You are on page 1of 5

May 23, 2023

TRES MARIA’S GARDEN & LANDSCAPING


FIL-AM ROAD ANGELES CITY

ATTENTION: MR. WILLY PLERAS / MR. JOMAR FEBRERO


QC HUB Project Coordinators

TOTAL COST FOR THE GROUND PREPARATION, LANDSCAPE


ARCHITECTURAL DESIGN, SUPPLY OF PLANTS, LABOR COST &
MAINTENANCE SERVICES AT QUEZON CITY SPACE HUB

Dear Sir:

Please find below our best offer for the above works:

A. SUPPLY OF THE FOLLOWING PLANTS AND LABOR:

Plant Name U/C QTY TOTAL


1 Sensation Php400.00 100.00 Php40,000.00
2 Japanese lantern Php950.00 180.00 Php171,000.00
3 Eugenia Cone Php450.00 150.00 Php67,500.00
4 Bird’s nest fern Php3,500.00 50.00 Php175,000.00
5 Prayer plant Php500.00 100.00 Php50,000.00
6 Monstera Php3,500.00 50.00 Php175,000.00
7 Creeping philodendron Php1,500.00 100.00 Php150,000.00
8 Giant birds of paradise Php500.00 200.00 Php100,000.00
9 Tricolor Php100.00 200.00 Php20,000.00
10 Palmera Php500.00 100.00 Php50,000.00
11 Garden soil Php1,000.00 160.00 Php160,000.00
12 Bonsai plants Php30,000.00 10.00 Php300,000.00
13 Frog Grass Php200.00 500.00 Php100,000.00
14 Royal Palm Tree Php12,000.00 4.00 Php48,000.00
15 Golden Betch Php7,000.00 10.00 Php70,000.00
16 Fish tail Php8,000.00 10.00 Php80,000.00
17 Bushida Php2,500.00 20.00 Php50,000.00
18 Japanese Bush Topiari Php5,000.00 20.00 Php100,000.00
19 Cono Corpus Cone Php12,000.00 20.00 Php240,000.00
20 Irish(yellow flowers) Php120.00 500.00 Php60,000.00
21 Fish Lily Php300.00 300.00 Php90,000.00
22 Varegaited Rapish Php350.00 200.00 Php70,000.00
23 Triangulares Php350.00 200.00 Php70,000.00
24 Beach Hymenocalus Php120.00 200.00 Php24,000.00
25 Falling Birds Php1,000.00 50.00 Php50,000.00
26 Selloum Php80.00 100.00 Php8,000.00
27 Pandan Php100.00 200.00 Php20,000.00
28 Boston Fern Php250.00 150.00 Php37,500.00
29 Agave (century) Php800.00 100.00 Php80,000.00
30 Thai Bamboo Php600.00 50.00 Php30,000.00
31 San Francisco Php200.00 200.00 Php40,000.00
32 Citronella Php150.00 100.00 Php15,000.00
33 Silver Wall Php60.00 200.00 Php12,000.00
34 Picara Php60.00 300.00 Php18,000.00
35 Spider Lily Php70.00 200.00 Php14,000.00
36 Forget Menot Php70.00 100.00 Php7,000.00
37 White Cogun Php80.00 200.00 Php16,000.00
38 Golden Miagos Php250.00 100.00 Php25,000.00
39 Tri Color Php200.00 200.00 Php40,000.00
40 Silver Pandakaki Php80.00 200.00 Php16,000.00
41 Golden pandakaki Php80.00 200.00 Php16,000.00
42 Green pandakaki Php50.00 200.00 Php10,000.00
43 Yuka Tree 12ft. height Php35,000.00 6.00 Php210,000.00
44 Floridana topiary 8ft. height Php45,000.00 8.00 Php360,000.00
45 Floridana Topiary 12ft. height Php80,000.00 6.00 Php480,000.00
46 Macki Cone 10ft. height Php15,000.00 6.00 Php90,000.00
47 Silver Cono Corpus Cone Php3,500.00 6.00 Php21,000.00
48 Champagne (big) Php12,000.00 5.00 Php60,000.00
49 Hawaiian Palm Php6,000.00 10.00 Php60,000.00
50 Emperiales Php4,000.00 20.00 Php80,000.00
TOTAL COST OF PLANTS Php4,276,000.00

MATERIALS FOR BENCHES AND PATHWAY


* piadra stepping stone
* white sand
* rebars, gi wire
* gravel 3/4 size
* steel matting for wall garden G.I PIPE
P 2,500,000.00
* cement
* submersible pump for waterfalls
* bricks for pathway lining
* assorted sizes of pots with design
* adobedice

OTHER MATERIALS FOR LANDSCAPING

* garden soil
* loam soil
* drift wood assorted sizes and design
garden pebbles (assorted colors) red, crystal white, orange, gray, otap, P 1,500,000.00
* green
* boulders (assorted sizes) (tiger stones)
* moss
* garden soil
* loam soil
* drift wood assorted sizes and design
garden pebbles (assorted colors) red, crystal white, orange, gray, otap, P 1,500,000.00
* green
* boulders (assorted sizes) (tiger stones)
* moss

LABOR COST

* manpower
* mobilization 3,500,000.00
P
* Landscape architect
* Perspective w/ walk through
* Equipment, tools

B. MAINTENANCE SERVICES FOR 3 YEARS


1. Personnel Requirement. 6 personnel as follows:

One (1) Manager/Designer


One (1) Driver
Four (4) pax Male/Female capable of doing multi-task gardening, planting, trimmer,
helper, etc

2. Deployment. 4 days work per week per personnel with schedule including Sundays and
Holidays. Overtime is subject for approval by Management.

3. Coverage. The following areas inclusive of its trees, plants and grass shall be covered:
 Trail from ticket booth, assembly area up to steel parking, cafeteria including
peripherals front of building and bus parking area.
 Open and semi-close spaces inside dome in 2nd floor with various animatronics
and canopies.

4. Required Equipment. Make available the following equipment and materials but not
limited to:

 Portable pump and hose for watering of plants 3x week on dry season or as
needed.
 Weed or cogon cutter as needed or per instructions from management.
 FB type utility vehicle for transport of plants, grass and the like.
 Small chainsaw with DENR license for tree maintenance. As needed.
 Essential equipment and tools such as but not limited to garden hose, ladder, dust
pan, brooms, coats and rain boots, sprayer, bareta, pikes, trimmers, shovels, rakes
and other tools to complete landscaping jobs and maintenance as instructed.

5. Scope of Work. The Head or Manager should suggest or provide a landscape design
appropriate for all new themes or subject characters portrayed in the Space Hub and
efficiently oversee all grounds landscape maintenance services for existing themes.
Material supplies like compost fertilizers, pesticides, soil, additional plants, trees and
ferns, stones, art decors and fibering are separately billed subject for instructions and
approval by management.

 Planting, watering, weeding, trimming and pruning of plants, grasses and trees.
 Cultivating, fertilizing of soil and spraying of plants with appropriate insecticides.
 Relandscaping, replanting of landscaped areas as needed.
 Install protective fences in affected landscaped areas as per artist or management’s
instructions.
 Cleaning of areas after completing works including misplaced stones, debris and
other litters.

Service may opt to add personnel on situations where grounds maintenance is needed during
special occasions or disasters, etc and to replace any equipment or tools that will be more
efficient in completing the services needed as mentioned above. Additional supply of trees,
plants, ferns, grasses, ornaments and related decors and other materials identified and
approved by Management NOT included in the above scope of works for landscaping shall be
billed separately.

Total 3 Years Maintenance Costs P4,200,000.00


Three Million Eight Hundred Thousand Pesos Only

Terms:
Payment- SUPPLY/LABOR - 50% Downpayment upon signing, balance by progress billing
SERVICE MAINTENANCE (3YRS) – 50% Downpayment, balance payable by
Quarterly billing due upon presentation of Invoice/SOA.
TAX- Exclusive of 12% VAT
Validity- No price changes on Contract within the specified period.

Prepared by: CONFORME:

Mr. German Camus _Willy Pleras/ Jomar Febrero_


On Site Project Manager Date: __________________

(NOTE: THIS SERVES AS A CONTRACT UPON SIGNING AND UPON


RECEIPT OF DOWNPAYMENT)

You might also like