Conduct Initial and Final PAT Preparations, Complete Site Handover to Operations
CB-000-4585 Each 1 1
of Existing Sites.
Earthing System components. Bare copper earth wire. Supply and install in
CW-016-805 trenches (trenches measured separately) and to backgrounds copper conductor. lin.m. 35 90
70 mm².
Earthing System components. Cadweld connection. Wire to wire T and X
CW-016-798 Each 20.00 20.00
connection.
CB-002-1240 Mast Lightning protection system 45m Mast. Each 1.00 1.00
CW-016-812 Earthing System components. Air Rod. Supply and install. 2000 mm long. Each 1.00 1.00
Earthing System components. Earth rods; stainless steel 19 mm dia. 2400 mm
CW-016-796 Each 2.00 2.00
long.
CW-016-802 Earthing System components. Earth rod test / inspection pit. Supply and install. Each 2.00 2.00
CW-000-1 Site preparation max 300 mm, incl. 10 cm gravel in normal soil. sq.m. 377.12 377.12
Chain link fence, 3.0 m high above ground level, complete with foundations and
CW-010-194 lin.m. 3.00 3.00
corner posts.
CW-016-799 Earthing System components. Cadweld connection. Wire to ground rod. Each 1.00 1.00
CW-016-684 Prepare surfaces and apply epoxy finishes for foundation cracks per site. sq.m 4.00 4.00
CW-040-1069 Painting of exposed concrete with Deck guard paint or equivalent (3 coats). sq.m. 4.00 4.00
Parties Contractor ( BATCO ) Tawal Acceptance Representative (Seder) Design Certificate (Nour consult)
Date 18-Mar-23
Signature
Page 1 of 3
Acceptance Documents
PAT Checklist_Colocation
RESULT
S.NO. INSPECTION ITEMS Comments
PASS N/A FAIL
1 Check Shelter /ODU model and serial number if any , Foundation , Installation
7 MDB / DCDP power connections, SCECO ( lugs, terminals, tightening,Installation , Breakers..) if any as per scope ,
Parties Implementation Contractor (BATCO) Design Office (Seder) Design Certificate ( Nourconsult )
Name Mohammad Asif Ahmed
Date 18-Mar-23
Signature
RESULT OF INSPECTION
________________________ ________________________
NAME NAME
________________________ ________________________
DATE DATE
________________________ ________________________
SIGN SIGN
Outstanding items Oils sheet
All Outstanding Items noted above to be cleared in accordance with the Contract
Parties Implementation Contractor (BATCO) Design Office (Seder) Design Certificate ( Nourconsult )
Name Mohammad Asif Ahmed
Date 18-Mar-23
Signature
All Outstanding Items noted above have been cleared in accordance with the Contract
Parties Implementation Contractor (BATCO) Design Office (Seder) Design Certificate ( Nourconsult )
Name Mohammad Asif Ahmed
Date 18-Mar-23
Signature
Page 3 of 3