You are on page 1of 3

FIS ( Filed Inspection Sheet )

Acceptance Documents -As-built Quantity

Project Name : Incident recovery 2023 ES Site Status Project Type


Site ID: MW118 PO #: 1000496 Accepted New
Region: ER WO#: WO-BATCO-IMP-MW118-1000496-Incident-3384 Rejected Colco , Upgrade
District: Northern Borders City: Northern Borders Accepted with Comments Power , Road cut
Others ( Minor Civil Work )

Initial Initial
Contract Unit Unit Designed Actual
Contract Unit Description Design Design
Code Measurement Quantity Quantity
Office Certificate
Conduct Initial and Final PAT Preparations, Complete Site Handover to Operations
CB-000-4585 Each 1 1
of Existing Sites.
Earthing System components. Bare copper earth wire. Supply and install in
CW-016-805 trenches (trenches measured separately) and to backgrounds copper conductor. lin.m. 35 90
70 mm².
Earthing System components. Cadweld connection. Wire to wire T and X
CW-016-798 Each 20.00 20.00
connection.

CW-000-9 Grounding Test. Each 1.00 1.00


Excavation and backfill of cable trenches with specified material. Depth up to 0.8
CW-001-23 lin.m. 35.00 40.00
m, in soil.

CB-002-1240 Mast Lightning protection system 45m Mast. Each 1.00 1.00

CW-016-812 Earthing System components. Air Rod. Supply and install. 2000 mm long. Each 1.00 1.00
Earthing System components. Earth rods; stainless steel 19 mm dia. 2400 mm
CW-016-796 Each 2.00 2.00
long.

CW-016-802 Earthing System components. Earth rod test / inspection pit. Supply and install. Each 2.00 2.00

CW-000-1 Site preparation max 300 mm, incl. 10 cm gravel in normal soil. sq.m. 377.12 377.12
Chain link fence, 3.0 m high above ground level, complete with foundations and
CW-010-194 lin.m. 3.00 3.00
corner posts.

CW-016-799 Earthing System components. Cadweld connection. Wire to ground rod. Each 1.00 1.00

Supply and erection Structural steelwork, materials, fabrication, anchor bolts,


CB-008-5102 welding,etc, for complete structures. Type: galvanised, quality including Rooftop ton 0.10 0.30
Building Sites (Sq.bases, tripods, wall mounts, chemical bolts, etc).

CW-016-684 Prepare surfaces and apply epoxy finishes for foundation cracks per site. sq.m 4.00 4.00

CW-040-1069 Painting of exposed concrete with Deck guard paint or equivalent (3 coats). sq.m. 4.00 4.00

Parties Contractor ( BATCO ) Tawal Acceptance Representative (Seder) Design Certificate (Nour consult)

Name Mohammad Asif Ahmed

Date 18-Mar-23

Signature

Page 1 of 3
Acceptance Documents
PAT Checklist_Colocation

SITE ID: MW118


SITE NAME: MW118
Site ID : MW315 60.0m GF
Project Name Incident recovery 2023 ES

RESULT
S.NO. INSPECTION ITEMS Comments
PASS N/A FAIL
1 Check Shelter /ODU model and serial number if any , Foundation , Installation

2 Installed mounts marked as per scope

3 Site area ( inside / out side) neat and clean

4 Inside shelter ( anti theft, Roxtec, keys, base fixation) if any

5 Far end mount If Any

6 Grounding as per Scope

7 MDB / DCDP power connections, SCECO ( lugs, terminals, tightening,Installation , Breakers..) if any as per scope ,

8 Cable tray cover, supports and fixation, Installation as per scope

9 TAG for all assets as per scope

10 Rectifiers as per cope

11 Battery if any as per scope

12 Alarm and AC connectivity

13 Power Cable Installation , Excavation

Parties Implementation Contractor (BATCO) Design Office (Seder) Design Certificate ( Nourconsult )
Name Mohammad Asif Ahmed
Date 18-Mar-23

Signature

RESULT OF INSPECTION

RAMBOLL REPRESENTATIVE CONTRACTOR REPRESENTATIVE

________________________ ________________________
NAME NAME

________________________ ________________________
DATE DATE

________________________ ________________________
SIGN SIGN
Outstanding items Oils sheet

Project Name : Incident recovery 2023 ES


Site ID: MW118 PO #: 1000496
Region: ER WO#: WO-BATCO-IMP-MW118-1000496-Incident-3384
District: Northern Borders City: Northern Borders

No Description of Outstanding Items Date Cleared and Verified By

All Outstanding Items noted above to be cleared in accordance with the Contract
Parties Implementation Contractor (BATCO) Design Office (Seder) Design Certificate ( Nourconsult )
Name Mohammad Asif Ahmed
Date 18-Mar-23

Signature

All Outstanding Items noted above have been cleared in accordance with the Contract
Parties Implementation Contractor (BATCO) Design Office (Seder) Design Certificate ( Nourconsult )
Name Mohammad Asif Ahmed
Date 18-Mar-23

Signature

Page 3 of 3