You are on page 1of 1

Adjusting and Cleaning

Clean the exposed surface of the acoustical ceiling.


Repair scratches, abrasions, voids, and other flaws in painted surfaces according to the
manufacturer’s instructions. Ceiling Works Method Statement Units that cannot be
cleaned or repaired must be replaced.

Controlling Health and Safety Risks


 Before beginning any activity, ensure that the work permit and any
accompanying documentation, such as RAMS, are signed and approved.
 Approved RAMS will be made available on-site, and job-specific dangers and
controls will be explained to all individuals participating in the job.
 Ascertain that every PPE is evaluated for job applicability, constraints,
capabilities, and compatibility with other PPE.
 Approved RAMS will be made available on-site, and job-specific dangers and
controls will be explained to all individuals participating in the job.
 Ensure that staff has received manual handling training.

 Conduct a site examination to verify proper access/egress for job operations.


Maintain a clean working environment.
 There is lone working allowed.
 Maintain adequate housekeeping in the workspace.
 Use the proper tools for the job. Do not utilize a tool or accessory for a task for
which it was not designed. Ensure that tools are inspected by a competent
person and that a record is kept. Color-coded as needed.
 When necessary, rigorously adhere to the LOTO “Lockout/Tagout” procedure.
 Only a competent/authorized individual should be entrusted to the assignment.
 Understand the emergency response procedure.
 Any route impediments must be eliminated.
 On-site emergency contact lists must be posted.

You might also like