You are on page 1of 6

TO : Ryohinshitsu Enterprises

ATTENTION : Mr. Noel Santos

Dear Sir,
In compliance to the request, I am pleased to submit my quotation to the following:

Structural
Qty unit Description
40 pcs Hardie flex 3/16"T 4ftx8ft
20 pcs Phenolic board 1/2" 4ftx8ft
20 pcs C-purlins 2"x3"x1.5mmT
25 pcs Metal furring 35mmx50.8mmx 1.2mmT
18 pcs G.i Sq. tube 3"x3"x4mmT
14 pcs Angle bar 1 1/2"x1/4"T
20 Kls Welding rod
2 pcs Double door flush door
1 lot Misellaneous

Masonry
Qty unit Description
1 lot Tiles 60cmx60cm (production)
1 lot Tiles 60cmx60cm (comfort room)
12 bags Cement
5 bags Tile Adhesive
100 pcs CHB
2 elf Sand
2 pcs Pvc door (90cm)
2 pcs Lavatory
1 pcs Urinal
2 pcs Toilet Bowl
1 lot Misellaneous
Painting work
Qty unit Description
4 tins Semi Gloss Latex paint
6 Bags Skim coat
12 Gallons Epoxy paint Rubberize
6 Gallons Primer
4 Gallons Enamel paint
1 lot Misellaneous

Electrical
Qty unit Description
2 pcs Switch 2 gang
5 pcs Power Outlet
1.5 box Thhn wire 2.0
1.5 box Thhn wire 3.5
50 m Flexible hose 3/4"
7 pcs Junction Box
10 pcs Utility Box
1 lot Misellaneous

Aircon Units
Qty unit Description
2 Aircon 2hp wall Mounted
Copper tube
Rubber Insulation
Freon

1 Aircon 1.5hp Wall Mounted


Copper tube
Rubber Insulation
Freon

Notes: Excess piping to 10ft will be charge 480/ft


General Requirements
Qty unit Description
1 lot Mobilization/Demobilization
1 lot Safety & PPE Requirement / Medical

NOTE: vat ex.


VALIDITY: 30 DAYS
LEAD TIME:
PAYMENT TERMS:50% DOWNPAYMENT,20%PROGRESS BILLING,20%PROGRESS BILLING
10% Billing after 6 months retention

Thank you for the opportunity of presenting this quotation and I hope this will meet your favourable reply.

Respectfully yours,
QUOTATION
No. :JJB23-0822-01

DATE : August 22, 2023

REFERENCE :

he following:

Unit Cost Subtotal


650.00 26,000.00
850.00 17,000.00
900.00 18,000.00
140.00 3,500.00
2,800.00 50,400.00
650.00 9,100.00
350.00 7,000.00
8,500.00 17,000.00
20,000.00 20,000.00
MATERIALS: PHP 188,160.00
LABOR: PhP 169,344.00
TOTAL: PhP 357,504.00

Unit Cost Subtotal


35,000.00 35,000.00
20,000.00 20,000.00
310.00 3,720.00
380.00 1,900.00
45.00 4,500.00
4,500.00 9,000.00
5,500.00 11,000.00
4,000.00 8,000.00
7,000.00 7,000.00
9,000.00 18,000.00
20,000.00 20,000.00
- -
MATERIALS: PHP 154,694.40
LABOR: PhP 139,224.96
TOTAL: PhP 293,919.36

Unit Cost Subtotal


2,900.00 11,600.00
800.00 4,800.00
1,800.00 21,600.00
1,250.00 7,500.00
1,150.00 4,600.00
20,000.00 20,000.00

MATERIALS: PHP 78,512.00


LABOR: PhP 70,660.80
TOTAL: PhP 149,172.80

Unit Cost Subtotal


145.00 290.00
145.00 725.00
3,200.00 4,800.00
4,600.00 6,900.00
35.00 1,750.00
45.00 315.00
55.00 550.00
20,000.00 20,000.00

MATERIALS: PHP 39,569.60


LABOR: PhP 35,612.64
TOTAL: PhP 75,182.24

Unit Cost Subtotal


65,000.00 130,000.00

55,000.00 55,000.00

MATERIALS: PHP 203,500.00


LABOR: PhP 81,400.00
TOTAL: PhP 284,900.00

Unit Cost Subtotal


45,000.00 45,000.00
15,000.00 15,000.00

TOTAL: PhP 60,000.00

TOTAL MATERIAL: PHP 664,436.00


TOTAL LABOR: PHP 556,242.40
Profit: PHP 136,011.00
GRAND TOTAL: PHP 1,356,689.40