Contractor Name : Multitech

Site RFI / Completion Quality Checklist


Quality Standard for TAWAL

Site ID.:__Z49005

Site Area:_

Quality Check Date:__

Project Name:__56A0J40 Saudi Tawal STC Project 2022


h

ect 2022
Before Starting Activities
General pictures of
Complete site

Site General

MDB Breakers Pictures

Circuit breaker Overview Pictures

Excavation for Power Cable

Battery Installation
pictures

Overview picture
Rectifier Installation
pictures

Overview pictures

Site Cleaning pictures


after Completion of Site

Complete Site General View

Tags / Serial number


Pictures for all assets

ODU Door Tag / Serial


Tags / Serial number
Pictures for all assets

Battery Rack TAG

Roxtec Pictures

Picture 1
Tower Complete RT / GF Site Complete Layout

Main Breaker Capacity (AMP) STC Breaker Capacity (AMP)

Depth length with measuring tape Fixation of RGS with SCECO Wall

Power Connection lugs Power Connection heat shrink


Rectifier 4 bolts Fixation Rectifier Circuit breaker rating

ODU Finishing MDB

ODU A/C Tag / Serial Rectifier Module Tag / Serial


Battery Module Tag Rectifier Monitor Tag / Serial

Picture 2 Picture 3
ITC/Mobily Breaker Capacity (AMP) Circuit breaker Power Connection Up/Down

Installation of Tiles above Power cable Warning tape

Battery Power Cables layout


Rectifier Grounding 380 / 220 V Multimeter Picture

Power Cable RGS Cable Tray

Rectifier Cab Tag / Serial …....


MDB Tag ….....

Picture 4
If Extra Circuit Breaker Available Rating

Excavated Area Completion

Batteries Grounding
380 / 220 V Connection Picture

….....
….....
Site Information
# Item Details Comments
1 Site ID: Z49005
2 Project:
3 Region:
4 Cabinet S/N:
5 DC System S/N:
6 Rectifier Modules QTY:
7 Batteries QTY:
8 Batteries Capacity:
9 Installation Date:
Outdoor Cabinet (ODC)
# Item Description OK NOK
1 ODC fixation to the concrete base.
2 ODC free from damage and scratches.
3 Door lock free from damage and properly closing.
4 ODC Earthing bar connection with MDB grounding.
5 Cable glands sealing.
6 Air-condition connection with 48 VDC power.
7 Air-condition connection with ODC Earthing bar.
8 Air-condition Set point …........°C adjustment
9 Air-condition Self-test.
10 UK plug breaker connection with 220 VAC power.
11 LED light connection with 48 VDC power.
12 Smoke sensor connection with 48 VDC power.
13 Temperature & Humidity Sensor connection with 48 VDC power.
14 Smoke alarm connection, labeling, and testing.
15 Humidity alarm connection, labeling, and testing.
16 Temperature alarm connection, labeling, and testing.
17 Door alarm connection, labeling, and testing.
18 Air-condition alarm connection, labeling, and testing.
19 ODC & Air-condition documents keeping in holder.
DC System
# Item Description OK NOK
1 DC System installation and fixation with bolts. ok
2 ok
Main Power cable cross section …....... & Lugs …....... type as per approved design.

3 DC system Main Power Connection. ok


4 ok
Batteries strings wires cross section…....... & Lugs …....... type as per approved design.

5 Batteries connection to the DC system. ok


6 okdesign.
DC System Loads wires cross section…....... & Lugs …....... type as per approved

7 Loads connection to the DC system. ok


8 DC System Operation & testing. ok
9 Rectifier Operation & testing. ok
10 Batteries Operation & testing. ok
11 AC failure alarm connection, labeling, and testing. ok
12 Major alarm connection, labeling, and testing. ok
13 Mainor alarm connection, labeling, and testing. ok
14 Battery Discharge alarm connection, labeling, and testing. ok
15 DC Distribution Panel Installation and fixation. ok
16 Load Connection with DC Distribution Panel. ok
17 ok approved design.
DC Distribution Panel Loads wires cross section…....... & Lugs …....... type as per

Batteries Bank
# Item Description OK NOK
1 Batteries Installation and fixation. ok
2 Batteries Operation. ok
3 Batteries Charging. ok
4 Batteries Bank Discharging & Testing. ok
5 Batteries Bank Labeling. ok
C)
Comments

NOK Comments
NOK Comments
For explanation not for print
This Document for both Built To suit ( New sites ) and Colocation
/Upgrade/Modernization sites
Contractor can Add if any scope is missing or needed
For BTS can consider filling partially RFI Report then complete
before perform PAT ( consider this report when competed As
Prepat Report for BTS )