You are on page 1of 3

NGHI SON REFINERY AND

PETROCHEMICAL COMPLEX PROJECT


Title: Shop Drawing of Concrete work for Contractor Doc. No.
Rev.0
C400 VALVE PIT VV3120-006-A-1363

Shop Drawing of Concrete work for


C400 VALVE PIT

DOCUMENT CLASS: X

Issue Purpose For Approval

Rev Date Page Description Prep' Chk'd App'd


d

0 01/Jun/2016 All For Approval DVH LCA LTS

Operation Centre JOB Code: Operation Centre Doc. No.:


Responsible Company: Prepared by: Checked by: Approved by:
PVC Dau Van Hieu Le Cao Anh Le Thanh Son

Page 1 of 8
NGHI SON REFINERY AND
PETROCHEMICAL COMPLEX PROJECT
Title: Shop Drawing of Concrete work for Contractor Doc. No.
Rev. 0
C400 VALVE PIT VV3120-006-A-1363

1. REFERENCES:
Item/Project Revision
N Remar
o Drawing No Drawing name Re Date k
v
1 D-C40-1316-1603G UNIT 190 EFFLUENT 14 30/Oct/15
TREATMENT PLANT DRAINAGE
PLAN (1/10)
2 D-C40-1316-1604G UNIT 190 EFFLUENT 9 30/Oct/15
TREATMENT PLANT DRAINAGE
PLAN (2/10)
3 D-C40-1316-1605G UNIT 190 EFFLUENT 7 30/Oct/15
TREATMENT PLANT DRAINAGE
PLAN (3/10)
4 D-C40-1316-1606G UNIT 190 EFFLUENT 7 30/Oct/15
TREATMENT PLANT DRAINAGE
PLAN (4/10)
5 D-C40-1316-1607G UNIT 190 EFFLUENT 6 30/Oct/15
TREATMENT PLANT DRAINAGE
PLAN (5/10)
6 D-C40-1316-1608G UNIT 190 EFFLUENT 6 16/Jun/15
TREATMENT PLANT DRAINAGE
PLAN (6/10)
7 D-C40-1316-1609G UNIT 190 EFFLUENT 10 30/Oct/15
TREATMENT PLANT DRAINAGE
PLAN (7/10)
8 D-C40-1316-1610G UNIT 190 EFFLUENT 9 30/Oct/15
TREATMENT PLANT DRAINAGE
PLAN (8/10)
9 D-C40-1316-1611G UNIT 190 EFFLUENT 11 30/Oct/15
TREATMENT PLANT DRAINAGE
PLAN (9/10)
10 D-C40-1316-1612G UNIT 190 EFFLUENT 7 30/Oct/15
TREATMENT PLANT DRAINAGE
PLAN (10/10)
2 D-000-1316-1713G STANDARD AOC CATCH BASIN 1 16/Sep/
15

2. LIST OF SHOP DRAWING:


Item/Project Revision
N Remar
o Drawing No Drawing name Re Date k
v
1 C400B-VALVE PIT-01 LOCATION PLAN 1 07/May/
2016
2 C400B-VALVE PIT-02 DESIGN DRAWING 1 07/May/

Page 2 of 8
NGHI SON REFINERY AND
PETROCHEMICAL COMPLEX PROJECT
Title: Shop Drawing of Concrete work for Contractor Doc. No.
Rev. 0
C400 VALVE PIT VV3120-006-A-1363

2016
3 C400B-VALVE PIT-03 SECTION & REBAR 1 07/May/
ARRANGEMENT SP- 2016
001,002,003,012,013
4 C400B-VALVE PIT-04 SECTION & BAR BENDING 1 07/May/
SCHEDULE 2016
5 C400B-VALVE PIT-05 SECTION & REBAR 1 07/May/
ARRANGEMENT SP-004 2016
6 C400B-VALVE PIT-06 SECTION & BAR BENDING 1 07/May/
SCHEDULE 2016

Page 3 of 8

You might also like