Professional Documents
Culture Documents
Sonatrach: Indra
Sonatrach: Indra
A PROCESS AND UTILITY LINE PROCESS AND UTILITY PIPING DCS SEQUENCE CONTROL FUNCTION OR COMPUTING FUNCTION PIP LAB
A
NEW LINE (ONLY FOR EXSTING UNIT)
INSTRUMENT ELECTRICAL LEAD
NEW LINE FOR TIE-IN WITH EXSTING PLANT CONTROL VALVES AND ACTUATORS U
PANEL MOUNTED INSTRUMENT AT UTILITY CONTROL ROOM
LINE FLANGE
FLANGED END
CONTROL VALVE
RS
C REMOVABLE SPOOL
INSTRUMENT ON LOCAL PANEL C
M
AIR CYLINDER OPERATED VALVE 1ST LETTER INITIATING VARIABLE 2ND LETTER FUNCTION 3RD LETTER FUNCTION SUBSEQUENT LETTERS FUNCTIONS
Y STRAINER
A ANALYZER ALARM ALARM
T STRAINER
CONTROL VALVE WITH HANDLE B POWDER FLASHING
CONE TYPE STRAINER
D C CORROSION CONTROL, COUPON CONTROL, CLOSE CLOSE D
PRESSURE REGULATOR (SELF CONTAINED)
GATE VALVE D DIFFERENTIAL
SPACER Q TOTALIZER
F R RELEASE F
BLIND PLATE FLOW ELEMENT-ORIFICE FLANGE
S SPEED SWITCH, SAFETY SWITCH
LEGENDE:
SPECTACLE BLIND (NORMAL OPEN)
FLOW ELEMENT-V-CONE T TEMPERATURE TRANSMITTER TRANSMITTER
SPECTACLE BLIND (NORMAL CLOSE) U COMMAND, FUNCTION
OPEN DRAIN SYSTEM FLOW ELEMENT VOLUMETRIC V VIBRATION ON/OFF OR CONTROL VALVE VALVE
W THERMOWELL
RUPTURE DISC FLOW ELEMENT AREA TYPE UNCLASSIFIED VARIABLES,
G X
SEQUENCE G
Y UNCLASSIFIED VARIABLES CALCULATION, IP CONVERTOR
RO
Z POSITION POSITION, DISCREPANCY DEVIATION
FLOW ELEMENT (PITOT TUBE OR ANNULAR)
RESTRICTION ORIFICE BZSC / EZSC / FZSC / HZSC / XZSC LIMIT SWITCH (CLOSE) HS / EZS / HDS / HRS / HZS HAND SWITCH
FLOW ELEMENT TURBINE BZSO / EZSO / FZSO / XZSO LIMIT SWITCH (OPEN) LZA / PZA / IZA DEVIATION ALARM
BZC / EZC / HZC / XZC VALVE POSITION (CLOSE)
T DRAIN TRAP
BZO / EZO / HZO / XZO VALVE POSITION (OPEN)
C CORIOLIS TYPE
H H
LINE TRACE (ELECTRIC HEATER)
For Inf For Approval For Const As Built
ULTRASONIC TYPE
PO
PURGE CONNECTION
PIPING ROUTE SYMBOLS 4 20-JAN-21 AS BUILT R.V H.T T.I
METER RUN 3 21-DEC-18 AS BUILT R.V H.T T.I
2 25-MAY-18 FOR CONSTRUCTION S.A H.T T.I
1 28-DEC-17 FOR CONSTRUCTION WITHOUT HOLD M.K T.N T.I
BREATHER VALVE SYMBOL ON PIPE DEFINITION EXAMPLE OF ACTUAL PIPING LAYOUT
0 08-SEP-17 FOR CONSTRUCTION WITH HOLD M.K T.N T.I
NO LIQUID POCKET IN THE LINE. LINE MAY B 26-MAY-17 FOR APPROVAL M.K T.N T.I
I SC TIE-IN POINT NO POCKET CONTAIN GAS POCKETS. A
I
B REV. DATE ISSUE PURPOSE PREP'D CHK'D APP'D
SAMPLING CONNECTION NOTE 1
FLOW A → B
F FRAME ARRESTOR Q
TP-XXXZ
Q : AREA CODE
NO VAPOR POCKET
NO VAPOR POCKET IN THE LINE. LINE MAY A B SONATRACH
CONTAIN LIQUID POCKETS.
FLEXIBLE HOSE
SOUTH : 3002 FLOW A → B DIVISION PRODUCTION
NORTH : 3003
SIZE
TITLE:
ELEVATION DOWNSTREAM NEVER EXCEED INLET A
CP
GRAVITY FLOW ELEVATION, LINE MAY CONTAIN GAS AND / OR
LIQUID POCKETS. B PIPING AND INSTRUMENT DIAGRAM
CORROSION PROBE
FLOW A → B
STANDARD SYMBOLS-1
CONTRACTOR'S DOCUMENT NO.
A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
N
I ND R
- 2 0 21
21-JABUILTPRINTED
AS ED WHEN L 1/1
TROL
NCON