GENERAL SYMBOLS INSTRUMENT LINE SYMBOLS INSTRUMENT FUNCTIONS NOTE 2 NOTES:


1. DETAIL OF CONNECTION

A PROCESS AND UTILITY LINE PROCESS AND UTILITY PIPING DCS SEQUENCE CONTROL FUNCTION OR COMPUTING FUNCTION PIP LAB
A
NEW LINE (ONLY FOR EXSTING UNIT)
INSTRUMENT ELECTRICAL LEAD

CONNECTION OF DRAWING UCP 2oo3 TWO OUT OF THREE VOTING


PNEUMATIC LINES (GAS OR AIR) MALE NPT THREAD REDUCER & QUICK CONNECTOR
P-ESD PRESSURIZED EMERGENCY SHUTDOWN
2. REFER TO PROJECT NUMBERING PROCEDURE (S-3000-1141-001).
BI-DIRECTION CONNECTION OF DRAWING
INSTRUMENT CAPILLARY TUBING LOCALLY MOUNTED FUNCTION D-ESD DEPRESSURIZED EMERGENCY SHUTDOWN

FLOW DIRECTION DCS SIGNAL


B B
LIMIT OF STEP2
PANEL MOUNTED INSTRUMENT AT MAIN CONTROL ROOM
LIMIT OF VENDOR PACKAGE

NEW LINE FOR TIE-IN WITH EXSTING PLANT CONTROL VALVES AND ACTUATORS U
PANEL MOUNTED INSTRUMENT AT UTILITY CONTROL ROOM
LINE FLANGE

FLANGED END
CONTROL VALVE
RS
C REMOVABLE SPOOL
INSTRUMENT ON LOCAL PANEL C
M

CAPPED END MOTOR OPERATED VALVE

REDUCER LETTER POSITION OF FUNCTION

AIR CYLINDER OPERATED VALVE 1ST LETTER INITIATING VARIABLE 2ND LETTER FUNCTION 3RD LETTER FUNCTION SUBSEQUENT LETTERS FUNCTIONS
Y STRAINER
A ANALYZER ALARM ALARM
T STRAINER
CONTROL VALVE WITH HANDLE B POWDER FLASHING
CONE TYPE STRAINER
D C CORROSION CONTROL, COUPON CONTROL, CLOSE CLOSE D
PRESSURE REGULATOR (SELF CONTAINED)
GATE VALVE D DIFFERENTIAL

NEEDLE VALVE E ELECTRIC ELEMENT


PRESSURE REDUCING REGULATOR
(EXTERNAL PRESSURE TAP) F FLOW FAULT
GLOBE VALVE
G INSTRUMENT WITH LOCAL
FAILURE ACTION GAUGE
CHECK VALVE F INDICATION, GAUGE
ATTENTES:
H HORN, HAND HIGH HIGH
BALL VALVE
E I CURRENT (ELECTRICAL) INDICATION INDICATION E
ANGLE VALVE SOLENOID OPERATED VALVE
L LEVEL LAMP LOW LOW
THREE WAY VALVE M MANUAL

SAFETY VALVE (CONVENTIONAL OR O OPEN OPEN


PILOT OPERATED FLOW INSTRUMENT P PRESSURE PROBE

SPACER Q TOTALIZER
F R RELEASE F
BLIND PLATE FLOW ELEMENT-ORIFICE FLANGE
S SPEED SWITCH, SAFETY SWITCH
LEGENDE:
SPECTACLE BLIND (NORMAL OPEN)
FLOW ELEMENT-V-CONE T TEMPERATURE TRANSMITTER TRANSMITTER
SPECTACLE BLIND (NORMAL CLOSE) U COMMAND, FUNCTION

OPEN DRAIN SYSTEM FLOW ELEMENT VOLUMETRIC V VIBRATION ON/OFF OR CONTROL VALVE VALVE
W THERMOWELL
RUPTURE DISC FLOW ELEMENT AREA TYPE UNCLASSIFIED VARIABLES,
G X
SEQUENCE G
Y UNCLASSIFIED VARIABLES CALCULATION, IP CONVERTOR
RO
Z POSITION POSITION, DISCREPANCY DEVIATION
FLOW ELEMENT (PITOT TUBE OR ANNULAR)
RESTRICTION ORIFICE BZSC / EZSC / FZSC / HZSC / XZSC LIMIT SWITCH (CLOSE) HS / EZS / HDS / HRS / HZS HAND SWITCH
FLOW ELEMENT TURBINE BZSO / EZSO / FZSO / XZSO LIMIT SWITCH (OPEN) LZA / PZA / IZA DEVIATION ALARM
BZC / EZC / HZC / XZC VALVE POSITION (CLOSE)
T DRAIN TRAP
BZO / EZO / HZO / XZO VALVE POSITION (OPEN)
C CORIOLIS TYPE
H H
LINE TRACE (ELECTRIC HEATER)
For Inf For Approval For Const As Built
ULTRASONIC TYPE
PO
PURGE CONNECTION
PIPING ROUTE SYMBOLS 4 20-JAN-21 AS BUILT R.V H.T T.I
METER RUN 3 21-DEC-18 AS BUILT R.V H.T T.I
2 25-MAY-18 FOR CONSTRUCTION S.A H.T T.I
1 28-DEC-17 FOR CONSTRUCTION WITHOUT HOLD M.K T.N T.I
BREATHER VALVE SYMBOL ON PIPE DEFINITION EXAMPLE OF ACTUAL PIPING LAYOUT
0 08-SEP-17 FOR CONSTRUCTION WITH HOLD M.K T.N T.I
NO LIQUID POCKET IN THE LINE. LINE MAY B 26-MAY-17 FOR APPROVAL M.K T.N T.I
I SC TIE-IN POINT NO POCKET CONTAIN GAS POCKETS. A
I
B REV. DATE ISSUE PURPOSE PREP'D CHK'D APP'D
SAMPLING CONNECTION NOTE 1
FLOW A → B

F FRAME ARRESTOR Q
TP-XXXZ
Q : AREA CODE
NO VAPOR POCKET
NO VAPOR POCKET IN THE LINE. LINE MAY A B SONATRACH
CONTAIN LIQUID POCKETS.
FLEXIBLE HOSE
SOUTH : 3002 FLOW A → B DIVISION PRODUCTION
NORTH : 3003
SIZE

VENT COVER CENTRAL : 3009


FEER DRAIN
NO LIQUID POCKET AND NO GAS POCKET IN THE LINE. A OWNER: SONATRACH
J HOSE CONNECTION XXX : SEQUENTIAL NUMBER (WITH SHOWING SCOPE B J
Z : SUFFIX BY ARROW) PROJECT: HASSI R'MEL BOOSTING PHASE III
FLOW A → B
BIRD SCREEN
D-3000-1225-101

TITLE:
ELEVATION DOWNSTREAM NEVER EXCEED INLET A
CP
GRAVITY FLOW ELEVATION, LINE MAY CONTAIN GAS AND / OR
LIQUID POCKETS. B PIPING AND INSTRUMENT DIAGRAM
CORROSION PROBE
FLOW A → B
STANDARD SYMBOLS-1
CONTRACTOR'S DOCUMENT NO.

DIAPHRAGM SEAL GENERAL


SLOPE 1:XXX A
ELEVATION CHANGES CONTINUOUSLY DOWNWARD ONLY.
K (WITH TRIANGLE AND NO POCKETS ARE PERMITTED. SPECIFIC SLOPES REQUIRED JOB CODE CONTRACTOR'S DOCUMENT NO. SIZE K
ARE SHOWN BY SYMBOL.
SILENCER
SLOPE 1:XXX) 0-7577-20 D-3000-1225-101
FLOW A → B B
PCWBS OWNER'S DOCUMENT NO. SCALE
NONE NONE

A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
N
I ND R
- 2 0 21
21-JABUILTPRINTED
AS ED WHEN L 1/1
TROL