0 SCOPE
The scope of the present report is to analyse and design of pump foundation for vertical crude pump
205-P-027A/B/C at Paradip, Orissa
Concrete
Concrete grade shall be M30 with fck (characteristic strength, 28 days). = 30 N/mm2
Unit Weight of Concrete gc 2.5 T/m3
Reinforcement Steel:
As per IS:1786, Grade Fe 415 with fy = 415 N/mm2
Bar diameters used (mm) : 8, 10, 12, 16
Foundation Data
Elevations
Finished Ground Level, FGL EL. 99.850
Top Of Grout, TOG EL. 100.450
Finished Floor Level, FFL EL. 100.300
Equipment Data
Weight of Motor, Wm 1800 Kg
2.000m
0.300m
EL.100.300
2.816m 0.800m
0.200m
2.000m
PLAN
1.200m
1.650m
1.395m Dia.
0.995m Dia.
Cross-Sectional Elevation
t
TOG
0.150m
EL.100.450
1.650m (sq.)
EL.96.834
FGL
EL.99.650
3.0 DESIGN OF FOUNDATION
Area, Ap 1.94 m2
Volume, Vp 1.56 m3
Weight, Wp 3.89 T
Shaft
Area, As 0.75 m2
Sectional modulus of shaft, Zs 0.17 m3
Volume, Vs 2.11 m3
Weight, Ws 5.29 T
Raft
Area, Ar 4.00 m2
Volume, Vr 1.20 m3
Weight, Wr 3.00 T
Soil
Weight of soil, Wsoil 12.53 T
CG of motor = 1012.50 mm
mm CG considered at
mid height of each
CG of pump+barrel+sole plate = 2460.00 mm
component
mm
CG of Pump System w.r.t to bottom of base plate = -139.00 mm
Max. Min.
0.439 N/mm2 0.176 N/mm2
Critical Length
2.000m
1.3950m
Sketch - 1
PMC:
INSTALLATION, OPERATION AND MAINTENANCE OF CRUDE AND FINISHED PRODUCTS TANKAGES FACILITY
OWNER
AT :
PARADIP REFINERY PROJECT, PARADIP ON BUILD-OWN-OPERATE-TRANSFER (BOOT) BASIS
Sheet 5 of 7 .
PMC:
INSTALLATION, OPERATION AND MAINTENANCE OF CRUDE AND FINISHED PRODUCTS TANKAGES FACILITY
OWNER
AT :
PARADIP REFINERY PROJECT, PARADIP ON BUILD-OWN-OPERATE-TRANSFER (BOOT) BASIS
3.25 1.055
3.30 1.075
3.35 1.095
3.40 1.115
3.45 1.135
3.50 1.156
3.55 1.176
3.60 1.197
3.65 1.218
3.70 1.239
3.75 1.26
3.80 1.281
3.85 1.303
3.90 1.325
3.95 1.347
4.00 1.369
4.05 1.391
4.10 1.414
4.15
4.20
4.25
4.30
4.35
4.40
4.45
Sheet 6 of 7 .
PMC:
INSTALLATION, OPERATION AND MAINTENANCE OF CRUDE AND FINISHED PRODUCTS TANKAGES FACILITY
OWNER
AT :
PARADIP REFINERY PROJECT, PARADIP ON BUILD-OWN-OPERATE-TRANSFER (BOOT) BASIS
Sheet 7 of 7 .