Professional Documents
Culture Documents
[1109] - The Project of the Custodian of the two Holy Mosques King Abdullah Bin Abd Al - Aziz for
Creation Date: 20-SEP-23 Approval Date: 23-SEP-23 Project:
Mataf Extension
K.A.M.E PROJECT MSR # 4464 Wall Aceessories for
Project Material Supply
Discipline: Civil Description: Porcelain works - North Mukabariah (Eng.Mohammed Item Type: Department:
Request
Taha )Top Urgent
Status: APPROVED
Sr. Item Code Item Description Unit Qty Need By Date Project Name J.C. Code
Tile Adhesive ( Type: Epoxy , Pack: 11.4 kg , Product: Latapoxy 300 , Manufacturer: MATAF Extension-ZONE
1 093100-000235 Set 20 26-SEP-23 18-09-30-00 - Tiling
(Inventory) Laticrete International Inc. ) 7
Organization: IMC - Main Store Zone: General Requestor: 7014058 - ][–ﺍﺑﺮﺍﻫﻴﻢ ﺍﺣﻤﺪ ﺍﺑﺮﺍﻫﻴﻢ ﻋﺴﻴﺮﻱ
(AB+C )R2 ( 11.4 KG.( G66-103)
Ref-To S.D -1109-01-mk-GFL -SB-A-AF-108001-00
Remarks
1109-00-AR-MT-093013-U-01-02
1109-00-AR-MT-093000-H-00-01-B
Tile Accessories - Metal Edge Strip ( Type: Durondell Round Brushed , Length: 2500 mm , MATAF Extension-ZONE
2 093013-002034 pieces 2 26-SEP-23 18-09-30-00 - Tiling
(Inventory) Material: Stainless Steel (304) , Width: 8 mm ) 7
Organization: IMC - Main Store Zone: General Requestor: 7014058 - ][–ﺍﺑﺮﺍﻫﻴﻢ ﺍﺣﻤﺪ ﺍﺑﺮﺍﻫﻴﻢ ﻋﺴﻴﺮﻱ
Durondell -Dural Stainless steel ( 304 ) brushed Mat V2A (1.4571)
Ref-To S.D -1109-01-mk-GFL -SB-A-AF-108001-00
Remarks
1109-00-AR-MT-093013-U-01-02
1109-00-AR-MT-093000-H-00-01-B
Date of Print: 23 September 2023, 11:41:57 AM Page 1 of 1 User Name: [27412] MR. Sami Mohamed Mohamed
FM-PR-006 REV.1