SPECIALIST IN :- MACHINE UNLOAD SHIFT & INSTALL , SS/MS PIPE LINE, LT ELECTRICAL & ALL TYPES OF FABRICATION WORK

Regd Add:-BALAJI VISHWA BLD, GAT NO-509/550, ‘H’ WING, 4TH FLOOR, FLAT NO 14, PALSHI RD, SHIRWAL, TAL-KHANDALA,
DIST- SATARA, PIN-412801, E-mail- uniquees4344@gmail.com, Mob- 08411880808, 08605743441
QUOTATION
REF:- QTN/Trimurti/0923/01 DATE:- 23-Sep-23
Kind Attend:-Mr. Raut Sir
Subject-Offer for Needle machine shifting work

Dear Sir/ Madam,


As per our conversation in your company we are pleased to quote our lowest rates for item as mentioned below

Labour Charges
Sr Particulars Scope of work QTY Uom Rate Amount
NEEDLE MACHINE SHIFTING WORK
Dismenting & Removing of Old Needle Machine with its assembly
Parts from theold place & shift to the other location considering
Engineering and Supervision, and labour Charge, Total Weight-010
Ton ( if forklift required that will be Provided by Trimurti )

Shifting new Needle Machine with its assembly Parts from out side
to in side final location considering Engineering and Supervision,
and labour Charge, Total Weight-08 nos ( if forklift required that will
Labor Charges for Needle
be Provided by Trimurti )
1 shifting work as per your 18 Ton 2500 45000
requirement Tools and Tackles like Hand tools,Shifting trollyes, Jacks,
Tommeys, Wooden Blocks,Lifting Belts, D-cycls, Wire rope
,including Carting/ Transport charges
We are not considered Machine Installation work in this offer
We are not considered any type of Electrical or Machanical Utilty
work in this offer
We are not considered any type of Machine alignment work in this
offer
Not Considering of MHE ( Crane ) for shifting of machine
SAC CODE-998732 Net Amount Without Tax 45000

WORK TERMS
1 Any Forklift are not considered in this offer
2 Any reshifting of the M/c due to any changes in Layout will be at Extra cost.
3 Work starting intimation prior to 5 days pre-notice.
4 The Above Rates Covers Contractor Employees ESIC, Lunch, travel, as applicable.
5 NO Material Considered in this Offer except above consumables. If any material required will be provided by Customer
6 We are not considered any type of modification in this offer.
7 If Requires any types of Modification we will be charge extra as applicable
The Workplace where machine to be shifted and the gangway through which M/c will be shifted,-Same to be Made free
8
and cleaned by the Customer before Shifting the M/c to this Place.
9 The customer have to provide ,Machine Shut- Down, work permit, etc

COMMERCIAL TERMS
1 Taxes- 18% Extra as Govt Rule applicable on your Account
2 Payment Terms- 50% advance , 50 % after work completion
3 Qtn validity- 15days.

M/s UNIQUE ENGINEERING SERVICES


Mr. Revan Karande / Mr. Vishal Patil
08411880808 / 08605743441