ Sports and Recreation Office and Business Space
(BKE) KHTP Techno Centre Sport Complex Residential Area
Recreation Park, Parit Bunian
2
16
INVESTMENT PERFORMANCE - 2021
Approved Investments
2021
Manufacturing Sector in RM’ Billion
*Source : MIDA
Johor, Others,
7.0 27.7
Selangor,
7.5
Penang,
Pahang, 76.2
10.5
Kedah,
99.1%
Penang Kedah
Pahang Selangor
RM 66.2 billion RM 65.6 billion Johor Others
INVESTMENT PERFORMANCE – 2022 (H1)
Approved Investments
2022 (H1)
Manufacturing Sector in RM’ Billion
*Source : MIDA
Others,
6.69
Selangor,
4.88 Sabah,
7.64
Penang,
7.85
Johor,
6.66
Kedah ,
9.38
KEDAH KHTP
98%
Sabah Penang
ZONE Industrial Zone Phase 3 Industrial Zone Phase 2 Industrial Zone Phase 3 Industrial Zone Phase 4
4,386,896 sq. ft. 700,000 sq. ft. 70,000 sq. ft. 396,305.65 sq. ft.
BUILD UP AREA
(407,556 sq. m.) (65,032.12 sq. m.) (6,503.21 sq. m.) (36,817.99 sq. m.)
CONSTRUCTION
< 12 months Approx. 9 months Approx. 6.5 months Approx. 9 months
DURATION
EXPRESS APPROVAL – E10 (Export in 10 Mths)
WHAT IS E10?
E10 is the fast track process in dealing with *Source :Bernama TV, 24 Sep 2021
construction permits. The spirit behind this
initiative is effective interaction between
investor and Local Councils to facilitate
constructions works and ultimately the
production could be started in specified
timeline without delays.
06
OPERATION
TALENT POOL
KHTP WORKFORCE KHTP JOB BANK KHTP JOB FAIR
DAILY COMMUTE 2022
Date: 11 June 2022
▪ 82% within Kedah No. of Companies: 22 (MNCs)
▪ 17% from Penang Job Opportunity: 2,401 vacancy
George Town
Butterworth
2,361
30 km 20 km 10 km Kulim
3,004
TOTAL: 6,565
INDUSTRIAL TRAINING NATIONAL YOUTH SKILLS
INSTITUTE (ILP) INSTITUTE (IKBN)
3
Opportunities to MNCs
24
13 PROMOTED INDUSTRIES
38
Manufacturing
Companies
34,000
High skill workers
4 Wafer
Fabrication
Companies
OUR INVESTORS BY COUNTRY
SWEDEN [1] GERMANY [4]
• Molnlycke • Frontken • Infineon
Health Care • Beflex • Osram
LUXEMBOURG [1]
• United Caps
CHINA [2]
• Jinjing Tech
• AIC Semiconductor
USA [9]
• Intel
• First Solar JAPAN [9]
• Entegris • Fuji Electric • Toyo Memory
• Whizz Systems • Hoya • Aicello
• NextGlass • Hamadatec • Showa Denko
• Teleflex • Fujimi • Menicon
• Avery Dennison / • Ferrotec
Smartrac
• Investor R
• Ascentec Engineering
PHILIPPINES [1] SINGAPORE [2] MALAYSIA [7]
• Music Tribe • Aspen Glove • Silterra • Everbest • Sentienx
• Risen Solar Tech • BCM • Primelux / Top
North American-based [10] Europe-based [7] • Peritone • Wong Eng. Glove
Southeast Asian-based [10] East Asian-based [11]
EXPANSION RECORDS - EXISTING INVESTORS
2007 2010 2016
97.65 ac. 60.610 ac. 40 ac. 198.26 ac.
2005 2019
65.275 ac. 35 ac.
100.275 ac.
MNC
1996 2006
21.399 ac. 30 ac. 51.399 ac.
2015 2016
24.742 ac. 23.306 ac.
48.048 ac.
1997 2000
7.594 ac. 5.738 ac. 13.332 ac.
1999 2001
31.330 ac. 37.185 ac. 68.515 ac.
Local
2018 2021
19.539 ac. 5.37 ac.
24.909 ac.
1996 2021
10.039 ac. 1.49 ac. 11.529 ac.
KHTP EXPANSION (696.14 acre)
IZP 4
IZP 3 IZP 1
IZP 2
Strategic Planning to
Strengthen the Ecosystem
30
STRENGTHENING ECOSYSTEM
STRENGTHENING ACADEMIA –
INDUSTRY COLLABORATION RE (SOLAR)
Size:192 a cre
Capacity:50MW
CENTRALIZED LABOUR
KHTP SME PARK QUARTERS
RBA Compliance
33
CONTACT US @ www.khtp.com.my
Dedicated
High quality Ready Flood free
local
infrastructure utilities area
authorities
Proximity to
One Stop Good soil
industrial
Centre condition
eco-system
Thank You
www.khtp.com.my