INSPECTION REPORT
PARTS EMBEDDED IN CONCRETE
1/1
LILAMA10 JOINT STOCK COMPANNY
NAMPHAK HYDROPOWER PROJECT
Attachment:
D. Project Manager
1/1
CONTENTS
1. Inspection Material.
1/1
1. INSPECTION MATERIAL.
1/1
INSPECTION REQUEST
To: NPC/TETH Form No: NP-SD5-QC-IR-001
No IR : NP-SD5-QC-IR-001- 1
Date: 04/08/2023
Type of work:
Item for
Address inspection Date and Time Remarks
Inspection
1, NP-SD5-DWG-DED-NA-GS-102-
HME-0001
2, NP-SD5-DWG-DED-NA-GS-102-
HME-0005
Steel structure and equipment factory in
3, NP-SD5-DWG-DED-NA-PI-62-
Ha nam (Thanh Chau ward, Phu ly City, Embeded 05/08/2023 8h30
HME-0001
Ha Nam province)
4, NP-SD5-DWG-DED-NA-BO-51-
HME-0001
5, NP-SD5-DWG-DED-NA-PI-62-
HME-0004
Attachments: ………………………………………………………………………………………………………………
Requested by:
Name: ........................................................................... Signature: .................................. ……............. Date: …………
Reference documents:...….....................................................................…………………………………………………
Note: PARTS EMBEDDED IN CONCRETE
Name: Name:
Date: Date:
1/1
MATERIAL INSPECTION
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province)Date:
Item: GS embedded parts No IR: NP-SD5-QC-MT-02- 1
Subcontractor: Lilama10 joint stock companny Form No: NP-SD5-QC-MT-02
Name: Name:
Date: Date:
1/1
Report No.: NP-SD5-QC-MT-04- 1
POSITIVE MATERIAL IDENTIFICATION REPORT
Date:
Document No: Form No: NP-SD5-QC-MT-04 Page: 1 of 1
Project : NAM PHAK HYDROPOWER PROJECT Code :
EPC Contractor : SONG DA 5 JOINT STOCK COMPANY Procedure No.:
Sub-Contractor: Lilama10 joint stock companny Acceptance criteria:
Item : GS embedded parts Equipment Name :
Type : Serial .: Cal. Due Date
Elements Identification(%)
Specification Material
C Si Mn P S Cr Ni
Material name: Steel plate: T=12 0,17 0,34 1,39 0,23 0,06
Examination date:
PMI RESULTS
Part Elements Identification (%) Result
No Joint No. Size Remark
description C Si Mn P S Cr Ni (ACC/REJ)
Steel plate: 2000x1
1 2303324 0,196 0,324 1,31 0,0269 0.0056 0.0034 0.0048 ACC
T=12 2000
Name: Name:
Date: Date:
1/1
REPORT ON IMAGE OF TESTING MATERIALS BEFORE PUTTING THEM INTO FABRICATION
1/1
INSPECTION REQUEST
To: NPC/TETH Form No: NP-SD5-QC-IR-001
No IR : NP-SD5-QC-IR-001- 2
Date: 16/08/2023
Type of work:
Item for
Address inspection Date and Time Remarks
Inspection
1, NP-SD5-DWG-DED-NA-GS-102-
HME-0001
2, NP-SD5-DWG-DED-NA-GS-102-
HME-0005
Steel structure and equipment factory in
3, NP-SD5-DWG-DED-NA-PI-62-
Ha nam (Thanh Chau ward, Phu ly City, Embeded 17/08/2023 8h30
HME-0001
Ha Nam province)
4, NP-SD5-DWG-DED-NA-BO-51-
HME-0001
5, NP-SD5-DWG-DED-NA-PI-62-
HME-0004
Attachments: ………………………………………………………………………………………………………………
Requested by:
Name: ........................................................................... Signature: .................................. ……............. Date: …………
Reference documents:...….....................................................................…………………………………………………
Note: PARTS EMBEDDED IN CONCRETE
Name: Name:
Date: Date:
1/1
BEFORE WELDING INSPECTION REPORT
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province) Date: 13/08/2023
Item: GS embedded parts No IR: NP-SD5-QC-WI-01- 1
Subcontractor: Lilama10 joint stock companny Form No: NP-SD5-QC-WI-01
Dimension check
Welding grooves Cleaning check
No Item Drawing No Page No follow the drawing Remarks
Acc Rej Acc Rej Acc Rej
Gate shaft stoplog gate- NP-SD5-DWG-DED-NA-GS-102-
1 589 Acc Acc Acc
Group 9 HME-0001
Gate shaft wheel gate- NP-SD5-DWG-DED-NA-GS-102-
2 589 Acc Acc Acc
Group 9 HME-0005
Intake trashracks - Group NP-SD5-DWG-DED-NA-PI-62-
3 448 Acc Acc Acc
11 HME-0001
Bottom outlet radial gate - NP-SD5-DWG-DED-NA-BO-51-
4 20 Acc Acc Acc Anchor10
Group 1 HME-0001
Intake stoplog gates -Group NP-SD5-DWG-DED-NA-PI-62-
5 576 Acc Acc Acc
9 HME-0004
TOTAL 2.222
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-
HME-0003 (Rev 00)
1/2
- Approval drawings: … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … …
………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………
…………
To conclude or other comments
Name: Name:
Date: Date:
2/2
INSPECTION SHEET BEFORE WELDING
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province)
Item: GS embedded parts
Subcontractor: Lilama10 joint stock companny No IR: NP-SD5-QC-WI-01- 2
NP-SD5-DWG-DED-NA-GS-102-
1,1 Steel plate: T=12 12 100 100 12 100 100
HME-0001
NP-SD5-DWG-DED-NA-GS-102-
1,2 Circular steel: D16, L=270 D16 D16 200/70 D16 D16 200/70
HME-0001
NP-SD5-DWG-DED-NA-GS-102-
2,1 Steel plate: T=12 12 100 100 12 100 100
HME-0005
NP-SD5-DWG-DED-NA-GS-102-
2,2 Circular steel: D16, L=270 D16 D16 200/70 D16 D16 200/70
HME-0005
NP-SD5-DWG-DED-NA-PI-62-HME-
3,1 Steel plate: T=12 12 100 100 12 100 100
0001
NP-SD5-DWG-DED-NA-PI-62-HME-
3,2 Circular steel: D16, L=270 D16 D16 200/70 D16 D16 200/70
0001
1/2
Dimension check Dimension check
No Item Drawing No follow the drawing (mm) follow the drawing (mm) Remarks
T H L T H L
NP-SD5-DWG-DED-NA-BO-51-
4,1 Steel plate: T=12 12 100 100 12 100 100
HME-0001
NP-SD5-DWG-DED-NA-BO-51-
4,2 Circular steel: D16, L=270 D16 D16 200/70 D16 D16 200/70
HME-0001
NP-SD5-DWG-DED-NA-PI-62-HME-
5,1 Steel plate: T=12 12 100 100 12 100 100
0004
NP-SD5-DWG-DED-NA-PI-62-HME-
5,2 Circular steel: D16, L=270 D16 D16 200/70 D16 D16 200/70
0004
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-G1B-
GD-00-HME-0003 (Rev 00)
- Approval drawings: … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … …
…………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………
To conclude or other comments
Name: Name:
Date: Date:
2/2
PICTURES BEFORE WELDING INSPECTION
1/3
Pictures 2: Cleaning before fitting
2/3
Pictures 3: Fit - up
3/3
3. INSPECTION AFTER WELDING.
1/1
INSPECTION REQUEST
To: NPC/TETH Form No: NP-SD5-QC-IR-001
No IR : NP-SD5-QC-IR-001- 3
Date: 20/08/2023
Type of work:
Item for
Address inspection Date and Time Remarks
Inspection
1, NP-SD5-DWG-DED-NA-GS-102-
HME-0001
2, NP-SD5-DWG-DED-NA-GS-102-
HME-0005
Steel structure and equipment factory in
3, NP-SD5-DWG-DED-NA-PI-62-
Ha nam (Thanh Chau ward, Phu ly City, Embeded 21/08/2023 8h30
HME-0001
Ha Nam province)
4, NP-SD5-DWG-DED-NA-BO-51-
HME-0001
5, NP-SD5-DWG-DED-NA-PI-62-
HME-0004
Attachments: ………………………………………………………………………………………………………………
Requested by:
Name: ........................................................................... Signature: .................................. ……............. Date: …………
Reference documents:...….....................................................................…………………………………………………
Note: PARTS EMBEDDED IN CONCRETE
Name: Name:
Date: Date:
1/1
AFTER WELDING INSPECTION REPORT
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province) Date:
Item: GS embedded parts No IR: NP-SD5-QC-WI-02- 1
Subcontractor: Lilama10 joint stock companny Form No: NP-SD5-QC-WI-02
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-
HME-0003 (Rev 00)
1/2
- Approval drawings: … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … …
………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………
To conclude or other comments
Reviewed & Verified by Reviewed & Verified by
THE SUBCONTRACTOR THE CONTRACTOR (SD5)
Name: Name:
Date: Date:
2/2
INSPECTION SHEET AFTER WELDING
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province)
Item: GS embedded parts
Subcontractor: Lilama10 joint stock companny No IR: NP-SD5-QC-WI-02- 2
NP-SD5-DWG-DED-NA-GS-102-
Gate shaft stoplog gate- Group 9 212 212 ÷ 213 ±2
HME-0001
NP-SD5-DWG-DED-NA-GS-102-
Steel plate: T=12 212 212 ÷ 213 ±2
HME-0005
NP-SD5-DWG-DED-NA-PI-62-HME-
Steel plate: T=12 212 212 ÷ 213 ±2
0001
NP-SD5-DWG-DED-NA-BO-51-
Steel plate: T=12 212 212 ÷ 213 ±2
HME-0001
NP-SD5-DWG-DED-NA-PI-62-HME-
Steel plate: T=12 212 212 ÷ 213 ±2
0004
1/2
Method for inspection:
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-
0003 (Rev 00)
- Approval drawings: … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … …
………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………
…………
To conclude or other comments
Name: Name:
Date: Date:
2/2
PICTURES AFTER WELDING INSPECTION
1/1
4. INSPECTION SHOP ASSEMBLY.
1/1
INSPECTION REQUEST
To: NPC/TETH Form No: NP-SD5-QC-IR-001
No IR : NP-SD5-QC-IR-001- 4
Date: 24/08/2023
Type of work:
Item for
Address inspection Date and Time Remarks
Inspection
1, NP-SD5-DWG-DED-NA-GS-102-
HME-0001
2, NP-SD5-DWG-DED-NA-GS-102-
HME-0005
Steel structure and equipment factory in
3, NP-SD5-DWG-DED-NA-PI-62-
Ha nam (Thanh Chau ward, Phu ly City, Embeded 25/08/2023 8h30
HME-0001
Ha Nam province)
4, NP-SD5-DWG-DED-NA-BO-51-
HME-0001
5, NP-SD5-DWG-DED-NA-PI-62-
HME-0004
Attachments: ………………………………………………………………………………………………………………
Requested by:
Name: ........................................................................... Signature: .................................. ……............. Date: …………
Reference documents:...….....................................................................…………………………………………………
Note: PARTS EMBEDDED IN CONCRETE
Name: Name:
Date: Date:
1/1
INSPECTION SHOP ASSEMBLY
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province) Date: 25/08/2023
Item: GS embedded parts No IR: NP-SD5-QC-SA-01- 1
Subcontractor: Lilama10 joint stock companny Form No: NP-SD5-QC-SA-01
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-G1B-
GD-00-HME-0003 (Rev 00)
1/2
- Approval drawings: … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … …
……………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………
To conclude or other comments
Reviewed & Verified by Reviewed & Verified by
THE SUBCONTRACTOR THE CONTRACTOR (SD5)
Name: Name:
Date: Date:
2/2
DIAGRAM OF SHOP ASSEMBLY INPECTION REPORT
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province) Date: ########
Item: GS embedded parts No IR: NP-SD5-QC-SA-02- 1
Subcontractor: Lilama10 joint stock companny Form No: NP-SD5-QC-SA-02
- Follow ITP No: NP-SD5-ITP-GEN-G1B-GD-00-HME-0001 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-HME-0002 (Rev 00), NP-SD5-ITP-GEN-G1B-GD-00-
HME-0003 (Rev 00)
1/2
- Approval drawings: … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … … …
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
…………………………………………………………………………………………………………………………………………
To conclude or other comments
Name: Name:
Date: Date:
2/2
5. INSPECTION SURFACE PREPARATION AND PAINT.
1/1
INSPECTION REQUEST
To: NPC/TETH Form No: NP-SD5-QC-IR-001
No IR : NP-SD5-QC-IR-001- 5
Date: 25/08/2023
Type of work:
Item for
Address inspection Date and Time Remarks
Inspection
1, NP-SD5-DWG-DED-NA-GS-102-
HME-0001
2, NP-SD5-DWG-DED-NA-GS-102-
HME-0005
Steel structure and equipment factory in
3, NP-SD5-DWG-DED-NA-PI-62-
Ha nam (Thanh Chau ward, Phu ly City, Embeded 26/08/2023 8h30
HME-0001
Ha Nam province)
4, NP-SD5-DWG-DED-NA-BO-51-
HME-0001
5, NP-SD5-DWG-DED-NA-PI-62-
HME-0004
Attachments: ………………………………………………………………………………………………………………
Requested by:
Name: ........................................................................... Signature: .................................. ……............. Date: …………
Reference documents:...….....................................................................…………………………………………………
Note: PARTS EMBEDDED IN CONCRETE
Name: Name:
Date: Date:
1/1
BLASTING AND PAINTING INSPECTION REPORT
CLIENT: NAMPHAK POWER JOB ITEM: HYDRO - MECHANICAL WORK
PROJECT: NAMPHAK HYDROELECTRONIC POWER No IR: NP-SD5-QC-PT-01- 1
EQUIPMENT: PARTS EMBEDDED IN CONCRETE Form No: NP-SD5-QC-PT-01
BLASTING PRIMER 1st coat 2nd coat 3rd coat SURFACE PREPARATION
DATE 27/08/2023 27/08/2023 METHOD SA 2.5
TIME 14:00:00 PM 16:00:00 PM STANDARD ISO 8501-1
WEATHER Sunny Sunny TYPE OF ABRASTIVE
TEMPERATURE (*Celcius) 36 ˚C 35 ˚C 5 ˚C PROFILE GRADE
RELATIVE HUMITIDY (%) 70% 70% 70%
STELL SUBSTRATE (*Celcius) 30 ˚C 30 ˚C
PAINT SYSTEMS
No of Spec DFT Average DFT
Type product Batch No Method of application Colour Remark
coat (microns) (microns)
1 HEMPADUR ZINC 15570 483040135 Airless spray 70
Name: Name:
Date: Date:
1/1
PICTURES AFTER WELDING INSPECTION
1/4
Pictures 2: Cleaning
2/4
Pictures 3: Inspection DFT
3/4
.
.
.
4/4
6. READY FOR DELIVERY.
1/1
INSPECTION REQUEST
To: NPC/TETH Form No: NP-SD5-QC-IR-001
No IR : NP-SD5-QC-IR-001- 6
Date: 28/08/2023
Type of work:
Item for
Address inspection Date and Time Remarks
Inspection
1, NP-SD5-DWG-DED-NA-GS-102-
HME-0001
2, NP-SD5-DWG-DED-NA-GS-102-
HME-0005
Assembly yard for lilama 10, group 8 of
3, NP-SD5-DWG-DED-NA-PI-62-
Tan Thinh Ward, Hoa Binh City, Hoa Binh Embeded 29/08/2023 8h00
HME-0001
Province.
4, NP-SD5-DWG-DED-NA-BO-51-
HME-0001
5, NP-SD5-DWG-DED-NA-PI-62-
HME-0004
Attachments: ………………………………………………………………………………………………………………
Requested by:
Name: ........................................................................... Signature: .................................. ……............. Date: …………
Reference documents:...….....................................................................…………………………………………………
Note: PARTS EMBEDDED IN CONCRETE
Name: Name:
Date: Date:
1/1
READY FOR DELIVERY
Location: Steel structure and equipment factory in Ha nam (Thanh Chau ward, Phu ly City, Ha Nam province) Date:
Item: GS embedded parts No IR: NP-SD5-QC-RD-01- 1
Subcontractor: Lilama10 joint stock companny Form No: NP-SD5-QC-RD-01
THE SUBCONTRACTOR THE CONTRACTOR (SD5) THE OWNER’S ENGINEER THE OWNER
1/1
PICTURES INSPECTION PACKAGING AND TRANSPORT
Pictures 1: Packaging
1/1